[{"data":1,"prerenderedAt":976},["ShallowReactive",2],{"blog-index-sk":3},[4,204,345,510,606,809],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fsk\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Závislosti v šprinte a zreťazené pull requesty | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Kovová reťaz, karty na planning poker a šálka kávy na stole",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Šprinty často obsahujú závislé pracovné položky, či už v rámci jedného tímu alebo medzi viacerými Scrum tímami. V dokonalom svete by závislosti neexistovali; v praxi vyhrávajú obchodné potreby a závislosti sa pridávajú, aby sa skrátil cyklus vydania. Tento článok opisuje jeden spôsob, ako riadiť závislé úlohy v softvérových tímoch.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Závislosti medzi úlohami",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"postaru","Postaru",[12,46,47,48,53],{},"Priamočiare riešenie je začať úlohu hneď, ako sa jej závislosť zlúči do hlavnej vetvy. Pri tomto prístupe niektorí členovia tímu čakajú, kým bude úloha pripravená. Napokon na zostávajúce závislé úlohy nezostane takmer žiadny čas. Posledné úlohy sa presunú do ďalšieho šprintu a ",[49,50,52],"a",{"href":51},"\u002Fsk\u002Fblog\u002Fcomparison-metrics-for-agile-teams","tím je nespokojný",".",[12,55,56],{},"Prečo sa to deje, aj keď je kapacita správne odhadnutá? Deje sa to najmä pre prestoje pri čakaní, kým kolegovia dokončia prácu. Aj malé oneskorenia sa sčítavajú, najmä v krátkych šprintoch.",[41,58,60],{"id":59},"práca-na-závislých-úlohách-súčasne","Práca na závislých úlohách súčasne",[12,62,63],{},"Existuje spôsob, ako to robiť s malou réžiou. Keď členovia tímu pracujú na úlohách súčasne, prináša to niekoľko výhod.",[65,66,68],"h3",{"id":67},"lepšia-spolupráca","Lepšia spolupráca",[12,70,71],{},"Keď členovia tímu pracujú súčasne na závislých úlohách, pripomína to párové programovanie. Jeden človek musí rozumieť nadradenej úlohe, druhý podradenej. Tím získa širší prehľad o riešených problémoch.",[65,73,75],{"id":74},"bez-prestojov","Bez prestojov",[12,77,78],{},"Keď úlohy bežia súbežne, nikto nečaká na opravu. Každý môže pracovať naraz a otázky sa riešia operatívnejšie v diskusii.",[65,80,82],{"id":81},"pull-requesty-pripravené-na-code-review-skôr","Pull requesty pripravené na code review skôr",[12,84,85],{},"Keď je vaša vetva postavená na vetve kolegu, schválenie pôvodného pull requestu je jednoduchšie. Už viete, ako bola nadradená položka implementovaná, a pôvodná vetva bola počas implementácie testovaná a kontrolovaná. Už to nie je neznámy terén.",[41,87,89],{"id":88},"práca-so-zreťazenými-vrstvenými-pull-requestmi","Práca so zreťazenými (vrstvenými) pull requestmi",[12,91,92],{},"Taká miera súbežnosti si vyžaduje správne nástroje. S verziovacím systémom založeným na Git je to priamočiare. Postup nižšie opisuje, ako na to.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Strom závislostí",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Strom závislostí (práca na šiestich závislých úlohách súčasne)",[65,107,109],{"id":108},"jasne-načrtnite-závislosti","Jasne načrtnite závislosti",[12,111,112],{},"Reťazec závislostí definujte počas plánovania šprintu. Reťaz pull requestov sa potom presne drží tejto definície. Zmeniť reťaz uprostred vývoja je nákladné, pretože si vyžaduje rebase.",[65,114,116],{"id":115},"začnite-koreňovými-úlohami","Začnite koreňovými úlohami",[12,118,119],{},"Každý reťazec závislostí má koreňové úlohy, ktoré nezávisia od ničoho iného. Práca na nich môže začať hneď prvý deň.",[65,121,123],{"id":122},"najprv-urobte-jadro-implementácie","Najprv urobte jadro implementácie",[12,125,126],{},"To môže byť v rozpore s vývojom riadeným testami, kde testy prichádzajú prvé. Aby reťaz pull requestov zostala zvládnuteľná, implementujte najprv jadro. Závislí členovia tímu sa tak dostanú k práci skôr.",[65,128,130],{"id":129},"organizujte-a-kontrolujte-kód-vo-fronte-fifo","Organizujte a kontrolujte kód vo fronte FIFO",[12,132,133],{},"Prvá vytvorená vetva by mala byť skontrolovaná a zlúčená prvá. Každé zlúčenie spustí CI; ak rozbije hlavné zostavenie, problém sa opraví, kým je ešte malý.",[41,135,137],{"id":136},"réžia-navyše","Réžia navyše",[12,139,140],{},"Udržiavanie reťazca závislých vetiev má výhody, ale aj určité nevýhody.",[65,142,144],{"id":143},"rebase-alebo-zlúčenie","Rebase alebo zlúčenie",[12,146,147],{},"Reťaz treba udržiavať synchronizovaný, čo si vyžaduje úsilie. Moderné nástroje ponúkajú synchronizáciu so základnou vetvou na jeden klik, keď neexistujú konflikty. Používajte ju podľa potreby, keď je bezpečné prevziať zmeny z vyšších vetiev. Keď je zostavenie zelené a funkcia funguje, synchronizujte.",[65,149,151],{"id":150},"tímová-práca","Tímová práca",[12,153,154],{},"Reťaz závislostí potrebuje tím, ktorý spolupracuje a ktorého členovia sú ochotní sa rozprávať. Nemôže fungovať, ak ľudia pracujú izolovane.",[12,156,157],{},"Závislé pracovné položky je najlepšie držať mimo aktuálneho šprintu. Keď obchodné potreby vyžadujú, aby bežali paralelne, reťaz odvodených vetiev je praktický spôsob, ako zvládnuť réžiu závislostí.