[{"data":1,"prerenderedAt":1632},["ShallowReactive",2],{"blog-zh-CN-correctly-estimating-release-deadline":3,"blog-related-zh-CN-correctly-estimating-release-deadline":219,"blog-chapter-zh-CN-correctly-estimating-release-deadline":678},{"id":4,"title":5,"author":6,"body":7,"dateModified":191,"datePublished":192,"description":193,"extension":194,"heading":195,"image":196,"imageAlt":16,"keywords":197,"locale":203,"meta":204,"navigation":205,"path":206,"reviewed":205,"seo":207,"sitemap":208,"slug":216,"stem":217,"translationKey":216,"__hash__":218},"blog\u002Fblog\u002Fzh-CN\u002Fcorrectly-estimating-release-deadline.md","如何用故事点估算发布日期 | AELBOX","AELBOX",{"type":8,"value":9,"toc":174},"minimark",[10,22,25,29,38,42,45,55,60,63,66,69,72,75,83,87,90,93,96,99,102,105,113,117,120,123,126,129,137,141,144,147,152,159,167,171],[11,12,13],"p",{},[14,15],"img",{"alt":16,"height":17,"loading":18,"src":19,"width":20,"fetchPriority":21},"桌上的 Planning Poker 卡片、甘特图和咖啡杯",960,"eager","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",1600,"high",[11,23,24],{},"估算项目的发布日期是项目管理的重要组成部分。但面对一个庞大而复杂的系统，你该如何预测它的交付时间？",[26,27,28],"h2",{"id":28},"估算的难题",[11,30,31,32,37],{},"要按时交付，就需要对工作量做出可靠的估算。",[33,34,36],"a",{"href":35},"\u002Fzh-CN\u002Fblog\u002Fthe-importance-of-predictable-velocity","估算任务通常很困难","，尤其是当你必须为每个任务承诺基于时间的估算时。从心理上说，承诺一个完成时间并不容易，而这些承诺往往落空。",[39,40,41],"h3",{"id":41},"时间估算的问题",[11,43,44],{},"用时间估算有个简单的原因：任务越复杂，错过截止日期的可能性就越大。它还取决于任务由谁接手。团队成员的工作节奏不同，产出也各不相同。由于可用率会随休假和培训而变化，由最快成员估算的任务，最终可能落到最慢的人手上。原本整齐的甘特图变得一团糟：任务不断逾期，管理者时刻担心项目能否按时完成。",[11,46,47],{},[14,48],{"alt":49,"height":50,"loading":51,"src":52,"width":53,"decoding":54},"被打乱的甘特图",351,"lazy","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,"async",[11,56,57],{},[58,59,49],"em",{},[39,61,62],{"id":62},"对时间估算的抵触",[11,64,65],{},"当实现者被要求给出估算时，他们往往会抵触：如果估算没达成，责任算谁的？如果一个人估算的任务最终交给别人，实际耗时对不上时，又该怪谁？",[11,67,68],{},"结果就是大家干脆不愿意估算，管理层也因此难以准确估算交付日期。",[26,70,71],{"id":71},"使用故事点",[11,73,74],{},"故事点提供了时间估算之外的另一种选择。故事点不是固定的工作量单位，而是一种按指数增长的相对估算。整个团队在梳理期间一起估算。",[11,76,77],{},[14,78],{"alt":79,"height":80,"loading":51,"src":81,"width":82,"decoding":54},"估算示例",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[11,84,85],{},[58,86,79],{},[39,88,89],{"id":89},"共担责任",[11,91,92],{},"使用故事点时，每个任务都由整个团队估算。当所有人达成一致，估算即被接受。这样就避免了日后争论任务是谁估算的、实际又花了多久。团队事先已经达成共识，责任自然由大家共担。",[39,94,95],{"id":95},"估算复杂度",[11,97,98],{},"故事点反映任务的复杂度，包括外部依赖以及可能出现问题的风险。由于它们不是对时间这类物理指标的承诺，团队给出估算时也更轻松。",[39,100,101],{"id":101},"最小估算",[11,103,104],{},"由于故事点是相对的，你需要一个起点作为锚点。这个锚点就是需要一定实现工作量的最小工作单元，也是团队能够估算的最小工作量。",[11,106,107],{},[14,108],{"alt":109,"height":110,"loading":51,"src":111,"width":112,"decoding":54},"最低估算",206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[11,114,115],{},[58,116,109],{},[39,118,119],{"id":119},"最大估算",[11,121,122],{},"故事点按指数增长，说明任务越复杂就越难估算。这个刻度可以延伸到无穷大（∞），尽管几乎没人会用到。最大的估算值应当是一个人平均在一个冲刺内能完成的最大工作量。冲刺长度本身也应与一个人在不失控的前提下能处理的最大工作量相匹配。",[39,124,125],{"id":125},"超出最大估算的故事",[11,127,128],{},"有些任务得到的故事点超过了一个人在一个冲刺内能完成的工作量。把它们放进冲刺，就会造成遗留。遗留会让冲刺显得不完整，也让工作显得没做完。估算超过这一上限的任务，必须拆分成更小的单元并重新估算。",[11,130,131],{},[14,132],{"alt":133,"height":134,"loading":51,"src":135,"width":136,"decoding":54},"拆分 13 个故事点",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[11,138,139],{},[58,140,133],{},[26,142,143],{"id":143},"故事点速度",[11,145,146],{},"速度是指团队在满可用率下，每个冲刺平均完成的故事点数。可用率是指团队在扣除休假、培训和支持工作后，实际能投入项目工作的冲刺时间占比。容量等于速度乘以可用率。",[11,148,149],{},[58,150,151],{},"容量 = 速度 × 可用率",[11,153,154,155,158],{},"由于容量以故事点表示，可以用团队的故事点与时间的换算比例把它转换成时间。当",[33,156,157],{"href":35},"速度可预测","时，发布日期就能被精确估算。以故事点和冲刺为基础，得到的甘特图稳定而可预测：",[11,160,161],{},[14,162],{"alt":163,"height":164,"loading":51,"src":165,"width":166,"decoding":54},"恢复秩序的甘特图",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[11,168,169],{},[58,170,163],{},[11,172,173],{},"这就是关键转变：一旦速度稳定下来，发布日期就成了一道计算题，而不是一次猜测。",{"title":175,"searchDepth":176,"depth":176,"links":177},"",2,[178,183,190],{"id":28,"depth":176,"text":28,"children":179},[180,182],{"id":41,"depth":181,"text":41},3,{"id":62,"depth":181,"text":62},{"id":71,"depth":176,"text":71,"children":184},[185,186,187,188,189],{"id":89,"depth":181,"text":89},{"id":95,"depth":181,"text":95},{"id":101,"depth":181,"text":101},{"id":119,"depth":181,"text":119},{"id":125,"depth":181,"text":125},{"id":143,"depth":176,"text":143},"2026-11-21","2018-04-14","当复杂度和可用率发生变化时，基于时间的估算就会失效。