[{"data":1,"prerenderedAt":976},["ShallowReactive",2],{"blog-index-no":3},[4,204,346,510,606,809],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fno\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Sprintavhengigheter og kjedede pull-forespørsler | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"En metallkjetting, planning poker-kort og en kaffekopp på et bord",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Sprinter inneholder ofte avhengige arbeidselementer, enten innenfor ett team eller på tvers av flere Scrum-team. I en perfekt verden ville avhengigheter ikke finnes; i praksis vinner forretningsbehovene, og avhengigheter legges til for å forkorte utgivelsessyklusen. Denne artikkelen beskriver én måte å håndtere avhengige oppgaver på i programvareteam.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Avhengigheter mellom oppgaver",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"den-gammeldagse-måten","Den gammeldagse måten",[12,46,47,48,53],{},"Den enkleste tilnærmingen er å starte en oppgave så snart avhengigheten er slått sammen til hovedgrenen. Med den tilnærmingen blir noen teammedlemmer sittende ledige til en oppgave er klar. Etter hvert er det lite eller ingen tid igjen til de resterende avhengige oppgavene. De siste oppgavene overføres til neste sprint, og ",[49,50,52],"a",{"href":51},"\u002Fno\u002Fblog\u002Fcomparison-metrics-for-agile-teams","teamet er misfornøyd",".",[12,55,56],{},"Hvorfor skjer dette selv når kapasiteten er riktig estimert? Det skjer hovedsakelig på grunn av dødtid mens man venter på at kolleger skal bli ferdige. Selv små forsinkelser forsterker hverandre, særlig i korte sprinter.",[41,58,60],{"id":59},"jobbe-med-avhengige-oppgaver-samtidig","Jobbe med avhengige oppgaver samtidig",[12,62,63],{},"Det er en måte å gjøre dette på med en liten ekstrakostnad. Når teammedlemmer jobber med oppgaver samtidig, er det flere fordeler.",[65,66,68],"h3",{"id":67},"bedre-samarbeid","Bedre samarbeid",[12,70,71],{},"Når teammedlemmer jobber samtidig med avhengige oppgaver, ligner det parprogrammering. Én person må forstå oppgaven oppstrøms; den andre må forstå oppgaven nedstrøms. Teamet får bredere kunnskap om problemene som løses.",[65,73,75],{"id":74},"unngå-dødtid","Unngå dødtid",[12,77,78],{},"Når oppgavene går samtidig, venter ingen på at en rettelse skal lande. Alle kan jobbe samtidig, med mer spontane diskusjoner når spørsmål dukker opp.",[65,80,82],{"id":81},"pull-forespørsler-klare-for-kodegjennomgang-tidligere","Pull-forespørsler klare for kodegjennomgang tidligere",[12,84,85],{},"Når grenen din er basert på en kollegas gren, er det lettere å godkjenne den opprinnelige pull-forespørselen. Du forstår allerede hvordan arbeidselementet oppstrøms ble implementert, og den opprinnelige grenen er testet og gjennomgått underveis i implementeringen. Det er ikke lenger ukjent terreng.",[41,87,89],{"id":88},"bruk-kjedede-stablede-pull-forespørsler","Bruk kjedede (stablede) pull-forespørsler",[12,91,92],{},"Dette nivået av samtidighet krever riktige verktøy. Med Git-basert versjonskontroll er det enkelt. Trinnene nedenfor beskriver prosessen.