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Závislé pracovné položky zaseknú šprint, kým ľudia čakajú. Zistite, ako vrstvené pull requesty udržia prácu v pohybe a znížia prestoje.","md","Ako riadiť závislosti v šprinte pomocou zreťazených pull requestov","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"závislosti v šprinte","vrstvené pull requesty","zreťazené pull requesty","code review","agilné dodávanie","sk",{},true,"\u002Fblog\u002Fsk\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fsk\u002Fmanage-sprint-dependencies-with-chained-pull-requests","KLxU5PnxlpLmAk6V-yprcwxdn_MAB1D6APe7QDBJKiQ",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":324,"description":325,"extension":182,"heading":326,"image":327,"imageAlt":213,"keywords":328,"locale":191,"meta":334,"navigation":193,"path":335,"reviewed":193,"seo":336,"sitemap":337,"slug":342,"stem":343,"translationKey":342,"__hash__":344},"blog\u002Fblog\u002Fsk\u002Fcomparison-metrics-for-agile-teams.md","Porovnávacie metriky pre agilné tímy | AELBOX",{"type":9,"value":208,"toc":315},[209,216,219,223,226,233,237,241,244,248,251,259,263,271,275,278,281,288,292,295,302,305,309,312],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Pravítko, karty na planning poker a šálka kávy na stole",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Porovnávať agilné tímy je ťažké a stojí za to sa opýtať, prečo ich vlastne porovnávame. Ako naozaj pomôže porovnávanie tímov z rôznych oblastí?",[41,220,222],{"id":221},"vytvorte-súťaž","Vytvorte súťaž",[12,224,225],{},"Tímy by sa nemali zoraďovať proti sebe podľa ľubovoľných metrík. To ľudí iba demotivuje. Metriky by namiesto toho mali dať každému tímu rovnakú šancu súťažiť. Výkon sa potom zlepšuje preto, že tímy chcú, nie preto, že ich niekto tlačí.",[12,227,228],{},[15,229],{"alt":222,"height":230,"loading":32,"src":231,"width":232,"decoding":34},487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,234,235],{},[38,236,222],{},[41,238,240],{"id":239},"metriky-na-vytvorenie-rovnakých-šancí","Metriky na vytvorenie rovnakých šancí",[12,242,243],{},"Tu sú štyri základné metriky na porovnávanie tímov. Merajú schopnosť každého tímu súťažiť za rovnakých podmienok, nič viac. Porovnateľné metriky vytvárajú rovnaké šance.",[65,245,247],{"id":246},"úspešné-šprinty","Úspešné šprinty",[12,249,250],{},"Keby bol šprint len časovým rámcom, nemal by zmysel. Šprint je míľnik a potrebuje cieľ. Cieľ šprintu (najdôležitejšia skupina príbehov) je väčší míľnik, dokončenie všetkých príbehov tým menším. Na konci každého šprintu urobte demo naprieč tímami, kde tímy predvedú, čo dodali. Taká zdravá súťaž povzbudzuje tímy dokončiť ciele šprintu. Ľudia potrebujú viditeľný cieľ, aby boli motivovaní.",[12,252,253],{},[15,254],{"alt":255,"height":256,"loading":32,"src":257,"width":258,"decoding":34},"Šprint k cieľu",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,260,261],{},[38,262,255],{},[12,264,265,266,270],{},"Nemôže sa z toho stať hra s prehnanými a nedostatočnými záväzkami? Ak sa tím zaväže na málo, demo to ukáže: je toho menej na predvedenie. Ak sa zaväže na veľa, demo sa stane ",[267,268,269],"strong",{},"ďalším neúspešným šprintom",". Dodanie toho, na čo sa tím zaviazal, buduje motiváciu robiť viac. Tímy cítia z práce uspokojenie.",[65,272,274],{"id":273},"stabilita-rýchlosti-a-čestné-odhadovanie","Stabilita rýchlosti a čestné odhadovanie",[12,276,277],{},"Toto je znalostná práca, nie práca pri páse. Ak nikto v tíme nerozumie problému natoľko, aby odhadol jeho riešenie, problém nebol vopred preskúmaný.",[12,279,280],{},"Časovo ohraničený spike v predchádzajúcom šprinte a následné zhodnotenie zistení tímom umožnia ľahko rozdeliť implementáciu na menšie príbehy a správne ich odhadnúť. Pri komplexnej práci napíšte podrobnejší dokument technického návrhu, ktorý vymenúva implementačné príbehy.",[12,282,283,284,53],{},"Aj spike a návrhová práca sú príbehy, ktoré sa dajú odhadnúť. Kľúčom je definovať štruktúru a poradie práce pri komplexnom riešení. Namiesto záväzku na príbeh, ktorému tím nerozumie, vytvorte výskumnú úlohu, ktorá medzeru vyplní. Potom je odhad ",[49,285,287],{"href":286},"\u002Fsk\u002Fblog\u002Fsheepherding-story-points","podložený dôkazmi",[65,289,291],{"id":290},"predvídateľnosť-kapacity-vyhýbanie-sa-nečakanej-práci","Predvídateľnosť