了解故事点、共同估算和速度如何让发布日期变得可预测。","md","如何估算发布日期","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[198,199,200,201,202],"发布日期","故事点","敏捷估算","冲刺速度","容量规划","zh-CN",{},true,"\u002Fblog\u002Fzh-cn\u002Fcorrectly-estimating-release-deadline",{"title":5,"description":193},{"loc":206,"images":209,"lastmod":191},[210,211,212,213,214,215],{"loc":19},{"loc":52},{"loc":81},{"loc":111},{"loc":135},{"loc":165},"correctly-estimating-release-deadline","blog\u002Fzh-CN\u002Fcorrectly-estimating-release-deadline","domrUbLQNygCG8IqEbb2qv4NL1EggMHUDp8Nxv0vzLo",[220,386,524],{"id":221,"title":222,"author":6,"body":223,"dateModified":191,"datePublished":365,"description":366,"extension":194,"heading":367,"image":368,"imageAlt":229,"keywords":369,"locale":203,"meta":375,"navigation":205,"path":376,"reviewed":205,"seo":377,"sitemap":378,"slug":383,"stem":384,"translationKey":383,"__hash__":385},"blog\u002Fblog\u002Fzh-CN\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","冲刺依赖与链式拉取请求 | AELBOX",{"type":8,"value":224,"toc":347},[225,231,234,241,245,248,256,259,262,265,268,271,274,277,280,283,287,290,298,302,305,308,311,314,317,320,323,326,329,332,335,338,341,344],[11,226,227],{},[14,228],{"alt":229,"height":17,"loading":18,"src":230,"width":20,"fetchPriority":21},"桌上的金属链条、Planning Poker 卡片和咖啡杯","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",[11,232,233],{},"冲刺中经常包含相互依赖的工作项，可能出现在一个团队内部，也可能跨多个 Scrum 团队。理想情况下，依赖本不该存在；但在现实中，业务需求优先，为了缩短发布周期，依赖被加了进来。本文介绍软件团队管理依赖任务的一种方法。",[11,235,236],{},[14,237],{"alt":238,"height":239,"loading":51,"src":240,"width":239,"decoding":54},"任务之间的依赖",336,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png",[11,242,243],{},[58,244,238],{},[26,246,247],{"id":247},"传统做法",[11,249,250,251,255],{},"最直接的做法是：等依赖项合并进主分支后，立刻开始任务。这样一来，一些成员会在任务就绪之前一直闲着。最终，剩下的依赖任务几乎没有时间可用。最后几个任务被遗留到下一个冲刺，",[33,252,254],{"href":253},"\u002Fzh-CN\u002Fblog\u002Fcomparison-metrics-for-agile-teams","团队自然不高兴","。",[11,257,258],{},"为什么容量估算正确，却还是会发生这种情况？主要原因是等待同事完成工作时的空闲时间。即便是很小的延误也会累积，在短冲刺中尤其明显。",[26,260,261],{"id":261},"同时处理有依赖的任务",[11,263,264],{},"有一种方法可以做到这一点，只需付出很小的额外成本。当团队成员同时处理任务时，有几项好处。",[39,266,267],{"id":267},"更好的协作",[11,269,270],{},"当成员同时处理有依赖的任务时，这种方式类似结对编程。一个人必须理解上游任务，另一个人必须理解下游任务。团队对所解决的问题因此有了更广的了解。",[39,272,273],{"id":273},"避免空闲时间",[11,275,276],{},"任务并行推进时，没有人需要等某个修复落地。大家可以同时工作，遇到问题时也能随时讨论。",[39,278,279],{"id":279},"拉取请求更早进入代码评审",[11,281,282],{},"当你的分支基于同事的分支时，批准最初的拉取请求会更容易。你已经了解上游工作项是如何实现的，而原分支在整个实现过程中经过了测试和评审。它不再是陌生的领域。",[26,284,286],{"id":285},"使用链式堆叠式拉取请求","使用链式（堆叠式）拉取请求",[11,288,289],{},"这种程度的并行需要合适的工具。基于 Git 的版本控制就能直接做到。下面的步骤描述了这一过程。",[11,291,292],{},[14,293],{"alt":294,"height":295,"loading":51,"src":296,"width":297,"decoding":54},"依赖树（同时处理 6 个有依赖的任务）",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[11,299,300],{},[58,301,294],{},[39,303,304],{"id":304},"清晰勾勒依赖关系",[11,306,307],{},"在冲刺规划期间定义依赖链。之后，拉取请求链严格遵循这个定义。开发中途修改链条的代价很高，因为需要变基。",[39,309,310],{"id":310},"先从根任务开始",[11,312,313],{},"每条依赖链都有不依赖任何其他任务的根任务。它们的工作可以从第一天就开始。",[39,315,316],{"id":316},"先完成核心实现",[11,318,319],{},"这可能与测试驱动开发相冲突，因为后者要求先写测试。为了让拉取请求链保持可控，先实现核心部分。这样，依赖它的成员能更早拿到可用的代码。",[39,321,322],{"id":322},"按先进先出队列组织代码评审",[11,324,325],{},"最先创建的分支应最先评审和合并。每次合并都会触发 CI；如果它破坏了主构建，问题还能在影响尚小时就被修复。",[26,327,328],{"id":328},"额外成本",[11,330,331],{},"维护一条依赖分支链有好处，也有一些代价。",[39,333,334],{"id":334},"变基与合并",[11,336,337],{},"链条必须保持同步，这需要付出精力。现代工具在没有冲突时提供与基础分支的一键同步。在安全的情况下按需使用，把上游变更拉进来。构建通过、功能正常时，就同步。",[39,339,340],{"id":340},"团队协作",[11,342,343],{},"依赖链需要一个愿意彼此沟通、善于协作的团队。如果大家各自为战，这套方法就行不通。",[11,345,346],{},"有依赖的工作项最好放在当前冲刺之外。当业务需求要求它们并行推进时，用一条派生分支组成的链来管理依赖带来的额外成本，是一种切实可行的办法。",{"title":175,"searchDepth":176,"depth":176,"links":348},[349,350,355,361],{"id":247,"depth":176,"text":247},{"id":261,"depth":176,"text":261,"children":351},[352,353,354],{"id":267,"depth":181,"text":267},{"id":273,"depth":181,"text":273},{"id":279,"depth":181,"text":279},{"id":285,"depth":176,"text":286,"children":356},[357,358,359,360],{"id":304,"depth":181,"text":304},{"id":310,"depth":181,"text":310},{"id":316,"depth":181,"text":316},{"id":322,"depth":181,"text":322},{"id":328,"depth":176,"text":328,"children":362},[363,364],{"id":334,"depth":181,"text":334},{"id":340,"depth":181,"text":340},"2018-05-27","有依赖的工作项会让冲刺停滞，大家都在等待。了解堆叠式拉取请求如何让工作持续流动，并减少空闲时间。","用链式拉取请求管理冲刺依赖","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[370,371,372,373,374],"冲刺依赖","堆叠式拉取请求","链式拉取请求","代码评审","敏捷交付",{},"\u002Fblog\u002Fzh-cn\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":222,"description":366},{"loc":376,"images":379,"lastmod":191},[380,381,382],{"loc":230},{"loc":240},{"loc":296},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fzh-CN\u002Fmanage-sprint-dependencies-with-chained-pull-requests","9HWk5FBczoQcum_xZW8g0Ulmu7K8ofCsJ-pKr0hIWkw",{"id":387,"title":388,"author":6,"body":389,"dateModified":191,"datePublished":503,"description":504,"extension":194,"heading":505,"image":506,"imageAlt":395,"keywords":507,"locale":203,"meta":513,"navigation":205,"path":514,"reviewed":205,"seo":515,"sitemap":516,"slug":521,"stem":522,"translationKey":521,"__hash__":523},"blog\u002Fblog\u002Fzh-CN\u002Fcomparison-metrics-for-agile-teams.md","敏捷团队的对比指标 | AELBOX",{"type":8,"value":390,"toc":494},[391,398,401,404,407,415,419,422,425,428,431,439,443,451,454,457,460,467,471,474,481,484,488,491],[11,392,393],{},[14,394],{"alt":395,"height":396,"loading":18,"src":397,"width":20,"fetchPriority":21},"桌上的直尺、Planning Poker 卡片和咖啡杯",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[11,399,400],{},"比较敏捷团队并不容易，也值得问一问：我们究竟为什么要比较？把不同领域的团队放在一起对比，到底有什么帮助？",[26,402,403],{"id":403},"营造良性竞争",[11,405,406],{},"不应该用随意挑选的指标给团队排名，那只会打击士气。相反，指标应当让每个团队都有平等竞争的机会。