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Avhengighetstre",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Avhengighetstre (arbeid med 6 avhengige oppgaver samtidig)",[65,107,109],{"id":108},"skisser-avhengighetene-tydelig","Skisser avhengighetene tydelig",[12,111,112],{},"Definer avhengighetskjeden under sprintplanleggingen. Kjeden av pull-forespørsler følger deretter den definisjonen nøyaktig. Å endre kjeden midt i utviklingen er dyrt på grunn av rebasing.",[65,114,116],{"id":115},"start-med-rotoppgavene-først","Start med rotoppgavene først",[12,118,119],{},"Hver avhengighetskjede har rotoppgaver som ikke avhenger av noe annet. Arbeidet med dem kan starte på dag én.",[65,121,123],{"id":122},"gjør-kjerneimplementeringen-først","Gjør kjerneimplementeringen først",[12,125,126],{},"Dette kan komme i konflikt med testdrevet utvikling, der testene kommer først. For å holde kjeden av pull-forespørsler håndterbar, implementer kjernen først. Det gir avhengige teammedlemmer tilgang tidligere.",[65,128,130],{"id":129},"organiser-og-gjennomgå-kode-i-en-fifo-kø","Organiser og gjennomgå kode i en FIFO-kø",[12,132,133],{},"Den første grenen som opprettes, bør gjennomgås og slås sammen først. Hver sammenslåing utløser CI; hvis den bryter hovedbyggingen, rettes problemet mens det fortsatt er lite.",[41,135,137],{"id":136},"ekstrakostnaden","Ekstrakostnaden",[12,139,140],{},"Å vedlikeholde en kjede av avhengige grener har fordeler, men også noen ulemper.",[65,142,144],{"id":143},"rebase-eller-sammenslåing","Rebase eller sammenslåing",[12,146,147],{},"Kjeden må holdes synkronisert, noe som krever innsats. Moderne verktøy tilbyr synkronisering med ett klikk mot basisgrenen når det ikke er konflikter. Bruk det ved behov, når det er trygt å hente inn endringer oppstrøms. Når bygget er grønt og funksjonen virker, synkroniser.",[65,149,151],{"id":150},"lagarbeid","Lagarbeid",[12,153,154],{},"En avhengighetskjede krever et samarbeidsorientert team der medlemmene er villige til å snakke sammen. Det kan ikke fungere hvis folk jobber isolert.",[12,156,157],{},"Avhengige arbeidselementer bør helst holdes utenfor inneværende sprint. Når forretningsbehov krever at de går parallelt, er en kjede av avledede grener en praktisk måte å håndtere avhengighetskostnaden på.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Avhengige arbeidselementer stopper en sprint mens folk venter. Se hvordan kjedede pull-forespørsler holder arbeidet i gang og kutter dødtiden i teamet.","md","Håndtere sprintavhengigheter med kjedede pull-forespørsler","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"sprintavhengigheter","stablede pull-forespørsler","kjedede pull-forespørsler","kodegjennomgang","smidig levering","no",{},true,"\u002Fblog\u002Fno\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fno\u002Fmanage-sprint-dependencies-with-chained-pull-requests","MJiou8uSmsNGwjpumWwRsf85A3vZcGtBy8b87YtSKZ8",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":325,"description":326,"extension":182,"heading":327,"image":328,"imageAlt":213,"keywords":329,"locale":191,"meta":335,"navigation":193,"path":336,"reviewed":193,"seo":337,"sitemap":338,"slug":343,"stem":344,"translationKey":343,"__hash__":345},"blog\u002Fblog\u002Fno\u002Fcomparison-metrics-for-agile-teams.md","Måltall for å sammenligne smidige team | AELBOX",{"type":9,"value":208,"toc":316},[209,216,219,223,226,234,238,242,245,249,252,260,264,272,276,279,282,289,293,296,303,306,310,313],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"En linjal, planning poker-kort og en kaffekopp på et bord",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Å sammenligne smidige team er vanskelig, og det er verdt å spørre hvorfor vi sammenligner dem i det hele tatt. Hvordan hjelper det egentlig å sammenligne team i ulike domener?",[41,220,222],{"id":221},"skape-en-konkurranse","Skape en konkurranse",[12,224,225],{},"Team bør ikke rangeres mot hverandre etter vilkårlige måltall. Det demotiverer bare folk. I stedet