kapacity (vyhýbanie sa nečakanej práci)",[12,293,294],{},"Najprv prichádza prieskum, potom implementácia. Keď prieskum odhalí problémy, vytvoria sa a ohodnotia nové pracovné položky. Potom máte oveľa jasnejšiu predstavu o ďalšom šprinte. Známu prácu viete odhadnúť a naplánovať; neznáma práca dostane časovo ohraničenú výskumnú položku skôr, než ju odhadnete. Disciplína spočíva v rozdeľovaní veľkej práce na malé, odhadnuteľné časti.",[12,296,297,298,53],{},"Komplexná práca môže začať skôr, aj keď len preto, aby sa zistilo, že potrebuje vlastnú sadu príbehov. Aj to znižuje ",[49,299,301],{"href":300},"\u002Fsk\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","riziko neznámeho",[12,303,304],{},"Podpora a riešenie incidentov v produkcii zvyčajne bežia v časovo ohraničenom Kanban toku mimo šprintu. Tam sa porovnávacími metrikami stávajú čas do prvej odpovede a porušenia SLA.",[65,306,308],{"id":307},"dostupnosť-tímu-čas-strávený-na-úlohách-vydelený-celkovým-časom-v-šprinte","Dostupnosť tímu (čas strávený na úlohách vydelený celkovým časom v šprinte)",[12,310,311],{},"Dostupnosť je podiel času, ktorý členovia tímu venujú odhadnutej práci. Ak jeden tím odchádza na školenia, zdieľanie znalostí alebo inú internú prácu častejšie než ostatné, nerovnováhu napravte. Jediný spôsob, ako udržať rýchlosť stabilnú, je udržať stabilnú dostupnosť. Keď je dostupnosť medzi tímami rovnaká, ostatné porovnávacie metriky budú fungovať.",[12,313,314],{},"Porovnávanie tímov nemá trestať slabý výkon, ale zvyšovať motiváciu a chuť súťažiť a dodať viac. Preto by tieto metriky nemali byť viditeľné jednotlivým členom tímu: sú nástrojom na koučovanie, nie na verejné rebríčky. Keď tieto metriky sledujete a nepriamo vediete Scrum Masterov, dávate tímom rovnakú štartovaciu čiaru.",{"title":159,"searchDepth":160,"depth":160,"links":316},[317,318],{"id":221,"depth":160,"text":222},{"id":239,"depth":160,"text":240,"children":319},[320,321,322,323],{"id":246,"depth":166,"text":247},{"id":273,"depth":166,"text":274},{"id":290,"depth":166,"text":291},{"id":307,"depth":166,"text":308},"2018-05-04","Metriky majú vytvárať rovnaké podmienky, nie rebríček. Štyri porovnávacie metriky, ktoré motivujú agilné tímy bez toho, aby ich trestali.","Porovnávacie metriky pre agilné tímy","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[329,330,331,332,333],"agilné metriky","rýchlosť tímu","agilné tímy","scrum","kapacita",{},"\u002Fblog\u002Fsk\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":325},{"loc":335,"images":338,"lastmod":179},[339,340,341],{"loc":215},{"loc":231},{"loc":257},"comparison-metrics-for-agile-teams","blog\u002Fsk\u002Fcomparison-metrics-for-agile-teams","8HvwxAa8En3kIluwiXib00Nx9p4zn1cv0IHH1rEsjJo",{"id":346,"title":347,"author":7,"body":348,"dateModified":179,"datePublished":487,"description":488,"extension":182,"heading":489,"image":490,"imageAlt":354,"keywords":491,"locale":191,"meta":496,"navigation":193,"path":497,"reviewed":193,"seo":498,"sitemap":499,"slug":507,"stem":508,"translationKey":507,"__hash__":509},"blog\u002Fblog\u002Fsk\u002Fsheepherding-story-points.md","Stádový efekt v planning pokeri: ukotvenie odhadov | AELBOX",{"type":9,"value":349,"toc":478},[350,356,359,363,370,378,382,386,389,392,399,403,406,410,413,418,422,426,429,436,440,444,447,452,456,460,472,475],[12,351,352],{},[15,353],{"alt":354,"height":18,"loading":19,"src":355,"width":21,"fetchPriority":22},"Stádo oviec a karty na planning poker na konferenčnom stole","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,357,358],{},"Odhadovanie story pointov sa často zanedbáva alebo prebieha v chatových miestnostiach a otvorených poradách, kde každý vidí alebo počuje každý hlas. Keď viete, ako hlasovali ostatní, výsledok sa skreslí a odhady sú nepresné. Opakované nepresné odhady vedú k zlým plánom a oneskoreným či zrušeným dodaniam. Tu je, čo sa pri otvorenom hlasovaní deje.",[41,360,362],{"id":361},"postavy-pri-hlasovaní","Postavy pri hlasovaní",[12,364,365,366,369],{},"Pri otvorenom hlasovaní o odhade sa objaví niekoľko typov ľudí. Odhad závisí od toho, kto hlasuje prvý, a zvyčajne má k čestnosti ďaleko. Prečo pri otvorenom hlasovaní tak záleží na poradí? Pre ",[267,367,368],{},"stádový efekt",": skreslenie ukotvením, ktoré núti ostatných členov tímu kopírovať prvý odhad.",[12,371,372],{},[15,373],{"alt":374,"height":375,"loading":32,"src":376,"width":377,"decoding":34},"Stádový efekt",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,379,380],{},[38,381,374],{},[65,383,385],{"id":384},"príliš-sebavedomý-hlasujúci","Príliš sebavedomý hlasujúci",[12,387,388],{},"V každom tíme je aspoň jeden člen, ktorý si myslí, že systému rozumie najlepšie. Zvyčajne hlasuje prvý, pretože odpovede