这样，绩效的提升源自团队自身的意愿，而不是有人在一旁催促。",[11,408,409],{},[14,410],{"alt":411,"height":412,"loading":51,"src":413,"width":414,"decoding":54},"营造竞争氛围",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[11,416,417],{},[58,418,411],{},[26,420,421],{"id":421},"创造平等机会的指标",[11,423,424],{},"以下是四项用于比较团队的基础指标。它们只衡量每个团队在公平条件下竞争的能力，仅此而已。可比的指标创造平等的机会。",[39,426,427],{"id":427},"成功的冲刺",[11,429,430],{},"如果冲刺只是一个时间区间，那它毫无意义。冲刺是一个里程碑，需要有一个目标。冲刺目标（最重要的一组故事）是较大的里程碑，完成每一个故事则是较小的里程碑。在每个冲刺结束时举行跨团队演示，让各团队展示自己交付的成果。这种良性竞争会鼓励团队完成冲刺目标。人需要一个看得见的目标才有动力。",[11,432,433],{},[14,434],{"alt":435,"height":436,"loading":51,"src":437,"width":438,"decoding":54},"朝着目标冲刺",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[11,440,441],{},[58,442,435],{},[11,444,445,446,450],{},"这会不会变成一场过度承诺与刻意少承诺的游戏？如果团队承诺不足，演示会暴露一切：能展示的东西更少。如果承诺过多，演示就成了",[447,448,449],"strong",{},"又一次失败的冲刺","。交付自己所承诺的内容，会积累做得更多的动力，团队也会对工作感到满意。",[39,452,453],{"id":453},"速度的稳定性与诚实估算",[11,455,456],{},"这是知识工作，不是流水线作业。如果团队里没有人足够理解某个问题、能够估算它的解决方案，那就说明这个问题事先没有得到充分调研。",[11,458,459],{},"在上一个冲刺中安排一次限时调研，然后由团队一起评审调研结果，就能轻松地把实现拆成更小的故事并妥善估算。对于复杂的工作，可以写一份更完整的技术设计文档，列出各个实现故事。",[11,461,462,463,255],{},"调研和设计工作本身就是可以被估算的故事。关键在于为复杂的解决方案定义工作的结构和顺序。与其承诺一个团队并不理解的故事，不如创建一个调研任务来填补空白。这样，估算才",[33,464,466],{"href":465},"\u002Fzh-CN\u002Fblog\u002Fsheepherding-story-points","有据可依",[39,468,470],{"id":469},"容量的可预测性避免意外工作","容量的可预测性（避免意外工作）",[11,472,473],{},"先调研，后实现。随着调研暴露出问题，新的工作项被创建并估算。这样，你对下一个冲刺的把握就清晰得多。已知的工作可以被估算和规划；未知的工作先获得一个限时的调研工作项，然后再估算。这里的关键纪律，是把大块工作拆成小块、可估算的部分。",[11,475,476,477,255],{},"复杂的工作可以提前启动，哪怕只是为了发现它需要自己的一套故事。这仍然降低了",[33,478,480],{"href":479},"\u002Fzh-CN\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","未知带来的风险",[11,482,483],{},"支持和生产环境救火通常以限时的看板流程在冲刺之外运行。在那里，首次响应时间和 SLA 违规次数就成了对比指标。",[39,485,487],{"id":486},"团队可用率任务时间除以冲刺总时间","团队可用率（任务时间除以冲刺总时间）",[11,489,490],{},"可用率是指团队成员花在已估算工作上的时间占比。如果某个团队比其他团队更频繁地被拉去参加培训、知识分享或其他内部工作，就要纠正这种失衡。保持速度稳定的唯一办法，是保持可用率稳定。当各团队之间的可用率相当时，其他对比指标才能发挥作用。",[11,492,493],{},"比较团队不是为了惩罚表现不佳者，而是为了提升动力，以及竞争和交付更多的意愿。正因如此，这些指标不应让团队成员个人看到：它们是辅导工具，而不是公开排行榜。通过跟踪这些指标并间接引导 Scrum Master，你能让各团队站在同一起跑线上竞争。",{"title":175,"searchDepth":176,"depth":176,"links":495},[496,497],{"id":403,"depth":176,"text":403},{"id":421,"depth":176,"text":421,"children":498},[499,500,501,502],{"id":427,"depth":181,"text":427},{"id":453,"depth":181,"text":453},{"id":469,"depth":181,"text":470},{"id":486,"depth":181,"text":487},"2018-05-04","指标应当创造公平的起点，而不是排行榜。四项对比指标，既能激励敏捷团队，又不会惩罚他们。","敏捷团队的对比指标","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[508,509,510,511,512],"敏捷指标","团队速度","敏捷团队","Scrum","容量",{},"\u002Fblog\u002Fzh-cn\u002Fcomparison-metrics-for-agile-teams",{"title":388,"description":504},{"loc":514,"images":517,"lastmod":191},[518,519,520],{"loc":397},{"loc":413},{"loc":437},"comparison-metrics-for-agile-teams","blog\u002Fzh-CN\u002Fcomparison-metrics-for-agile-teams","QZbrcKPUFp3IzMTSASesw2G1BOOvVyYLtbpROgZjQW8",{"id":525,"title":526,"author":6,"body":527,"dateModified":191,"datePublished":657,"description":658,"extension":194,"heading":659,"image":660,"imageAlt":533,"keywords":661,"locale":203,"meta":664,"navigation":205,"path":665,"reviewed":205,"seo":666,"sitemap":667,"slug":675,"stem":676,"translationKey":675,"__hash__":677},"blog\u002Fblog\u002Fzh-CN\u002Fsheepherding-story-points.md","羊群效应与故事点：Planning Poker 中的锚定 | AELBOX",{"type":8,"value":528,"toc":648},[529,535,538,541,548,555,559,562,565,568,575,579,582,585,588,593,597,600,603,610,614,617,620,625,629,632,642,645],[11,530,531],{},[14,532],{"alt":533,"height":17,"loading":18,"src":534,"width":20,"fetchPriority":21},"茶几上的一群绵羊和 Planning Poker 卡片","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[11,536,537],{},"故事点估算常常被忽视，或者在聊天室和公开会议中进行，每个人的投票都能被看到或听到。知道别人如何投票会扭曲结果，产生不准确的估算。一再失准的估算会导致计划有缺陷，交付延期甚至取消。下面就是公开投票中发生的事情。",[26,539,540],{"id":540},"投票中的几类角色",[11,542,543,544,547],{},"在一场公开的估算投票中，会出现几类典型角色。估算结果取决于谁先出牌，而且通常离诚实相去甚远。为什么在公开投票中顺序如此重要？因为",[447,545,546],{},"羊群效应","：这种锚定偏差会让其他成员照搬第一个估算。",[11,549,550],{},[14,551],{"alt":546,"height":552,"loading":51,"src":553,"width":554,"decoding":54},746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[11,556,557],{},[58,558,546],{},[39,560,561],{"id":561},"过度自信的投票者",[11,563,564],{},"每个团队至少有一名成员认为自己最了解系统。他们通常第一个投票，因为答案在他们看来显而易见。他们常常忽略那些可能让估算偏离正轨的细节。这些细节本可以提前发现，但前提是有人发起讨论。而在公开投票中，这不可能发生。",[11,566,567],{},"这个人给出的估算通常低于诚实的水平。也许只有他们能这么快完成这个故事，而且还得靠运气。",[11,569,570],{},[14,571],{"alt":561,"height":572,"loading":51,"src":573,"width":574,"decoding":54},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[11,576,577],{},[58,578,561],{},[11,580,581],{},"其他人纷纷跟随，于是任务看起来很简单，仿佛在规定时间内谁都能完成。实际上，最后通常由别人来做。",[39,583,584],{"id":584},"沉默的投票者",[11,586,587],{},"沉默的投票者通常不止一个，他们不敢先投票，会等别人先出牌，然后照着抄。他们很少参与讨论，只在被问到时才回答。他们第二个投票，正好排在心不在焉的投票者之前。",[11,589,590],{},[14,591],{"alt":584,"height":572,"loading":51,"src":592,"width":574,"decoding":54},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[11,594,595],{},[58,596,584],{},[39,598,599],{"id":599},"心不在焉的投票者",[11,601,602],{},"在实现阶段很难抓住他们，但在投票时他们的表现一目了然。他们总是最后投票，并照抄别人的估算。如果几个估算不一致，他们就挑最常见的那一个。