bør måltall gi hvert team like muligheter til å konkurrere. Da blir prestasjonene bedre fordi teamene vil det, ikke fordi noen presser dem.",[12,227,228],{},[15,229],{"alt":230,"height":231,"loading":32,"src":232,"width":233,"decoding":34},"Skap en konkurranse",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,235,236],{},[38,237,230],{},[41,239,241],{"id":240},"måltallene-som-skaper-like-muligheter","Måltallene som skaper like muligheter",[12,243,244],{},"Her er fire grunnleggende måltall for å sammenligne team. De måler hvert teams evne til å konkurrere på like vilkår, ikke noe mer. Sammenlignbare måltall skaper like muligheter.",[65,246,248],{"id":247},"vellykkede-sprinter","Vellykkede sprinter",[12,250,251],{},"Hvis en sprint bare var en tidsramme, ville den ikke tjene noe formål. En sprint er en milepæl og trenger et mål. Sprintmålet (det viktigste settet med historier) er den større milepælen; å fullføre hver historie er den mindre. Hold en demo på tvers av team ved slutten av hver sprint, der teamene viser det de har levert. Den sunne konkurransen oppmuntrer teamene til å fullføre sprintmålene sine. Folk trenger et synlig mål for å bli motiverte.",[12,253,254],{},[15,255],{"alt":256,"height":257,"loading":32,"src":258,"width":259,"decoding":34},"Sprint mot et mål",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,261,262],{},[38,263,256],{},[12,265,266,267,271],{},"Kan dette bli et spill med for høye eller for lave forpliktelser? Hvis et team forplikter seg til for lite, blir det tydelig i demoen: det er mindre å vise. Hvis det forplikter seg til for mye, blir demoen ",[268,269,270],"strong",{},"enda en mislykket sprint",". Å levere det teamet forpliktet seg til, bygger motivasjon til å gjøre mer. Teamene føler seg tilfredse med arbeidet.",[65,273,275],{"id":274},"stabil-hastighet-og-ærlig-estimering","Stabil hastighet og ærlig estimering",[12,277,278],{},"Dette er kunnskapsarbeid, ikke samlebåndsarbeid. Hvis ingen i teamet forstår et problem godt nok til å estimere løsningen, ble problemet ikke undersøkt på forhånd.",[12,280,281],{},"En tidsbegrenset spike i forrige sprint, etterfulgt av en gjennomgang av funnene i teamet, gjør det enkelt å dele implementeringen i mindre historier og estimere dem ordentlig. For komplekst arbeid kan du skrive et fyldigere teknisk designdokument som lister opp implementeringshistoriene.",[12,283,284,285,53],{},"Spiken og designarbeidet er selv historier som kan estimeres. Nøkkelen er å definere strukturen og rekkefølgen på arbeidet for en kompleks løsning. I stedet for å forplikte seg til en historie teamet ikke forstår, kan du lage en researchoppgave som fyller gapet. Da er estimeringen ",[49,286,288],{"href":287},"\u002Fno\u002Fblog\u002Fsheepherding-story-points","forankret i evidens",[65,290,292],{"id":291},"forutsigbar-kapasitet-unngå-uventet-arbeid","Forutsigbar kapasitet (unngå uventet arbeid)",[12,294,295],{},"Research kommer først; implementeringen følger. Når researchen avdekker problemer, opprettes og estimeres nye arbeidselementer. Da får du et mye klarere bilde av neste sprint. Kjent arbeid kan estimeres og planlegges; ukjent arbeid får et tidsbegrenset research-arbeidselement før det estimeres. Disiplinen ligger i å dele stort arbeid i små, estimerbare biter.",[12,297,298,299,53],{},"Komplekst arbeid kan starte tidlig, selv om det bare er for å oppdage at det trenger sitt eget sett med historier. Det reduserer fortsatt ",[49,300,302],{"href":301},"\u002Fno\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","risikoen for det ukjente",[12,304,305],{},"Support