sa mu zdajú očividné. Často prehliada detaily, ktoré môžu odhad zásadne pokaziť. Tie detaily sa dajú odhaliť vopred, ale len ak niekto vyvolá diskusiu. Pri otvorenom hlasovaní to nie je možné.",[12,390,391],{},"Tento človek zvyčajne hlasuje nižšie, než je čestný odhad. Možno by príbeh tak rýchlo dokončil len on a len so šťastím.",[12,393,394],{},[15,395],{"alt":385,"height":396,"loading":32,"src":397,"width":398,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,400,401],{},[38,402,385],{},[12,404,405],{},"Všetci ostatní ho nasledujú, takže úloha vyzerá jednoducho a zvládnuteľne pre kohokoľvek v danom čase. V praxi ju zvyčajne dokončí niekto iný.",[65,407,409],{"id":408},"tichý-hlasujúci","Tichý hlasujúci",[12,411,412],{},"Tichých hlasujúcich býva viac a boja sa hlasovať prví. Čakajú, kým zahlasuje niekto iný, aby to mohli skopírovať. Do diskusie sa zapájajú zriedka a odpovedajú, len keď sa ich niekto spýta. Hlasujú druhí, tesne pred nezaujatými hlasujúcimi.",[12,414,415],{},[15,416],{"alt":409,"height":396,"loading":32,"src":417,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,419,420],{},[38,421,409],{},[65,423,425],{"id":424},"nezaujatý-hlasujúci","Nezaujatý hlasujúci",[12,427,428],{},"Počas implementácie sa ťažko zachytia, ale pri hlasovaní je ich správanie očividné. Vždy hlasujú poslední a kopírujú odhad niekoho iného. Ak sa odhady líšia, vyberú ten najčastejší. Nechcú vysvetľovať, prečo zvolili nižšie alebo vyššie číslo, preto sa vyhýbajú spolupráci pri vylaďovaní a uhýbajú pred otázkami.",[12,430,431],{},[15,432],{"alt":425,"height":433,"loading":32,"src":434,"width":435,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,437,438],{},[38,439,425],{},[65,441,443],{"id":442},"unavený-hlasujúci","Unavený hlasujúci",[12,445,446],{},"Niektorí členovia tímu sa neudržia dlho sústredení a prepasú kľúčové časti diskusie. Stratia kontext a buď hádajú, alebo hľadajú najčastejší hlas, ktorý by mohli kopírovať.",[12,448,449],{},[15,450],{"alt":443,"height":396,"loading":32,"src":451,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,453,454],{},[38,455,443],{},[41,457,459],{"id":458},"ako-udržať-pozornosť-pri-odhadovaní","Ako udržať pozornosť pri odhadovaní",[12,461,462,463,467,468,471],{},"Odhadovanie je dôležité, pretože iba čestné story pointy dokážu ",[49,464,466],{"href":465},"\u002Fsk\u002Fblog\u002Fcorrectly-estimating-release-deadline","udržať projekt v harmónii s termínom vydania",". Kľúčom k čestnému odhadovaniu je čeliť ",[267,469,470],{},"stádovému efektu",", či už používate papierové karty alebo softvér.",[12,473,474],{},"Členovia tímu by nikdy nemali vidieť odhady ostatných skôr, než ich moderátor odhalí. Tak sa tichý hlasujúci rozmyslí, nezaujatý sa začne zaujímať a unavený sa prebudí. Najlepšia otázka, najmä keď niekto nesúhlasí so skupinou, je: „Prečo ste zvolili X story pointov?“ Rozbehne sa tak rozhovor o skutočných problémoch implementácie. Uzavreté otázky typu „Súhlasili by ste s X story pointmi?“ vyvolajú iba bezvýznamné „áno“.",[12,476,477],{},"Dobrý nástroj na odhadovanie robí vylaďovanie pútavejším a udržiava všetkých v strehu a pripravených diskutovať, takže aj zložité príbehy dostanú lepšie odhady.",{"title":159,"searchDepth":160,"depth":160,"links":479},[480,486],{"id":361,"depth":160,"text":362,"children":481},[482,483,484,485],{"id":384,"depth":166,"text":385},{"id":408,"depth":166,"text":409},{"id":424,"depth":166,"text":425},{"id":442,"depth":166,"text":443},{"id":458,"depth":160,"text":459},"2018-04-30","Otvorené hlasovanie nechá prvý odhad ukotviť celú miestnosť. Pozrite sa, ako stádový efekt skresľuje story pointy a ako viesť planning poker čestne.","Stádový efekt pri story pointoch","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[492,493,494,368,495],"story pointy","planning poker","kotevné skreslenie","agilné odhadovanie",{},"\u002Fblog\u002Fsk\u002Fsheepherding-story-points",{"title":347,"description":488},{"loc":497,"images":500,"lastmod":179},[501,502,503,504,505,506],{"loc":355},{"loc":376},{"loc":397},{"loc":417},{"loc":434},{"loc":451},"sheepherding-story-points","blog\u002Fsk\u002Fsheepherding-story-points","EGIS9dug6F_M0PTUSmp3GiR_m0plyfinISg8MECwvCo",{"id":511,"title":512,"author":7,"body":513,"dateModified":179,"datePublished":586,"description":587,"extension":182,"heading":588,"image":589,"imageAlt":519,"keywords":590,"locale":191,"meta":595,"navigation":193,"path":596,"reviewed":193,"seo":597,"sitemap":598,"slug":603,"stem":604,"translationKey":603,"__hash__":605},"blog\u002Fblog\u002Fsk\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","Pravidlo 10 % v Scrumbane pre každý šprint | AELBOX",{"type":9,"value":514,"toc":581},[515,522,530,534,537,545,549,553,556,560,563,566,574,578],[12,516,517],{},[15,518],{"alt":519,"height":520,"loading":19,"src":521,"width":21,"fetchPriority":22},"Karty na planning poker a Kanban tabuľa na konferenčnom stole",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,523,524,525,529],{},"Mnohé tímy plánujú presne s kapacitou, ktorú im ukazuje plán v Jire. To je často chyba a vedie k neúspešným šprintom. Prečo sa to deje, keď ",[49,526,528],{"href":527},"\u002Fsk\u002Fblog\u002Fthe-importance-of-predictable-velocity","výpočty kapacity"," vyzerajú tak presne?",[41,531,533],{"id":532},"zhon-za-vyšším-výkonom","Zhon za vyšším výkonom",[12,535,536],{},"Product Owneri majú po každom úspešnom šprinte tendenciu tlačiť na vyššiu rýchlosť, čo je prirodzená reakcia na posledné výsledky. Ak tím minulý šprint dokončil určitý počet story pointov, očakáva sa, že ďalší dokončí viac. Opakuje sa to, kým nejaký šprint nezlyhá. Tlak je snahou otestovať hranice tímu. Podľa našich skúseností je kontraproduktívny. Napokon tím demotivuje, pretože každý ďalší šprint začína vnímať ako vopred prehratý.",[12,538,539],{},[15,540],{"alt":541,"height":542,"loading":32,"src":543,"width":544,"decoding":34},"Šprint odsúdený na neúspech",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,546,547],{},[38,548,541],{},[41,550,552],{"id":551},"hektický-koniec-šprintu-pri-naháňaní-termínu","Hektický koniec šprintu pri naháňaní termínu",[12,554,555],{},"Keď je kapacita naplánovaná tak, aby šprint vyplnila presne, každé oneskorenie alebo zhmotnené riziko vytvára tlak na horúčkovité tempo na konci. Tím potom dodá menej, než sľúbil, pretože ho ovládne stres. Tomuto záveru šprintu by sme sa mali vyhnúť.",[41,557,559],{"id":558},"nechajte-tím-dodať-viac-z-vlastnej-vôle","Nechajte tím dodať viac z vlastnej vôle",[12,561,562],{},"Naplánujte len 90 % kapacity tímu a zvyšných 10 % si nechajte na neplánovanú prácu z backlogu. Také úlohy sa počas šprintu ťahajú z backlogu v štýle Scrumbanu. Rezerva pohlcuje riziko a umožní tímu dokončiť šprint (alebo aspoň cieľ šprintu) o pár dní skôr. Ak šprint ohrozí externá závislosť, úloha z rezervy môže nahradiť problémovú.",[12,564,565],{},"Tých 10 % nie je súčasťou záväzku šprintu. Ak sa riziko nezhmotní, tím ju dodá ako prácu navyše; ak sa niečo pokazí, rezerva sa spotrebuje, ale cieľ a záväzok šprintu stále platia. Sledujte, koľko rezervy sa míňa: ak sa pravidelne dostane napríklad na 20 %, je čas zvýšiť rýchlosť tímu o 10 % a rezervu 10 % si ponechať.",[12,567,568],{},[15,569],{"alt":570,"height":571,"loading":32,"src":572,"width":573,"decoding":34},"Dodať skôr, dodať viac",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,575,576],{},[38,577,570],{},[12,579,580],{},"Naše skúsenosti ukazujú, že práve vtedy ľudia pracujú bez tlaku a prinesú najviac. Rýchlosť potom môže rásť tempom tímu, bez vonkajšieho tlaku a s menším stresom. Rast pôsobí prirodzene a udržateľne.",{"title":159,"searchDepth":160,"depth":160,"links":582},[583,584,585],{"id":532,"depth":160,"text":533},{"id":551,"depth":160,"text":552},{"id":558,"depth":160,"text":559},"2018-04-28","Zaviazať sa na plnú kapacitu robí každý šprint krehkým. Desaťpercentná rezerva v Scrumbane pohlcuje riziko, chráni cieľ šprintu a necháva rýchlosť rásť.","Pravidlo 10 % v Scrumbane pre každý šprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[591,592,593,594,332],"scrumban","kapacita šprintu","agilná rezerva","rýchlosť",{},"\u002Fblog\u002Fsk\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":512,"description":587},{"loc":596,"images":599,"lastmod":179},[600,601,602],{"loc":521},{"loc":543},{"loc":572},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fsk\u002Fthe-10-percent-scrumban-rule-for-every-sprint","kwNn--YF4bzysk2un5ij674K4WuG6W-QoWa41FRZ96E",{"id":607,"title":608,"author":7,"body":609,"dateModified":179,"datePublished":787,"description":788,"extension":182,"heading":789,"image":790,"imageAlt":615,"keywords":791,"locale":191,"meta":795,"navigation":193,"path":796,"reviewed":193,"seo":797,"sitemap":798,"slug":806,"stem":807,"translationKey":806,"__hash__":808},"blog\u002Fblog\u002Fsk\u002Fcorrectly-estimating-release-deadline.md","Ako odhadnúť termín vydania pomocou story pointov | AELBOX",{"type":9,"value":610,"toc":773},[611,617,620,624,631,635,638,646,650,654,657,660,664,667,675,680,684,687,691,694,698,701,708,713,717,720,724,727,735,739,743,746,751,758,766,770],[12,612,613],{},[15,614],{"alt":615,"height":18,"loading":19,"src":616,"width":21,"fetchPriority":22},"Karty na planning poker, Ganttov diagram a šálka kávy na stole","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,618,619],{},"Dôležitou súčasťou projektového riadenia je odhad termínu vydania projektu. Ako však predpovedať, kedy bude dodaný veľký a komplexný