他们不愿解释为什么选了更低或更高的数字，因此在梳理中回避协作，也躲闪问题。",[11,604,605],{},[14,606],{"alt":599,"height":607,"loading":51,"src":608,"width":609,"decoding":54},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[11,611,612],{},[58,613,599],{},[39,615,616],{"id":616},"疲惫的投票者",[11,618,619],{},"有些成员无法长时间保持专注，会错过讨论中的关键部分。他们失去上下文，于是要么随口猜一个，要么找出最常见的投票抄下来。",[11,621,622],{},[14,623],{"alt":616,"height":572,"loading":51,"src":624,"width":574,"decoding":54},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[11,626,627],{},[58,628,616],{},[26,630,631],{"id":631},"如何在估算过程中保持专注",[11,633,634,635,639,640,255],{},"估算之所以重要，是因为只有诚实的故事点才能",[33,636,638],{"href":637},"\u002Fzh-CN\u002Fblog\u002Fcorrectly-estimating-release-deadline","让项目按计划走向发布日期","。无论使用纸质卡片还是软件，诚实估算的关键都在于对抗",[447,641,546],{},[11,643,644],{},"在主持人揭晓之前，团队成员绝不应该看到彼此的估算。这样，沉默的投票者开始思考，心不在焉的投票者产生兴趣，疲惫的投票者也清醒过来。最值得问的问题，尤其是当有人与团队意见不同时，是“你为什么投了 X 个故事点？”这会开启一场关于真实实现问题的对话。而“你同意 X 个故事点吗？”这类封闭式问题，只会换来一句毫无意义的“同意”。",[11,646,647],{},"好的估算工具能让梳理更有参与感，让每个人保持警觉、随时愿意讨论，即使是复杂的故事也能得到更好的估算。",{"title":175,"searchDepth":176,"depth":176,"links":649},[650,656],{"id":540,"depth":176,"text":540,"children":651},[652,653,654,655],{"id":561,"depth":181,"text":561},{"id":584,"depth":181,"text":584},{"id":599,"depth":181,"text":599},{"id":616,"depth":181,"text":616},{"id":631,"depth":176,"text":631},"2018-04-30","公开投票会让第一个估算锚定全场。看看羊群效应如何扭曲故事点，以及如何诚实地开展 Planning Poker。","羊群效应与故事点","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[199,662,663,546,200],"Planning Poker","锚定偏差",{},"\u002Fblog\u002Fzh-cn\u002Fsheepherding-story-points",{"title":526,"description":658},{"loc":665,"images":668,"lastmod":191},[669,670,671,672,673,674],{"loc":534},{"loc":553},{"loc":573},{"loc":592},{"loc":608},{"loc":624},"sheepherding-story-points","blog\u002Fzh-CN\u002Fsheepherding-story-points","NSDqMFV96McI3KuKdQwrAbF7S9efeahz8eMEuTExyxw",{"id":679,"title":680,"body":681,"dateModified":191,"datePublished":1618,"description":1619,"extension":194,"heading":202,"image":1620,"imageAlt":202,"keywords":1621,"locale":203,"meta":1622,"navigation":205,"order":1623,"path":1624,"section":1625,"seo":1626,"sitemap":1627,"slug":1628,"stem":1629,"translationKey":1630,"__hash__":1631},"guide\u002Fguide\u002Fzh-CN\u002Fcapacity-planning.md","容量规划 | Scrumpy Planning Poker",{"type":8,"value":682,"toc":1603},[683,686,693,696,715,748,753,755,768,771,785,791,797,804,807,810,814,871,881,884,887,890,899,914,917,924,931,958,971,974,979,991,1000,1007,1013,1033,1036,1042,1062,1065,1082,1085,1091,1094,1097,1123,1126,1136,1139,1145,1148,1151,1184,1190,1193,1196,1231,1234,1247,1254,1257,1260,1265,1297,1300,1303,1306,1325,1331,1334,1359,1407,1413,1415,1424,1430,1433,1442,1445,1454,1474,1477,1480,1483,1509,1515,1531,1534,1560,1563,1566,1569,1598],[11,684,685],{},"容量规划帮助 Scrum 团队决定接下来的冲刺能容纳多少工作。Scrumpy 会查看团队在最近冲刺中完成的估算。每位团队成员的平均值就是你的速度。以故事点估算的面板使用故事点，以时间估算的面板使用原始时间估算，并将其显示为 2 天、4 小时等时长。容量使用所选面板上配置的估算字段。如果空间还有另一个故事点字段，则以面板的字段为准。",[11,687,688,689,692],{},"随后，Scrumpy 会将已为后续冲刺计划的工作与团队实际拥有的容量进行比较。当前或未来冲刺的目标容量是每位成员的速度乘以该冲刺的团队规模，再根据团队的利用率和休假进行调整。",[447,690,691],{},"偏差","下拉列表设置计划可以偏离目标多远，超过后徽章会变为绿色或红色。工作周设置决定哪些天算作工作日，以及一个完整工作日计为多少小时。",[11,694,695],{},"在容量规划标签页中，你可以：",[697,698,699,703,706,709,712],"ul",{},[700,701,702],"li",{},"添加用于设定速度的已关闭冲刺，以及你想规划的活动或未来冲刺。",[700,704,705],{},"在一个表格中查看每个冲刺及其工作项，包括估算总计和目标范围。",[700,707,708],{},"调整每位团队成员在该冲刺中的利用率和工作时长。",[700,710,711],{},"为工作项排名，或打开视角标签页并对其投票。",[700,713,714],{},"将计划应用到 Jira，或将冲刺归档到 Confluence。",[11,716,717,718,720,721,724,725,728,729,732,733,735,736,739,740,743,744,747],{},"容量属于某个计划会话。在空间页面上打开",[447,719,202],{},"标签页，并选择一个计划会话标签页。",[447,722,723],{},"创建","按钮会在不离开标签页的情况下创建计划会话。设置计划会话描述后，它会显示在左侧顶部、面板选择器上方，并且只跨越左侧，因此右侧起点更高，表格会对齐。主持人可以点击说明并就地修改。字段失去焦点时会自动保存，没有",[447,726,727],{},"确定","或",[447,730,731],{},"取消","按钮。未设置说明时，主持人会看到可点击添加说明的占位文本。计划会话中的每个面板都保留自己的已计划冲刺、所选冲刺、所选工作项、所选团队成员和打开的右侧标签页。切换会立即生效：面板已保存的冲刺、工作项、团队成员及其估算单位会立即改变，加载新面板时会隐藏上一个面板的冲刺。你在此标签页中已经打开过的面板会立即显示其冲刺，并在后台刷新。切换面板不会清除另一个面板的选择，切换回来会恢复它们。当空间页面打开在",[447,734,202],{},"标签页时，该标签页会连同计划会话标签页一起加载其面板和冲刺，因此表格会一步显示。如果你稍后打开该标签页，它会在你选择它时加载其面板和冲刺。如果空间没有 Scrum 面板，标签页会告知需要 Scrum 面板。新计划会话开始时没有冲刺，因此请使用",[447,737,738],{},"规划冲刺","添加你想规划的冲刺。 相同的计划会话也会显示在",[447,741,742],{},"站会","和",[447,745,746],{},"回顾","标签页中。",[11,749,750],{},[447,751,752],{},"此屏幕上的所有更改都是虚拟的：冲刺、顺序、团队容量和工作项移动都会保留在 Scrumpy 中。只有选择应用后，Jira 才会更改。",[26,754,738],{"id":738},[11,756,757,758,761,762,764,765,255],{},"只有添加到所选面板视图的冲刺才会出现在表格中。选择工具栏中",[447,759,760],{},"从筛选器添加","旁边的",[447,763,738],{},"以打开冲刺选择器。选择器只显示来源面板是操作栏中所选面板的冲刺。来源于另一个面板的冲刺不会列出，也无法添加。每个冲刺的估算以常规徽章显示，例如 ",[447,766,767],{},"3 sp",[11,769,770],{},"选择器有两个标签页：",[697,772,773,779],{},[700,774,775,778],{},[447,776,777],{},"过去的冲刺","列出已关闭的冲刺。具有已保存团队的过去冲刺是计算速度所必需的。请至少选择 3 个过去冲刺以进行适当的速度计算。如果选择较少，速度会根据你选择的冲刺计算。尚未有团队的过去冲刺在团队列中显示 0%，并且不计入；请选择它并先填充其团队。",[700,780,781,784],{},[447,782,783],{},"冲刺","列出活动和未来冲刺。在添加选择之前，请至少选择其中一个。",[11,786,787,788,790],{},"两个标签页都按开始日期列出冲刺，最早的在前。每一行都有一个复选框、冲刺名称及其下方的目标、状态、开始和结束日期以及估算。冲刺列标题为",[447,789,783],{},"，因为每一行是一个冲刺。估算对过去冲刺是已完成估算，对活动或未来冲刺是当前分配的估算。在时间面板上，估算以徽章显示。