og brannslukking i produksjon går vanligvis i en tidsbegrenset Kanban-flyt utenfor sprinten. Der blir tid til første respons og brudd på SLA brukt som sammenligningsmåltall.",[65,307,309],{"id":308},"teamets-tilgjengelighet-tid-brukt-på-oppgaver-delt-på-total-tid-i-en-sprint","Teamets tilgjengelighet (tid brukt på oppgaver delt på total tid i en sprint)",[12,311,312],{},"Tilgjengelighet er andelen av tiden teammedlemmer bruker på estimert arbeid. Hvis ett team oftere enn andre blir trukket inn i opplæring, kunnskapsdeling eller annet internt arbeid, må ubalansen rettes opp. Den eneste måten å holde hastigheten stabil på er å holde tilgjengeligheten stabil. Når tilgjengeligheten er lik mellom teamene, vil de andre sammenligningsmåltallene fungere.",[12,314,315],{},"Å sammenligne team handler ikke om å straffe lav ytelse, men om å øke motivasjonen og lysten til å konkurrere og levere mer. Derfor bør disse måltallene ikke være synlige for det enkelte teammedlem: de er et verktøy for coaching, ikke for offentlige rangeringer. Ved å følge disse måltallene og veilede Scrum-mastere indirekte gir du teamene like vilkår for å konkurrere.",{"title":159,"searchDepth":160,"depth":160,"links":317},[318,319],{"id":221,"depth":160,"text":222},{"id":240,"depth":160,"text":241,"children":320},[321,322,323,324],{"id":247,"depth":166,"text":248},{"id":274,"depth":166,"text":275},{"id":291,"depth":166,"text":292},{"id":308,"depth":166,"text":309},"2018-05-04","Måltall skal skape like vilkår, ikke en resultattavle. Fire sammenligningsmåltall som motiverer smidige team og gjør konkurransen rettferdig, uten å straffe noen.","Måltall for å sammenligne smidige team","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[330,331,332,333,334],"smidige måltall","teamhastighet","smidige team","scrum","kapasitet",{},"\u002Fblog\u002Fno\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":326},{"loc":336,"images":339,"lastmod":179},[340,341,342],{"loc":215},{"loc":232},{"loc":258},"comparison-metrics-for-agile-teams","blog\u002Fno\u002Fcomparison-metrics-for-agile-teams","u4DXowUSAkDQhzZGEK31WTDMx9VS2HVtI1ppIbNQLnA",{"id":347,"title":348,"author":7,"body":349,"dateModified":179,"datePublished":487,"description":488,"extension":182,"heading":489,"image":490,"imageAlt":355,"keywords":491,"locale":191,"meta":496,"navigation":193,"path":497,"reviewed":193,"seo":498,"sitemap":499,"slug":507,"stem":508,"translationKey":507,"__hash__":509},"blog\u002Fblog\u002Fno\u002Fsheepherding-story-points.md","Saueeffekten i story points: ankring i planning poker | AELBOX",{"type":9,"value":350,"toc":478},[351,357,360,364,371,379,383,387,390,393,400,404,407,411,414,419,423,427,430,437,441,445,448,453,457,461,472,475],[12,352,353],{},[15,354],{"alt":355,"height":18,"loading":19,"src":356,"width":21,"fetchPriority":22},"En saueflokk og planning poker-kort på et salongbord","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,358,359],{},"Estimering med story points blir ofte neglisjert eller gjort i chatrom og åpne møter der alle kan se eller høre hver stemme. Å vite hvordan andre stemte, forvrenger resultatet og gir unøyaktige estimater. Gjentatte unøyaktige estimater fører til feilaktige planer og forsinkede eller avlyste leveranser. Her er hva som skjer i en åpen avstemning.",[41,361,363],{"id":362},"karakterene-i-avstemningen","Karakterene i avstemningen",[12,365,366,367,370],{},"Flere karakterer dukker opp i en åpen estimeringsavstemning. Estimatet avhenger av hvem som stemmer først, og det er vanligvis langt fra ærlig. Hvorfor betyr