systém?",[41,621,623],{"id":622},"problémy-s-odhadovaním","Problémy s odhadovaním",[12,625,626,627,630],{},"Aby ste dodali včas, potrebujete spoľahlivý odhad práce. ",[49,628,629],{"href":527},"Odhadovať úlohy je zvyčajne ťažké",", najmä keď sa musíte zaviazať na časový odhad pri každej úlohe. Psychologicky je záväzok na konkrétny čas dokončenia náročný a takéto záväzky často padajú.",[65,632,634],{"id":633},"problém-s-časom","Problém s časom",[12,636,637],{},"Odhadovať čas je problematické z jednoduchého dôvodu: čím je úloha komplexnejšia, tým väčšia je šanca, že termín nestihnete. Záleží aj na tom, kto sa úlohy chytí. Členovia tímu pracujú rôznym tempom a dodajú rôzne množstvo práce. Keďže sa dostupnosť mení s dovolenkami a školeniami, úloha odhadnutá najrýchlejším členom tímu môže skončiť u najpomalšieho. Prehľadný Ganttov diagram sa zmení na chaos: úlohy meškajú a manažéri sa neustále obávajú, či projekt stihne termín.",[12,639,640],{},[15,641],{"alt":642,"height":643,"loading":32,"src":644,"width":645,"decoding":34},"Rozpadnutý Ganttov diagram",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,647,648],{},[38,649,642],{},[65,651,653],{"id":652},"odpor-proti-časovým-odhadom","Odpor proti časovým odhadom",[12,655,656],{},"Keď sa implementátorov pýtajú na odhad, často sa bránia: ak sa odhad nesplní, kto za to môže? A ak úlohu odhadnutú jedným človekom dostane niekto iný, koho obvinia, keď sa skutočný čas líši?",[12,658,659],{},"Výsledkom je neochota odhadovať vôbec, čo vedeniu sťažuje správne odhadnúť termíny dodania.",[41,661,663],{"id":662},"práca-so-story-pointmi","Práca so story pointmi",[12,665,666],{},"Story pointy ponúkajú alternatívu k časovým odhadom. Story point nie je pevná jednotka práce; je to relatívny odhad, ktorý rastie exponenciálne. Celý tím odhaduje spoločne počas vylaďovania backlogu.",[12,668,669],{},[15,670],{"alt":671,"height":672,"loading":32,"src":673,"width":674,"decoding":34},"Príklad story pointov",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,676,677],{},[38,678,679],{},"Príklad odhadov",[65,681,683],{"id":682},"zdieľaná-zodpovednosť","Zdieľaná zodpovednosť",[12,685,686],{},"Pri story pointoch odhaduje každú úlohu celý tím. Odhad je prijatý, keď s ním všetci súhlasia. To predchádza neskorším hádkam o tom, kto úlohu odhadol a ako dlho naozaj trvala. Tím sa dohodol vopred, takže zodpovednosť je spoločná.",[65,688,690],{"id":689},"odhadovanie-zložitosti","Odhadovanie zložitosti",[12,692,693],{},"Story pointy zachytávajú zložitosť úlohy vrátane externých závislostí a rizika, že sa niečo pokazí. Keďže nejde o záväzok voči fyzickej metrike, akou je čas, tím ich dáva ľahšie.",[65,695,697],{"id":696},"najmenší-odhad","Najmenší odhad",[12,699,700],{},"Keďže story pointy sú relatívne, potrebujete východiskový bod. Tým je najmenšia jednotka práce, ktorá si vyžaduje nejaké úsilie pri implementácii. Je to najmenšie množstvo práce, ktoré tím dokáže odhadnúť.",[12,702,703],{},[15,704],{"alt":697,"height":705,"loading":32,"src":706,"width":707,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,709,710],{},[38,711,712],{},"Najnižší odhad",[65,714,716],{"id":715},"najväčší-odhad","Najväčší odhad",[12,718,719],{},"Story pointy rastú exponenciálne, aby ukázali, že čím je úloha komplexnejšia, tým ťažšie sa odhaduje. Škála môže siahať do nekonečna (∞), hoci tento odhad sa používa zriedka. Najväčší odhad by mal predstavovať maximum práce, ktoré jeden človek v priemere za šprint zvládne. Aj dĺžka šprintu by mala zodpovedať najväčšiemu množstvu práce, ktoré jeden človek zvládne bez toho, aby stratil kontrolu nad úlohou.",[65,721,723],{"id":722},"príbehy-väčšie-než-najväčší-odhad","Príbehy väčšie než najväčší odhad",[12,725,726],{},"Niektoré úlohy dostanú viac story pointov, než jeden človek za šprint zvládne. Ak ich zaradíte do šprintu, vznikne presah. Presah robí šprint nekompletným a prácu nedokončenou. Úlohy odhadnuté nad touto hranicou treba rozdeliť na menšie celky a znova odhadnúť.",[12,728,729],{},[15,730],{"alt":731,"height":732,"loading":32,"src":733,"width":734,"decoding":34},"Rozdelenie 13 story pointov",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,736,737],{},[38,738,731],{},[41,740,742],{"id":741},"rýchlosť-v-story-pointoch","Rýchlosť v story pointoch",[12,744,745],{},"Rýchlosť je priemerný počet story pointov, ktorý tím za šprint dokončí pri plnej dostupnosti. Dostupnosť je podiel šprintu, ktorý tím môže naozaj venovať projektovej práci po odpočítaní dovoleniek, školení a podpory. Kapacita je rýchlosť vynásobená dostupnosťou.",[12,747,748],{},[38,749,750],{},"kapacita = rýchlosť × dostupnosť",[12,752,753,754,757],{},"Keďže kapacita je vyjadrená v story pointoch, dá sa previesť na čas pomocou pomeru story