开始和结束日期是只读的。",[11,792,793,794,796],{},"使用标题中的复选框选择标签页当前列出的所有冲刺。表格右上方，搜索框按名称筛选冲刺。",[447,795,777],{},"标签页还有一个下拉列表，选择显示最近多少个已关闭冲刺：3、6 或 9。默认是 3。选择会在当前浏览器标签页中记住。",[11,798,799,800,803],{},"已在计划会话中的冲刺会显示为已勾选，无法再次选择。仅当至少选择一个活动冲刺时，",[447,801,802],{},"添加","才会启用。过去冲刺是可选的。",[26,805,806],{"id":806},"读取冲刺",[11,808,809],{},"左侧显示合并的冲刺表格。冲刺行和工作项行共享相同的列，因此每个值都垂直对齐：",[811,812],"docs-figure",{"alt":202,"caption":202,"stem":813},"guide-capacity",[697,815,816,822,828,837,846,852,857],{},[700,817,818,821],{},[447,819,820],{},"类型","在冲刺行显示冲刺图标，在工作项行显示工作项类型图标。列标题使用工作项图标。",[700,823,824,827],{},[447,825,826],{},"优先级","以 Jira 颜色显示工作项的 Jira 优先级图标。冲刺行留空。列标题使用中优先级图标。",[700,829,830,833,834,836],{},[447,831,832],{},"冲刺 \u002F 工作项","以粗体显示冲刺名称（会在新标签页中打开 Jira 中的冲刺），或显示工作项键。冲刺目标以小字显示在冲刺名称下方，并保持在一行内：过长的目标会用省略号缩短。主持人在",[447,835,783],{},"标签页中编辑目标。",[700,838,839,842,843,845],{},[447,840,841],{},"排名","显示每个工作项在其冲刺中保存的序号排名。当前和未来冲刺行改为显示仅主持人可用的自定义按钮，没有排名的工作项显示 0。仅当你在列下拉列表中选择",[447,844,841],{},"时，该列才会出现。所有人以只读方式看到保存的数字。",[700,847,848,851],{},[447,849,850],{},"状态","在冲刺行显示冲刺状态。在工作项行，它显示工作项在开始之前的 Jira 状态。进行中的工作项改为显示其完成百分比。在故事点面板上，主持人可以编辑它。在时间面板上，它是只读的，并根据已用时间除以原始时间估算得出。已完成的工作项显示只读的 100%。待办工作项保留其 Jira 状态。",[700,853,854,856],{},[447,855,691],{},"仅在具有偏差的冲刺行显示值。工作项行和没有偏差的冲刺会留空。",[700,858,859,862,863,866,867,870],{},[447,860,861],{},"SP","（故事点面板）和",[447,864,865],{},"时间","（时间面板）在冲刺行显示分配的估算，在工作项行显示估算。故事点值以 ",[447,868,869],{},"sp"," 结尾。时间值是原始时间估算，显示为工作日时长，例如 2 天、4 小时。没有估算的工作项会让该单元格留空。",[11,872,873,875,876,743,878,880],{},[447,874,841],{},"、",[447,877,850],{},[447,879,691],{},"列居中，估算列右对齐。这些列只占用其内容所需的宽度。Scrumpy 通过 Jira 的面板估算读取估算，因此即使估算字段在工作项界面中被隐藏，值和日程也会显示。保存在冲刺计划中但被 Jira 问题级安全对你隐藏的工作项不会出现在表格、排名列表和已移除列表中，因此计划绝不会透露它。仅选中单选按钮的冲刺行会高亮，包括选中的已关闭冲刺。工作项行也以相同方式高亮：仅选中单选按钮的工作项会高亮，未选择任何工作项时没有工作项行高亮。选择工作项还会选择其父冲刺行，因此团队表格和右侧会跟随该冲刺。",[11,882,883],{},"主持人会在第一列看到容量时间线，在第二列看到批量选择复选框。其他人会先看到主持人选择列，第二列是容量时间线。每个活动或未来冲刺行以空心圆开始时间线，每个工作项行有一个圆，冲刺中的最后一个工作项行以空心圆结束它。已关闭的冲刺没有时间线，表格标题也没有线。线和圆使用从第一个工作项到当前行的累计估算，估算总计和两个范围边界都会舍入为整数故事点，或在时间面板上舍入到最接近的小时：低于舍入后的目标容量减去偏差为绿色，位于舍入范围内（含两端）为黄色，高于舍入后的目标容量加上偏差为红色。目标容量是每位成员的速度乘以所选团队的规模，再根据该冲刺的团队容量调整。",[11,885,886],{},"活动和未来冲刺行使用相同的舍入区间以彩色徽章显示其分配的估算。已关闭冲刺行使用下文描述的完成区间显示其分配的估算。",[11,888,889],{},"当前或未来冲刺行后面直接跟随该冲刺的工作项，因此每个工作项都保持分组在其冲刺下。已关闭冲刺行下方没有工作项。",[11,891,892,893,895,896,898],{},"当主持人在视角标签页中接受估算时，工作项行及其冲刺行上的 ",[447,894,861],{}," 或",[447,897,865],{},"值会立即更改。所有打开该标签页的人都会无需重新加载看到新值。如果接受的工作项属于已关闭冲刺，该冲刺的总计和用于目标的速度会重新计算。",[11,900,901,902,905,906,909,910,913],{},"每个冲刺行显示其状态：",[447,903,904],{},"已关闭","、当前运行的冲刺显示",[447,907,908],{},"当前","，或",[447,911,912],{},"未来","。选择冲刺名称会在新标签页中打开 Jira 中的该冲刺。过去冲刺会打开其冲刺报告，当前或未来冲刺会打开面板待办事项。",[11,915,916],{},"使用任意冲刺（包括已关闭冲刺）旁边的单选按钮选择它。所选冲刺驱动团队表格。选择工作项也会选择其父冲刺。",[11,918,919,920,923],{},"使用冲刺行上的复选框选择整个冲刺。至少勾选一个冲刺时，",[447,921,922],{},"移除","会要求你确认，然后从该容量计划中移除这些冲刺及其工作项。Jira 不会更改。它们的草稿计划和团队设置会保留在计划会话中，如果你再次添加该冲刺，它们会恢复。标题复选框仍只选择工作项。批量选择复选框仅对主持人可用，勾选行绝不会与其他参与者共享或随计划会话保存。",[11,925,926,927,930],{},"其他人会看到黄色的 ",[447,928,929],{},"M"," 徽章。它标记主持人所选的冲刺和工作项。无论你是跟随主持人，还是在本地查看其他冲刺或工作项，该徽章都会保持可见，因此你始终知道主持人的当前位置。",[11,932,933,934,936,937,939,940,942,943,946,947,875,949,743,951,954,955,957],{},"合并表格上方左侧是 Scrum 面板选择器，而右侧是列和",[447,935,691],{},"下拉列表。列下拉列表所有人都可用。它开始时选中",[447,938,691],{},"。选择",[447,941,841],{},"可在状态之前添加排名列，选择",[447,944,945],{},"利用率","可在团队容量表格中显示利用率列，清除选项可隐藏其列。主持人会与所有锁定到主持人的参与者共享可见列。如果你在锁定时选择其他选择，就会脱离跟随，并将你自己的选择保留在此浏览器标签页中。主持人可以更改面板和偏差，非主持人以只读方式看到相同值。面板选择随计划会话记住。选择另一个面板时，该面板及其保存的视图会立即应用，表格会显示新面板的冲刺或其加载状态，而不是上一个面板的行。每个面板保留自己的冲刺选择。面板列表将面板分组为",[447,948,199],{},[447,950,865],{},[447,952,953],{},"无估算","。没有估算字段的面板显示在",[447,956,953],{},"下并被禁用。冲刺表格按开始日期列出所选冲刺，最早的在前。",[11,959,960,961,963,964,967,968,255],{},"在",[447,962,691],{},"下拉列表右侧，应用切换按钮会在同一计划会话标签页中打开",[447,965,966],{},"需求梳理\u002F细化","。其工具提示显示",[447,969,970],{},"切换到需求梳理\u002F细化",[11,972,973],{},"速度是在具有已保存团队的所选已关闭冲刺中，每位团队成员的平均已完成估算。在时间面板上，已完成估算是已完成工作项的原始时间估算。每个已关闭冲刺贡献其已完成估算除以有效团队规模：两个利用率为 50% 的人计为一个人，一个完成了 10 个点的 2 人团队贡献每位成员 5 个点。然后对这些每位成员的值取平均，因此团队更大的冲刺不会压过团队更小的冲刺。没有已保存团队的已关闭冲刺在团队列中显示 0%，并且在你填充其团队之前不计入速度。调整已关闭冲刺的团队规模或团队容量会更改其贡献和速度。当你更改团队成员的容量或成员身份时，表格会更新已关闭冲刺的团队值、速度和每个未来目标，在保存完成之前就会更新。如果保存失败，之前的值会恢复。活动或未来冲刺的目标是每位成员的速度乘以该冲刺的有效团队规模，即其人数按利用率和休假调整后的值。例如，2 人完成 10 个点和 4 人完成 15 个点平均为每位成员 4.375 个点，因此一个 3 人满容量的冲刺目标为 13.125 个点。时间线和分配的估算徽章会将计划估算与该目标比较，而不是与速度比较。",[11,975,976,978],{},[447,977,691],{},"列只显示带符号的估算徽章，舍入为整数故事点，或在时间面板上舍入到最接近的小时。对于已关闭冲刺，值是已完成估算与分配估算之间的差：完成较少时为负，完成较多时为正。对于活动或未来冲刺，它改为比较目标容量与完成后的剩余估算：剩余估算低于目标时为正，高于目标时为负。不显示百分比。",[11,980,981,982,984,985,987,988,990],{},"估算列在故事点面板上是 ",[447,983,861],{},"，在时间面板上是",[447,986,865],{},"。它在冲刺行显示分配的估算，在工作项行显示工作项的估算。故事点值以 ",[447,989,869],{}," 结尾。时间值是原始时间估算，显示为工作日时长，例如 2 天、4 小时。工作项估算使用与时间线相同的绿色、黄色和红色区间，根据到该行为止的舍入累计剩余估算计算。活动和未来冲刺徽章使用基于剩余估算的相同舍入目标区间：低于范围为绿色，范围内为黄色，高于范围为红色。已关闭冲刺徽章将舍入后的已完成估算与舍入后的分配范围比较：低于范围为红色，范围内且低于上限（不含上限）为黄色，达到或高于上限为绿色。三种用法都从相同的舍入健康范围计算得出下限和上限。活动和未来冲刺行在该列中只显示该一个估算徽章。",[11,992,993,994,996,997,999],{},"对于活动或未来冲刺，进行中的工作项会在",[447,995,850],{},"列显示其完成百分比。在故事点面板上，主持人可以更改它，其他人以只读方式看到。在时间面板上，它始终只读，并根据已用时间除以原始时间估算得出。派生值会舍入为整数百分比，并保持在 0 到 100 之间，因此超过原始估算的已用时间计为 100%，缺少原始估算计为 0%。