rekkefølgen så mye i en åpen avstemning? På grunn av ",[268,368,369],{},"saueeffekten",": ankringseffekten som får andre teammedlemmer til å kopiere det første estimatet.",[12,372,373],{},[15,374],{"alt":375,"height":376,"loading":32,"src":377,"width":378,"decoding":34},"Saueeffekten",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,380,381],{},[38,382,375],{},[65,384,386],{"id":385},"den-overmodige-stemmegiveren","Den overmodige stemmegiveren",[12,388,389],{},"Hvert team har minst ett medlem som mener de kjenner systemet best. De stemmer vanligvis først, fordi svarene virker opplagte for dem. De overser ofte detaljer som kan spolere estimatet. Slike detaljer kan avdekkes på forhånd, men bare hvis noen tar initiativ til en diskusjon. Det kan ikke skje i en åpen avstemning.",[12,391,392],{},"Denne personen stemmer vanligvis lavere enn det ærlige estimatet. Kanskje er det bare de som kunne fullført historien så raskt, og bare med flaks.",[12,394,395],{},[15,396],{"alt":386,"height":397,"loading":32,"src":398,"width":399,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,401,402],{},[38,403,386],{},[12,405,406],{},"Alle andre følger etter, så oppgaven virker enkel og gjennomførbar for hvem som helst innen tidsrammen. I praksis er det vanligvis noen andre som ender med å gjøre den.",[65,408,410],{"id":409},"den-stille-stemmegiveren","Den stille stemmegiveren",[12,412,413],{},"Det er vanligvis mer enn én stille stemmegiver, og de er redde for å stemme først. De venter på at noen andre skal stemme, slik at de kan kopiere. De deltar sjelden i diskusjonen og svarer bare når de blir spurt. De stemmer som nummer to, rett før de uengasjerte stemmegiverne.",[12,415,416],{},[15,417],{"alt":410,"height":397,"loading":32,"src":418,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,420,421],{},[38,422,410],{},[65,424,426],{"id":425},"den-uengasjerte-stemmegiveren","Den uengasjerte stemmegiveren",[12,428,429],{},"De er vanskelige å få tak i under implementeringen, men atferden deres er tydelig under avstemningen. De stemmer alltid sist og kopierer andres estimat. Hvis estimatene er ulike, velger de det vanligste. De vil ikke forklare hvorfor de valgte et lavere eller høyere tall, så de unngår samarbeid i raffineringen og viker unna spørsmål.",[12,431,432],{},[15,433],{"alt":426,"height":434,"loading":32,"src":435,"width":436,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,438,439],{},[38,440,426],{},[65,442,444],{"id":443},"den-trette-stemmegiveren","Den trette stemmegiveren",[12,446,447],{},"Noen teammedlemmer klarer ikke å holde konsentrasjonen lenge og går glipp av viktige deler av diskusjonen. De mister konteksten og gjetter eller leter etter det vanligste svaret å kopiere.",[12,449,450],{},[15,451],{"alt":444,"height":397,"loading":32,"src":452,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,454,455],{},[38,456,444],{},[41,458,460],{"id":459},"hvordan-holde-oppmerksomheten-under-estimeringen","Hvordan holde oppmerksomheten under estimeringen",[12,462,463,464,468,469,471],{},"Estimering er viktig fordi bare ærlige story points kan ",[49,465,467],{"href":466},"\u002Fno\u002Fblog\u002Fcorrectly-estimating-release-deadline","holde et prosjekt på sporet mot utgivelsesdatoen",". Nøkkelen til ærlig estimering er å motvirke ",[268,470,369],{},", enten du bruker papirkort eller programvare.",[12,473,474],{},"Teammedlemmer bør aldri se hverandres estimater før moderatoren avslører dem. Da begynner den stille stemmegiveren å tenke, den uengasjerte blir interessert og den trette våkner. Det beste spørsmålet å