pointov k času, ktorý tím používa. Keď je ",[49,755,756],{"href":527},"rýchlosť predvídateľná",", termín vydania sa dá odhadnúť presne. Výsledný Ganttov diagram postavený na story pointoch a šprintoch je stabilný a predvídateľný:",[12,759,760],{},[15,761],{"alt":762,"height":763,"loading":32,"src":764,"width":765,"decoding":34},"Opravený Ganttov diagram",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,767,768],{},[38,769,762],{},[12,771,772],{},"V tom je ten posun: keď je rýchlosť stabilná, termín vydania sa stáva výpočtom, nie hádaním.",{"title":159,"searchDepth":160,"depth":160,"links":774},[775,779,786],{"id":622,"depth":160,"text":623,"children":776},[777,778],{"id":633,"depth":166,"text":634},{"id":652,"depth":166,"text":653},{"id":662,"depth":160,"text":663,"children":780},[781,782,783,784,785],{"id":682,"depth":166,"text":683},{"id":689,"depth":166,"text":690},{"id":696,"depth":166,"text":697},{"id":715,"depth":166,"text":716},{"id":722,"depth":166,"text":723},{"id":741,"depth":160,"text":742},"2018-04-14","Časové odhady zlyhávajú, keď sa mení zložitosť a dostupnosť. Zistite, ako story pointy, spoločné odhady a rýchlosť robia termín vydania predvídateľným.","Ako odhadnúť termín vydania","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[792,492,495,793,794],"termín vydania","rýchlosť šprintu","plánovanie kapacity",{},"\u002Fblog\u002Fsk\u002Fcorrectly-estimating-release-deadline",{"title":608,"description":788},{"loc":796,"images":799,"lastmod":179},[800,801,802,803,804,805],{"loc":616},{"loc":644},{"loc":673},{"loc":706},{"loc":733},{"loc":764},"correctly-estimating-release-deadline","blog\u002Fsk\u002Fcorrectly-estimating-release-deadline","VYtpQ1ByWWVDcGcFa8E85UMdfELbJu125v4dRWiVdjM",{"id":810,"title":811,"author":7,"body":812,"dateModified":179,"datePublished":787,"description":958,"extension":182,"heading":959,"image":960,"imageAlt":818,"keywords":961,"locale":191,"meta":964,"navigation":193,"path":965,"reviewed":193,"seo":966,"sitemap":967,"slug":973,"stem":974,"translationKey":973,"__hash__":975},"blog\u002Fblog\u002Fsk\u002Fthe-importance-of-predictable-velocity.md","Predvídateľná rýchlosť: spoľahlivé záväzky v šprintoch | AELBOX",{"type":9,"value":813,"toc":948},[814,820,823,827,830,833,836,844,848,852,855,859,862,865,872,879,883,887,890,893,896,899,903,906,909,916,920,924,932,935,939,945],[12,815,816],{},[15,817],{"alt":818,"height":18,"loading":19,"src":819,"width":21,"fetchPriority":22},"Karty na planning poker a stopky na konferenčnom stole","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,821,822],{},"Predvídateľná rýchlosť znamená vedieť vopred, koľko práce tím v danom období dokončí, a to na základe svojej dostupnosti.",[41,824,826],{"id":825},"problém-kolísajúcej-rýchlosti","Problém kolísajúcej rýchlosti",[12,828,829],{},"Keď rýchlosť medzi šprintami kolíše, plánovanie vydania je ťažké. Nikto nevie, kedy bude práca dodaná, a celý Scrum proces sa rozpadá. Nastúpi chaos, ktorý morálke tímu práve neprospieva.",[12,831,832],{},"Kolísanie rýchlosti zvyčajne vzniká preto, že členovia tímu sa snažia podať maximum a zaväzujú sa na viac, než dokážu dodať. V prostredí spolupráce s dobre nastaveným vývojovým procesom však úloha nie je len o samotnej implementácii. Niekomu sa pošťastí a dostane úlohy, ktoré sa implementujú pomerne jednoducho, iný narazí na problém, ktorý nikto nečakal. V jednom šprinte vyzerá rýchlosť vysoko, lebo tím doťahuje presahy; v ďalšom klesne, pretože pribudnú nové presahy.",[12,834,835],{},"Presahy vyvolávajú dojem, že tím podáva slabý výkon: mohol by toho zvládnuť viac, ale vždy sa pripletie niečo nepredvídateľné. Vedenie si problém všimne, vidí zmeškané termíny a v tíme rastie napätie.",[12,837,838],{},[15,839],{"alt":840,"height":841,"loading":32,"src":842,"width":843,"decoding":34},"Bežný šprint s presahmi",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,845,846],{},[38,847,840],{},[41,849,851],{"id":850},"najčastejšie-problémy-s-udržaním-predvídateľnosti","Najčastejšie problémy s udržaním predvídateľnosti",[12,853,854],{},"Problémy sa líšia projekt od projektu, ale mnohé sú spoločné pre všetky typy projektov. Tu sú tie obvyklé aj s praktickými riešeniami.",[65,856,858],{"id":857},"počítajte-s-nečakaným","Počítajte s nečakaným",[12,860,861],{},"Niektoré úlohy potrebujú pred začiatkom prieskum. Predstavte si funkciu, ktorá závisí od tretej strany a tá nemusí odpovedať, keď ju potrebujete. Alebo funkciu, ktorú nemožno implementovať podľa plánu, pretože tím pri vytváraní úlohy nepochopil technológiu pod ňou.",[12,863,864],{},"Ak sa taká úloha zaradí do šprintu bez potrebného prieskumu, pravdepodobne potrvá dlhšie, než sa čakalo, a vina padne na odhad. Niekto by namietal, že najprv