已完成的工作项显示只读的 100%。待办工作项没有完成字段。在故事点面板上，百分比会随计划会话保存，绝不会写入 Jira。剩余估算是工作项估算按其完成度减少后的值，因此 2 sp 在 50% 时计为 1 sp，在时间面板上 2 天在 50% 时计为 1 天。已完成工作项计为剩余 0。估算列仍会在冲刺行和工作项行显示原始分配的估算，而",[447,998,691],{},"和时间线使用剩余估算。手动完成不会更改速度。",[11,1001,1002,1003,1006],{},"估算列之后的",[447,1004,1005],{},"团队","列显示用于该冲刺的团队容量百分比。活动和未来冲刺，以及有团队成员的已关闭冲刺，会显示根据这些成员的工作时间和利用率计算出的容量。该值是只读的。没有已保存团队的已关闭冲刺显示 0%，不计入速度；已保存但没有有效容量的团队也显示 0%。工作项行的团队单元格留空。",[11,1008,1009,1010,1012],{},"使用",[447,1011,691],{},"下拉列表允许偏离目标 0%、5%、10%、15%、20% 或 25%。当绝对偏差百分比在该容差范围内时，偏差徽章使用常规样式。超出容差时，正偏差为绿色，负偏差为红色。所选偏差会随计划会话的容量数据保存。",[11,1014,1015,1016,1020,1021,1024,1025,1028,1029,1032],{},"表格下方，一个右对齐的摘要显示“团队以 ",[1017,1018,1019],"span",{},"capacity"," 容量和速度 ",[1017,1022,1023],{},"velocity"," 工作，目标是在 ",[1017,1026,1027],{},"range"," 的健康范围内完成 ",[1017,1030,1031],{},"target","”，容量和速度以信息徽章显示。容量是所选团队的容量百分比舍入为整数，速度是每位成员的速度乘以所选冲刺的团队规模，因此它是该团队满容量时的速度。目标以信息徽章显示，目标容量舍入为整数故事点，或在时间面板上舍入到最接近的小时。健康范围使用两个信息徽章，一个表示下限，一个表示上限，用短横线分隔。两个边界都是时间线和估算徽章使用的相同舍入值。例如，围绕 20.4 sp 的 10% 偏差显示为 18 sp - 22 sp，围绕 2 天 4 小时的偏差显示为 2 天 2 小时 - 2 天 6 小时。当两端舍入为相同值时，单个徽章显示该值。",[26,1034,1035],{"id":1035},"工作项和拖放",[11,1037,1038,1039,1041],{},"冲刺下方的工作项行使用与冲刺行相同的列。",[447,1040,850],{},"列显示工作项自己的 Jira 状态。",[697,1043,1044,1047,1053,1056,1059],{},[700,1045,1046],{},"使用工作项上的单选按钮选择它。选择会随计划会话记住。其父冲刺行也会随之选中。",[700,1048,1049,1050,1052],{},"使用复选框选择工作项进行",[447,1051,922],{},"。标题复选框选择表格中的所有工作项，跨越每个冲刺。",[700,1054,1055],{},"使用冲刺行上的复选框从计划会话中移除该冲刺，如上所述。冲刺复选框与工作项标题复选框分开。",[700,1057,1058],{},"拖动工作项以在其冲刺内重新排序，或将其拖到另一个冲刺行上以移动到该冲刺。",[700,1060,1061],{},"已关闭冲刺只是历史记录，因此没有可拖动的工作项。",[11,1063,1064],{},"选择控件会将其选择存储在所选面板的视图中。只有主持人可以更改共享选择。所选冲刺、工作项、团队成员和右侧标签页会随面板视图记住。",[11,1066,1067,1068,1071,1072,875,1074,875,1076,1078,1079,1081],{},"非主持人在表格下方看到",[447,1069,1070],{},"锁定到主持人","复选框。它默认勾选，因此你的视图会跟随主持人的冲刺、工作项、团队成员、可见列和右侧标签页。它会在同一计划会话中跟随主持人在 ",[447,1073,966],{},[447,1075,202],{},[447,1077,742],{}," 和 ",[447,1080,746],{}," 标签页之间切换。它适用于你当前所在的计划标签页：如果你自己切换到另一个计划标签页，锁定会被清除，因此你在新标签页中处于脱离状态。清除复选框以停留在当前视图，然后选择冲刺、工作项、团队成员、列选择或标签页进行查看，而不会更改其他人看到的内容。选择其中一项会自动清除锁定。再次勾选复选框以回到主持人的视图。锁定会在此浏览器标签页中记住，只要你留在该标签页上。你的本地选择会保留在你做出选择时所处的标签页中，并且绝不会更改主持人或其他参与者看到的内容。",[26,1083,1084],{"id":1084},"为工作项排名",[11,1086,1087,1088,1090],{},"在列下拉列表中选择",[447,1089,841],{},"以显示排名列。该列位于状态之前，只占用其数字所需的宽度。没有排名的工作项显示 0。你打开的每个计划会话都会加载其容量数据。切换到另一个计划会话会加载它一次，返回已打开的会话会立即显示其数据。",[11,1092,1093],{},"在每个当前或未来冲刺行上，主持人会在排名单元格中看到自定义按钮。选择它可打开该冲刺的排名对话框。已关闭冲刺行和非主持人看到的视图没有按钮。",[11,1095,1096],{},"对话框说明它会根据所选排名设置冲刺工作项的顺序。选择一个排名：",[697,1098,1099,1105,1111,1117],{},[700,1100,1101,1104],{},[447,1102,1103],{},"面板排名","使用工作项在 Jira 冲刺顺序中的位置。",[700,1106,1107,1110],{},[447,1108,1109],{},"投票","使用工作项上的 Jira 投票数。",[700,1112,1113,1116],{},[447,1114,1115],{},"亲和度排名","使用计划会话中所选视角的亲和度排名。",[700,1118,1119,1122],{},[447,1120,1121],{},"圆点排名","使用计划会话中所选视角的圆点排名。",[11,1124,1125],{},"对冲刺没有值的排名会显示在下拉列表中，但无法选择。当 Jira 没有返回面板排名或投票数，或所选视角还没有亲和度或圆点排名时，就会发生这种情况。对话框中没有任何内容会就此警告你：请选择另一个排名，或在计划会话中补充缺失的数据。当你更改视角时，如果当前排名没有值，排名会回退到第一个有值的选项。",[11,1127,1128,1129,728,1132,1135],{},"选择",[447,1130,1131],{},"升序",[447,1133,1134],{},"降序","作为排序顺序。对于亲和度排名和圆点排名，另外两个下拉列表旁会出现视角下拉列表，以便你选择使用哪个视角的排名。默认视角会首先被选中。",[11,1137,1138],{},"下拉列表下方，预览表格按新顺序列出工作项。它显示工作项类型图标、工作项键以及中性徽章中的排名数字。类型列标题使用工作项图标。排名列使用预览宽度的 10%，排名标题及其单元格右对齐。排名数字绑定到工作项，而不是其行位置。每个来源都有自然顺序：较低的面板排名和较低的亲和度位置更好，而较高的投票数和较高的圆点数更好。序号按该顺序分配一次，因此在升序和降序之间切换会同时反转行和显示的数字。对于圆点排名，升序会首先显示圆点最多的工作项，降序会反转整个列表，包括 0 个圆点的工作项。使用投票时，排名单元格显示工作项的投票数（包括 0），而不是序号位置。使用圆点排名时，没有圆点的工作项显示 0。对所选排名没有值的工作项显示 0，并跟随在已排名工作项之后。应用会为冲刺中的每个工作项保存一个数字。",[11,1140,1128,1141,1144],{},[447,1142,1143],{},"应用","以保存冲刺的新顺序和排名数字。对话框会关闭，排名列会显示这些数字。如果保存失败，对话框会保持打开并显示错误消息，之前的顺序保持不变。",[11,1146,1147],{},"非主持人以只读方式看到保存的排名数字。拖动工作项、添加工作项或移除工作项会保持保存的数字附着在工作项上。移动到另一个冲刺或从计划中移除的工作项会失去其数字，移动或新添加的工作项在再次应用排名之前显示 0。将容量计划应用到 Jira 会保留排名数字。",[26,1149,1150],{"id":1150},"规划团队",[11,1152,1153,1154,875,1157,1159,1160,1163,1164,1166,1167,1169,1170,1172,1173,743,1175,1177,1178,1180,1181,1183],{},"右侧有",[447,1155,1156],{},"团队容量",[447,1158,783],{},"、每个使用与所选面板相同面板进行估算的视角标签页，以及",[447,1161,1162],{},"聊天","。它们的标题保持在一行内，不会用省略号缩短。所选标签页会与计划会话共享，因此锁定到主持人的参与者会跟随主持人的标签页。锁定时选择另一个标签页只会为你保留该标签页并清除锁定。",[447,1165,1156],{},"显示所选冲刺的团队。",[447,1168,783],{},"显示所选活动或未来冲刺的 Jira 字段。每个视角标签页显示合并表格中所选工作项的投票面板。当你在合并表格中选择工作项时，标签栏右端会出现",[447,1171,1162],{},"标签页，并打开该工作项的对话，与计划会话参与者共享。你自己的消息位于对话右侧，其他参与者的消息位于左侧。当你选择已关闭冲刺时，只有",[447,1174,1156],{},[447,1176,1162],{},"保持可见；",[447,1179,783],{},"和视角标签页会隐藏。你的角色徽章和声音铃铛始终位于标签栏右端。徽章打开权限设置，铃铛打开或关闭声音通知。当活动或未来冲刺没有已存储的团队时，Scrumpy 会从工作项处于进行中时分配给该冲刺工作项的人员中填充其团队，然后为该冲刺存储它。过去冲刺会先询问，因为读取其历史可能需要一些时间。取消会选择该冲刺而不填充其团队。如果你接受，对话框会保持打开并显示加载指示器和一条等待填充完成的消息。如果工作项在进行中时没有人被分配，团队会保持为空，再次选择该冲刺会再次提供填充选项。之后，主持人从表格下方的批量操作栏管理列表。团队存储后，新分配者不会自动添加。每个冲刺保留自己的团队列表。 ",[447,1182,1162],{}," 选项卡始终显示计划会话的合并对话，而不仅仅是所选工作项的对话。 对话还包括容量视图中计划的工作项，即使它们不是计划会话中的工作项。",[11,1185,1186,1187,1189],{},"团队表格跟随合并表格中所选的冲刺。复选框用于选择要执行批量操作的团队成员。表格标题中的复选框一次选择所有人。成员复选框仅对主持人可用，仅用于批量操作，并且绝不会与其他参与者共享。非主持人会看到一个没有标题的窄首列，在主持人打开了日历的团队成员上显示黄色 ",[447,1188,929],{}," 徽章。即使你自己打开另一位成员的日历，徽章仍保留在该成员上。",[11,1191,1192],{},"主持人可以更改每位团队成员的利用率和工作时长。团队成员可以在自己所属的冲刺中更改自己的利用率和工作时长。