stille, særlig når noen er uenig med gruppen, er «hvorfor stemte du X story points?». Det starter en samtale om de virkelige implementeringsproblemene. Lukkede spørsmål som «er du enig i X story points?» inviterer til et meningsløst «ja».",[12,476,477],{},"Et godt estimeringsverktøy gjør raffineringen mer engasjerende og holder alle årvåkne og klare til å diskutere, slik at selv komplekse historier får bedre estimater.",{"title":159,"searchDepth":160,"depth":160,"links":479},[480,486],{"id":362,"depth":160,"text":363,"children":481},[482,483,484,485],{"id":385,"depth":166,"text":386},{"id":409,"depth":166,"text":410},{"id":425,"depth":166,"text":426},{"id":443,"depth":166,"text":444},{"id":459,"depth":160,"text":460},"2018-04-30","Åpne stemmer lar det første estimatet styre hele rommet. Se hvordan saueeffekten forskyver story points, og hvordan du kjører planning poker på en ærlig måte.","Saueeffekten i story points","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[492,493,494,369,495],"story points","planning poker","ankring","smidig estimering",{},"\u002Fblog\u002Fno\u002Fsheepherding-story-points",{"title":348,"description":488},{"loc":497,"images":500,"lastmod":179},[501,502,503,504,505,506],{"loc":356},{"loc":377},{"loc":398},{"loc":418},{"loc":435},{"loc":452},"sheepherding-story-points","blog\u002Fno\u002Fsheepherding-story-points","OziWnHdcH1bCeg9c5N0o6-oTpdifRwPW7Ljs7xofknU",{"id":511,"title":512,"author":7,"body":513,"dateModified":179,"datePublished":586,"description":587,"extension":182,"heading":588,"image":589,"imageAlt":519,"keywords":590,"locale":191,"meta":595,"navigation":193,"path":596,"reviewed":193,"seo":597,"sitemap":598,"slug":603,"stem":604,"translationKey":603,"__hash__":605},"blog\u002Fblog\u002Fno\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","10-prosentregelen fra Scrumban for hver sprint | AELBOX",{"type":9,"value":514,"toc":581},[515,522,530,534,537,545,549,553,556,560,563,566,574,578],[12,516,517],{},[15,518],{"alt":519,"height":520,"loading":19,"src":521,"width":21,"fetchPriority":22},"Planning poker-kort og en Kanban-tavle på et salongbord",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,523,524,525,529],{},"Mange team planlegger å bruke nøyaktig den kapasiteten som vises i Jira-planen. Det er ofte en feil og fører til mislykkede sprinter. Hvorfor skjer det når ",[49,526,528],{"href":527},"\u002Fno\u002Fblog\u002Fthe-importance-of-predictable-velocity","kapasitetsberegningene"," ser så presise ut?",[41,531,533],{"id":532},"jaget-etter-å-levere-mer","Jaget etter å levere mer",[12,535,536],{},"Produkteiere har en tendens til å presse på for høyere hastighet etter hver vellykket sprint, en naturlig reaksjon på de siste resultatene. Hvis teamet fullførte et visst antall story points forrige sprint, forventes det å fullføre flere neste sprint. Dette gjentas til en sprint mislykkes. Presset er et forsøk på å teste teamets grenser. Etter vår erfaring er det kontraproduktivt. Det demotiverer til slutt teamet, som begynner å se på hver fremtidige sprint som dømt til å mislykkes.",[12,538,539],{},[15,540],{"alt":541,"height":542,"loading":32,"src":543,"width":544,"decoding":34},"Sprinten som er dømt til å mislykkes",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,546,547],{},[38,548,541],{},[41,550,552],{"id":551},"den-hektiske-slutten-på-en-sprint-under-leveringspress","Den hektiske slutten på en sprint under leveringspress",[12,554,555],{},"Når kapasiteten er planlagt til å fylle sprinten nøyaktig, skaper enhver forsinkelse eller realisert risiko press for å