treba spike, teda časovo ohraničený prieskum. Ako však zistíte, ktoré úlohy ho potrebujú?",[12,866,867,868,871],{},"Jediná cesta je ",[49,869,870],{"href":300},"začať na úlohe pracovať vopred",". Keď začnete skôr, než sa úloha naplánuje, problémy nájdete prv, než nastanú. Úloha sa tak do šprintu dostane až vtedy, keď je jasná a časť práce je už hotová.",[12,873,874],{},[15,875],{"alt":876,"height":841,"loading":32,"src":877,"width":878,"decoding":34},"Šprinty s úlohami začatými vopred","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,880,881],{},[38,882,876],{},[65,884,886],{"id":885},"vyhnite-sa-nejasným-definíciám-úloh","Vyhnite sa nejasným definíciám úloh",[12,888,889],{},"Niektoré úlohy vyzerajú pre svojho autora prijateľne, no vynechávajú dôležité detaily. Práve detaily implementácie môžu vážne ovplyvniť dodanie.",[12,891,892],{},"Zástupcovia biznisu môžu namietať, že definícia úlohy nemá obsahovať technické detaily, no tí, čo ju implementujú, často považujú obchodné požiadavky za príliš vágne na to, aby sa podľa nich dalo pracovať.",[12,894,895],{},"Riešením je dokument technického návrhu, na ktorý sa implementačná úloha odvoláva. Tým je jasné, čo presne treba postaviť.",[12,897,898],{},"Pomáha aj uviesť technické detaily priamo v popise úlohy, aby implementátori vedeli, čo treba urobiť, a mohli potenciálne problémy odhaliť skoro.",[65,900,902],{"id":901},"znížte-kapacitu-pomocou-fibonacciho-postupnosti","Znížte kapacitu pomocou Fibonacciho postupnosti",[12,904,905],{},"Niekedy si členovia tímu vezmú dovolenku alebo do šprintu pripadne sviatok. Dostupnosť znižujú aj školenia a interné akcie: čas, ktorý tím môže venovať projektovej práci. V takom prípade treba kapacitu znížiť tak, aby odzrkadľovala chýbajúcich ľudí.",[12,907,908],{},"Rýchlosť sa považuje za konštantnú, no počíta sa z priemernej rýchlosti všetkých členov tímu. Pre jednoduchosť predpokladajme, že jeden človek za deň dokončí jeden story point. Ak jeden človek chýba jeden deň, znížte kapacitu šprintu o jeden story point. Ak dvaja ľudia chýbajú dva dni (štyri story pointy), znížte kapacitu o päť story pointov, teda na ďalšie Fibonacciho číslo, a nie o štyri. Ak dvaja ľudia chýbajú tri dni, znížte kapacitu o osem bodov namiesto šiestich, aby ste pokryli riziko závislostí.",[12,910,911],{},[15,912],{"alt":913,"height":841,"loading":32,"src":914,"width":915,"decoding":34},"Zaviazať sa na menšiu kapacitu, než ukazuje výpočet","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,917,918],{},[38,919,913],{},[65,921,923],{"id":922},"vyhýbajte-sa-závislým-úlohám","Vyhýbajte sa závislým úlohám",[12,925,926,927,931],{},"Často jedna osoba dokončuje úlohu, od ktorej závisí úloha iného člena tímu. Vznikajú tak ",[49,928,930],{"href":929},"\u002Fsk\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","závislosti v rámci tímu aj medzi tímami",". Ak sa prvá úloha oneskorí, posunie sa každá závislá úloha. Členovia tímu čakajú, potom sa ponáhľajú, keď sa závislosť vyrieši, a plytvajú cenným časom.",[12,933,934],{},"Závislé úlohy môžu začať skôr, takže v ďalšom šprinte sú kritické nadradené úlohy takmer hotové. To znižuje vplyv závislosti na rýchlosť v aktuálnom šprinte.",[65,936,938],{"id":937},"odhadujte-čestne","Odhadujte čestne",[12,940,941,944],{},[49,942,943],{"href":286},"Čestne odhadovať úlohy"," je ťažké a vyžaduje pozornosť celého tímu. Každý by mal odhadovať bez vplyvu odhadov ostatných. Iba čestné odhady ukážu, ako dlho epik naozaj potrvá, a udržia termíny vydania realistické.",[12,946,947],{},"Predvídateľná rýchlosť nie je nástroj ani metrika, ktorú tímu nariadite; je to výsledok postupného odstraňovania prekvapení. Začnite piatimi krokmi vyššie a termín vydania prestane byť hádaním.",{"title":159,"searchDepth":160,"depth":160,"links":949},[950,951],{"id":825,"depth":160,"text":826},{"id":850,"depth":160,"text":851,"children":952},[953,954,955,956,957],{"id":857,"depth":166,"text":858},{"id":885,"depth":166,"text":886},{"id":901,"depth":166,"text":902},{"id":922,"depth":166,"text":923},{"id":937,"depth":166,"text":938},"Prečo rýchlosť medzi šprintami kolíše a ako urobiť záväzky predvídateľnými: päť praktických krokov pre plánovanie, kapacitu a závislosti.","Prečo je dôležitá predvídateľná rýchlosť","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[962,793,495,492,963],"predvídateľná rýchlosť","plánovanie vydania",{},"\u002Fblog\u002Fsk\u002Fthe-importance-of-predictable-velocity",{"title":811,"description":958},{"loc":965,"images":968,"lastmod":179},[969,970,971,972],{"loc":819},{"loc":842},{"loc":877},{"loc":914},"the-importance-of-predictable-velocity","blog\u002Fsk\u002Fthe-importance-of-predictable-velocity","-_iku8Wcu4l_qAuuIFvK8ReQ-7_0fsTDMYFmo0rLqy4",1795345552480]