这同样适用于有记录团队的已关闭冲刺，因此你可以更正用于速度的团队规模和团队容量。如果已关闭冲刺还没有团队，你可以添加成员并设置其容量；该冲刺一旦有已保存的团队就会开始计入速度。添加或移除团队成员会立即更新团队表和所有计算值，在保存完成之前就会更新。如果保存失败，之前的团队和值会恢复。你可以打开任意团队成员的日历。你无法更改的日历会以只读方式打开，其工作时长和利用率显示为禁用字段，因此值与可编辑视图对齐。",[11,1194,1195],{},"对于每位团队成员：",[697,1197,1198,1201,1204,1214,1222,1225,1228],{},[700,1199,1200],{},"更改总体利用率百分比以表示兼职可用性。默认是 100%。",[700,1202,1203],{},"选择团队成员旁边的单选按钮以打开其日历，然后选择他们无法工作一整天的日期。再次选择高亮日期可将其移除。日历只显示所选冲刺内的日期，并打开在冲刺开始日期所在的月份，而不是当前月份。空间工作周设置中选择的周末日期会被禁用，不计为工作日。",[700,1205,1206,1209,1210,1213],{},[447,1207,1208],{},"工作时长","列显示团队成员在冲刺总工作时长内可以工作的小时数，例如 80 小时中的 72 小时。两个值都以徽章显示。日历打开时，每个标记日期会显示一个小叉圆按钮、只读日期选择器中的日期以及旁边的时长字段。小时字段接受 0 到空间的“工作周”设置中设置的",[447,1211,1212],{},"每日最长工时","（默认 13 小时）。新标记的日期从 0 小时开始。选择叉圆按钮可从团队成员的日历中移除该日期。",[700,1215,1216,1218,1219,1221],{},[447,1217,945],{},"列显示总体利用率。日历打开时，每个标记日期都会在它旁边显示一个利用率字段。没有工作时长的日期会保持其利用率字段禁用，因为该日期不增加容量。反过来也成立：利用率为 0% 的日期会保持其工作时长字段禁用，因为这些时长会乘以零。当两个值都为 0 时，时长字段保持可编辑，以便更正该日期。在你于列下拉列表中选择",[447,1220,945],{},"之前，该列会隐藏；隐藏它也会隐藏打开日历的每日利用率字段。",[700,1223,1224],{},"标记日期从 0h 开始。为部分日期提高时长，例如 6h。你未标记的日期按 100% 的完整工作日计算，使用空间工作周设置中的工作时长（默认 8h）。",[700,1226,1227],{},"标记的当天也可以长于常规工作时长，例如工作时长为 8 小时时标记 10 小时。额外的小时会让团队成员的可用总工时超过冲刺的常规总量（例如 40 小时中 44 小时），并提高其在团队容量中的占比以及所有使用该容量的目标。",[700,1229,1230],{},"总体利用率会叠加在每个日期之上。总体利用率为 90% 时，一个工作时长为 6h、利用率为 60% 的日期计为正常工作日的 3.24h。",[11,1232,1233],{},"团队表格下方，主持人会在右侧看到一条小提示。它说明要记录休假或与每日常规工作时长的其他偏差，请打开团队成员的日历，然后在冲刺期间选择一个日期。它还说明团队成员的冲刺利用率会叠加在每个例外日期的利用率之上。",[11,1235,1236,1237,1240,1241,1243,1244,1246],{},"表格下方，主持人会看到团队批量操作栏。选择",[447,1238,1239],{},"添加团队成员","以打开对话框，选择一个或多个人，然后选择",[447,1242,802],{},"。所选人员会加入所选已计划冲刺的团队，并以 100% 利用率和完整工作时长开始。要移除团队成员，请在表格中勾选他们并选择",[447,1245,922],{},"。如果任何所选团队成员在该冲刺中有休假记录，确认对话框会说明其休假记录将丢失。确认移除以继续；如果没有休假记录，成员会立即移除。移除团队成员只会删除其在该冲刺中保存的利用率和休假。其他已计划冲刺保留自己的团队列表。只有主持人可以添加或移除团队成员。",[11,1248,1249,1250,1253],{},"要清除该冲刺中的休假，请勾选成员并选择",[447,1251,1252],{},"清除休假","。确认对话框会说明其休假(工作时长)记录将被删除，利用率将重置为 100%。确认以继续。每位所选成员将恢复到常规工作时长和完整利用率。当所选成员都没有可清除的内容时，清除控件保持禁用。",[11,1255,1256],{},"所选团队成员会随面板视图记住。目标会随着你更改这些值而更新。完成少于分配时剩余值为负，完成多于分配时为正。当绝对剩余百分比等于或低于偏差时，剩余徽章使用常规样式。超过偏差时，正值为绿色，负值为红色。",[26,1258,1259],{"id":1259},"所选冲刺",[11,1261,1262,1264],{},[447,1263,783],{},"标签页编辑合并表格中所选的冲刺。它仅适用于活动和未来冲刺。选择已关闭冲刺时，该标签页会隐藏。",[697,1266,1267,1285,1290],{},[700,1268,1269,875,1272,875,1275,743,1278,1281,1282,1284],{},[447,1270,1271],{},"冲刺名称",[447,1273,1274],{},"冲刺目标",[447,1276,1277],{},"开始日期",[447,1279,1280],{},"结束日期","在编辑时保留在计划中。表格会立即显示新名称，并根据新日期重新计算冲刺目标和团队天数范围。选择",[447,1283,1143],{},"之前不会更改 Jira。",[700,1286,960,1287,1289],{},[447,1288,1274],{},"字段下方，一个方形点赞按钮和一个方形点踩按钮让人们同意或不同意该文本。每个按钮旁显示投票数。每位参与者都可以投票，再次选择按钮可移除投票，计数会对所有人更新。目标文本更改时投票会重置。",[700,1291,1292,1293,1296],{},"冲刺状态更改发生在 Jira 中，而不是此标签页中。要开始或完成冲刺，请使用 Jira 待办事项或活跃冲刺页面，然后在容量工具栏中选择",[447,1294,1295],{},"刷新","以重新加载计划。已开始的冲刺显示为当前冲刺，已完成的冲刺会离开计划。",[11,1298,1299],{},"主持人可以编辑这些字段。非主持人以只读方式看到相同值。",[26,1301,1302],{"id":1302},"从容量规划为工作项投票",[11,1304,1305],{},"当视角的估算目标是面板，且其估算面板与你在合并表格上方选择的面板相同时，该视角会作为标签页出现在团队部分。将估算写入 Jira 字段或使用另一个面板估算的视角不会出现。",[11,1307,1308,1309,1312,1313,875,1315,743,1318,1321,1322,1324],{},"在合并表格中选择一个工作项，然后打开其视角标签页进行投票。该标签页显示与需求梳理\u002F细化标签页相同的投票面板：视角标题、投票卡片、参与者列表、会话控件以及带",[447,1310,1311],{},"接受","的最终结果。会话运行期间，",[447,1314,1109],{},[447,1316,1317],{},"结果",[447,1319,1320],{},"详情","子标签页会保留在视角标签页内。",[447,1323,1320],{},"子标签页显示所选工作项的摘要和描述，主持人可以在那里编辑两者。编辑会在你点击别处、切换到另一个子标签页或关闭面板时保存，即使简短的描述暂停尚未结束。如果未选择工作项，视角标签页会隐藏。当你选择已关闭冲刺时，视角标签页会隐藏。",[11,1326,1327,1328,1330],{},"你在投票面板的",[447,1329,1320],{},"子标签页中编辑的摘要也会更新合并表格中的工作项工具提示。",[26,1332,1333],{"id":1333},"容量工具栏",[11,1335,1336,1337,1339,1340,1343,1344,1346,1347,875,1350,743,1352,1355,1356,1358],{},"表格下方，主持人会看到与需求梳理\u002F细化标签页相同样式的工具栏。面板选择器位于合并表格左上角上方，而",[447,1338,691],{},"下拉列表和列控件位于右上角上方。",[447,1341,1342],{},"编辑","是主要的蓝色操作，",[447,1345,1143],{},"使用警告色。",[447,1348,1349],{},"归档",[447,1351,1143],{},[447,1353,1354],{},"完成","在工具栏中位于",[447,1357,1295],{},"之后并留有间隔；它们并不靠右边缘：",[697,1360,1361,1366,1374,1379,1384,1389,1394,1399],{},[700,1362,1363,1365],{},[447,1364,1342],{},"更改计划会话标题、描述和日期。 并显示一条消息说明无法保存计划会话。",[700,1367,1368,1370,1371,1373],{},[447,1369,760],{},"会将已保存的 Jira 筛选器、冲刺或需求梳理\u002F细化计划会话中的工作项添加到所选冲刺计划。选择器以一个",[447,1372,966],{},"分组开头，列出有工作项的计划会话；选择一个即可预览该会话的工作项。它只提供当前空间中尚未在所选冲刺计划中的工作项。",[700,1375,1376,1378],{},[447,1377,738],{},"打开上文所述的冲刺选择器。",[700,1380,1381,1383],{},[447,1382,922],{},"从所选冲刺计划中移除勾选的工作项，或在确认后从计划会话中移除勾选的冲刺。它不会立即更改 Jira。",[700,1385,1386,1388],{},[447,1387,1295],{},"再次从 Jira 读取冲刺和工作项，包括其优先级、摘要和描述。它不会更改计划或 Jira。",[700,1390,1391,1393],{},[447,1392,1349],{},"为合并表格中当前选中的冲刺创建 Confluence 页面。仅在配置了 Confluence 空间时可用，选中过去冲刺时禁用。页面记录计划会话窗口和持续时间、所选冲刺和目标、目标投票、容量决策、速度摘要、团队工作时长，以及按顺序排列的工作项及其估算。",[700,1395,1396,1398],{},[447,1397,1143],{},"会用计划以及你更改的冲刺名称、目标和日期更新 Jira。",[700,1400,1401,1403,1404,1406],{},[447,1402,1354],{},"紧接在",[447,1405,1143],{},"之后，间距较小。它会关闭计划会话。它会要求确认，然后永久移除该计划会话及其容量数据、投票、笔记、行动项、站会和聊天。",[11,1408,1409,1410,1412],{},"计划会话进度条显示在工具栏下方。非主持人在工具栏所在位置看到",[447,1411,1070],{},"复选框。",[26,1414,1274],{"id":1274},[11,1416,1417,1418,1420,1421,1423],{},"每个冲刺目标都以小字显示在表格中冲刺名称的下方，并保持在一行内；放不下的目标会用省略号缩短。没有目标的冲刺在表格中保留一个空的目标行，因此冲刺行和时间线保持对齐。主持人在",[447,1419,783],{},"选项卡中编辑当前或未来冲刺的目标。冲刺名称下方的目标会在草稿保存之前随着你的输入更新，目标投票会在文本更改时立即重置为 0。投票按钮在目标草稿保存之前保持只读，因为投票始终描述已保存的目标。目标更改无需重新加载即可向所有人显示，并在选择",[447,1422,1143],{},"时写入 Jira。已关闭冲刺的目标为只读。如果 Jira 中的目标包含换行，表格会将其显示为空格。",[11,1425,1426,1427,1429],{},"你在",[447,1428,783],{},"选项卡中更改的冲刺名称和日期，会在草稿保存之前随着你的更改显示在合并表格、团队日历和目标中。日期字段在更改保存期间保持可编辑，因此你可以不必等待就设置开始日期和结束日期，较早的保存绝不会回退你后来选择的较新日期。保存失败时会恢复已保存的名称、目标和日期。",[26,1431,1432],{"id":1432},"将工作移入所选冲刺",[11,1434,1435,1436,1438,1439,1441],{},"工作项按冲刺规划。使用",[447,1437,760],{},"将筛选器、冲刺或需求梳理\u002F细化会话中的工作项添加到所选冲刺，将工作项拖到另一个冲刺行上以移动到该冲刺，或在冲刺内拖动以重新排序其工作项。顺序和冲刺成员关系会保存为草稿。在你选择",[447,1440,1143],{},"之前，它们不会更改 Jira。",[26,1443,1444],{"id":1444},"应用计划",[11,1446,1447,1448,1450,1451,1453],{},"在工具栏中选择",[447,1449,1295],{},"之后的",[447,1452,1143],{},"，并在对话框中确认更改。然后 Scrumpy 会：",[697,1455,1456,1459,1462,1465,1468,1471],{},[700,1457,1458],{},"保存你更改的冲刺名称、目标以及开始和结束日期。",[700,1460,1461],{},"将计划的工作项移动到选定的冲刺中。",[700,1463,1464],{},"使用面板的排名字段更新每个冲刺内的顺序。",[700,1466,1467],{},"将你从冲刺计划中移除的工作项移至待办事项列表，但仅限于它们当前位于该冲刺中。位于其他冲刺或已在待办事项列表中的工作项保持原位。",[700,1469,1470],{},"已关闭的冲刺及其估算保持不变。",[700,1472,1473],{},"为每个有团队的所选冲刺保存团队容量快照。快照包含团队成员、工作时间和利用率，保留 12 个月，并且不属于此计划会话。",[11,1475,1476],{},"更新完成后，页面会重新加载当前的 Jira 数据。如果 Jira 拒绝部分更改，页面会告知哪些冲刺无法更新，并保留草稿以便重试。尚未应用的冲刺名称、目标或日期属于计划的一部分，因此也会显示在合并表格和归档页面中。",[26,1478,1479],{"id":1479},"归档容量计划",[11,1481,1482],{},"你可以将冲刺的容量计划保存为 Confluence 页面，以便团队保留计划内容及原因的记录。只有主持人可以归档，并且仅在为空间配置了 Confluence 空间后才可用。",[1484,1485,1486,1492,1497,1500],"ol",{},[700,1487,1488,1489,1491],{},"在合并表格中选择一个活动或未来冲刺。已关闭冲刺的",[447,1490,1349],{},"会被禁用，因为已关闭冲刺只是历史记录。",[700,1493,1494,1495,255],{},"在容量工具栏中选择",[447,1496,1349],{},[700,1498,1499],{},"查看预览。它显示冲刺及其日期、冲刺目标、赞成票和反对票、容量决策以及速度摘要。团队表格和工作项表格会写入 Confluence 页面，但不会在对话框中显示。",[700,1501,1128,1502,1504,1505,1508],{},[447,1503,1349],{},"以创建页面，或选择",[447,1506,1507],{},"关闭","以保持容量计划不变。",[11,1510,1511,1512,1514],{},"预览加载期间，",[447,1513,1349],{},"保持禁用。如果预览无法加载，对话框会解释原因，你可以关闭它并重试。页面准备好后，对话框会显示指向它的链接。如果 Confluence 拒绝该页面，对话框会显示原因，你的容量计划不会更改。",[11,1516,1517,1518,1521,1522,1526,1527,1530],{},"页面写入配置的 Confluence 空间中 ",[447,1519,1520],{},"Plannings"," 父页面下，位于名为 ",[1523,1524,1525],"code",{},"\u003Cspace name> - Capacity planning"," 的子页面中。计划会话归档保留在单独的 ",[447,1528,1529],{},"Estimations"," 父页面下，因此两种页面永远不会互相覆盖。页面标题以计划会话标题开头，然后是冲刺名称以及带时区的计划开始时间。",[11,1532,1533],{},"页面包含：",[697,1535,1536,1539,1542,1545,1548,1551,1554,1557],{},[700,1537,1538],{},"计划会话标题、描述、开始和结束时间以及时区，与计划归档页面相同的标题",[700,1540,1541],{},"计划会话持续时间，显示为该标题下方的普通一行",[700,1543,1544],{},"所选冲刺名称、状态、日期和目标",[700,1546,1547],{},"目标的赞成票和反对票",[700,1549,1550],{},"一行关于目标容量范围的决策",[700,1552,1553],{},"速度摘要：每位成员的速度、团队速度、团队规模、有效团队规模、团队容量、目标容量、健康范围、计划估算、剩余估算以及与目标的偏差",[700,1555,1556],{},"所选冲刺中的每位团队成员，及其利用率和在冲刺工作时长内的工作小时数",[700,1558,1559],{},"按保存顺序排列的工作项及其状态和估算",[11,1561,1562],{},"标题与计划归档页面相同：计划标题和描述，然后分别在单独行显示开始和结束，每个日期显示为 Confluence 日期标签，每个时间在蓝色徽章中高亮，并显示日期有效的时区。冲刺目标及其赞成票和反对票居中显示在冲刺名称正下方。团队表格和工作项表格使用更宽的布局，工作项列为更长的摘要留出空间。",[11,1564,1565],{},"页面显示容量计划当前的样子，包括你尚未应用到 Jira 的草稿更改。在故事点面板上，值使用故事点；在时间面板上，值使用工作日时长。重新归档同一冲刺会更新现有页面，而不是创建重复页面。",[26,1567,1568],{"id":1568},"备注",[697,1570,1571,1574,1580,1583,1589,1592,1595],{},[700,1572,1573],{},"速度使用已关闭冲刺中工作项的当前完成状态。冲刺关闭后重新打开的工作项计为未完成。活动或未来工作项上的手动完成百分比不会更改速度。",[700,1575,1576,1577,1579],{},"手动完成百分比会随计划会话保存，绝不会写入 Jira。",[447,1578,1143],{},"会保留它。在时间面板上，百分比不是手动的：每次加载或刷新计划时，都会根据当前已用时间和原始时间估算重新计算。",[700,1581,1582],{},"工作日排除星期六和星期日，除非你在空间的工作周设置中更改周末日期。请为每位团队成员将公共假日标记为 0h 日期。",[700,1584,1585,1586,1588],{},"速度使用所选已关闭冲刺中保存的团队规模和团队容量。如果你未选择已关闭冲刺，或它们都没有已保存的团队，速度为零。没有已保存团队的过去冲刺显示 0%，并且不计入。选择它以打开其",[447,1587,1156],{},"标签页，填充其团队，然后更正其规模和容量。从未在某个冲刺中有工作项处于进行中的团队成员不会出现在该冲刺的团队列表中。",[700,1590,1591],{},"从容量计划中移除冲刺不会删除其保存的草稿工作项顺序或团队设置。如果你再次将该冲刺添加到计划会话，它们会恢复。",[700,1593,1594],{},"每个计划会话都有自己的容量数据。切换计划标签页不会更改另一个计划会话。",[700,1596,1597],{},"非主持人只能编辑自己的利用率和休假，并且只能在自己所属的冲刺中编辑。更改会为查看该冲刺的所有人保存。",[11,1599,1600,1602],{},[447,1601,1162],{},"标签页始终可用。未选择工作项或选择已关闭冲刺时，它会显示计划会话聊天。",{"title":175,"searchDepth":176,"depth":176,"links":1604},[1605,1606,1607,1608,1609,1610,1611,1612,1613,1614,1615,1616,1617],{"id":738,"depth":176,"text":738},{"id":806,"depth":176,"text":806},{"id":1035,"depth":176,"text":1035},{"id":1084,"depth":176,"text":1084},{"id":1150,"depth":176,"text":1150},{"id":1259,"depth":176,"text":1259},{"id":1302,"depth":176,"text":1302},{"id":1333,"depth":176,"text":1333},{"id":1274,"depth":176,"text":1274},{"id":1432,"depth":176,"text":1432},{"id":1444,"depth":176,"text":1444},{"id":1479,"depth":176,"text":1479},{"id":1568,"depth":176,"text":1568},"2026-11-10","容量规划帮助 Scrum 团队决定接下来的冲刺能容纳多少工作。 Scrumpy 会查看团队在最近冲刺中完成的估算。 每位团队成员的平均值就是你的速度。 以故事点估算的面板使用故事点，以时间估算的面板使用原始时间估算，并将其显示为 2 天、4 小时等时长。 容量使用所选面板上配置的估算字段。","\u002Fog\u002Fguide-capacity-planning.jpg",[],{},13,"\u002Fgetting-started\u002Fcapacity-planning","guide",{"title":680,"description":1619},{"loc":1624,"lastmod":191},"capacity-planning","guide\u002Fzh-CN\u002Fcapacity-planning","guide\u002Fcapacity-planning","oSRFqXJTYXT2rFRgh11IWDz28pvfVoVUAMazjfczbPc",1795345553932]