jobbe i et hektisk tempo på slutten. Teamet leverer da mindre enn lovet fordi stresset tar over. Denne hektiske avslutningen bør fjernes.",[41,557,559],{"id":558},"la-teamet-levere-mer-av-egen-vilje","La teamet levere mer av egen vilje",[12,561,562],{},"Planlegg bare 90 prosent av teamets kapasitet og reserver de resterende 10 prosentene til uplanlagt backloggarbeid. Disse oppgavene hentes fra backloggen på Scrumban-vis i løpet av sprinten. Bufferen tar risiko og lar teamet fullføre sprinten (eller i det minste sprintmålet) noen dager tidlig. Hvis en ekstern avhengighet truer sprinten, kan en bufret oppgave erstatte den problematiske.",[12,564,565],{},"Disse 10 prosentene er ikke en del av sprintforpliktelsen. Hvis risikoen ikke materialiserer seg, leverer teamet det som ekstra arbeid; hvis noe går galt, brukes bufferen, men sprintmålet og forpliktelsen holdes fortsatt. Følg med på hvor mye av bufferen som brukes: hvis den jevnlig når 20 prosent, for eksempel, er det på tide å øke teamets hastighet med 10 prosent mens bufferen på 10 prosent beholdes.",[12,567,568],{},[15,569],{"alt":570,"height":571,"loading":32,"src":572,"width":573,"decoding":34},"Lever tidlig, lever ekstra",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,575,576],{},[38,577,570],{},[12,579,580],{},"Vår erfaring viser at det er da ansatte jobber uten press og bidrar mest. Hastigheten kan da øke i teamets eget tempo, uten press utenfra og med mindre stress. Økningen føles naturlig og bærekraftig.",{"title":159,"searchDepth":160,"depth":160,"links":582},[583,584,585],{"id":532,"depth":160,"text":533},{"id":551,"depth":160,"text":552},{"id":558,"depth":160,"text":559},"2018-04-28","Å forplikte seg til full kapasitet gjør hver sprint skjør. En Scrumban-buffer på 10 prosent tar risiko, beskytter sprintmålet og lar hastigheten vokse naturlig.","10-prosentregelen fra Scrumban for hver sprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[591,592,593,594,333],"scrumban","sprintkapasitet","smidig buffer","hastighet",{},"\u002Fblog\u002Fno\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":512,"description":587},{"loc":596,"images":599,"lastmod":179},[600,601,602],{"loc":521},{"loc":543},{"loc":572},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fno\u002Fthe-10-percent-scrumban-rule-for-every-sprint","gzKe97Qi92mSXMzRA-788EPtiQWNKewW3sNmElrO1AQ",{"id":607,"title":608,"author":7,"body":609,"dateModified":179,"datePublished":787,"description":788,"extension":182,"heading":789,"image":790,"imageAlt":615,"keywords":791,"locale":191,"meta":795,"navigation":193,"path":796,"reviewed":193,"seo":797,"sitemap":798,"slug":806,"stem":807,"translationKey":806,"__hash__":808},"blog\u002Fblog\u002Fno\u002Fcorrectly-estimating-release-deadline.md","Hvordan estimere en utgivelsesdato med story points | AELBOX",{"type":9,"value":610,"toc":773},[611,617,620,624,631,635,638,646,650,654,657,660,664,667,675,680,684,687,691,694,698,701,708,713,717,720,724,727,735,739,743,746,751,758,766,770],[12,612,613],{},[15,614],{"alt":615,"height":18,"loading":19,"src":616,"width":21,"fetchPriority":22},"Planning poker-kort, et Gantt-diagram og en kaffekopp på et bord","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,618,619],{},"En viktig del av prosjektledelse er å estimere utgivelsesdatoen til et prosjekt. Men hvordan forutser du når et stort og komplekst system blir levert?",[41,621,623],{"id":622},"estimeringsproblemene","Estimeringsproblemene",[12,625,626,627,630],{},"For å levere i tide trenger du et pålitelig estimat på arbeidet. ",[49,628,629],{"href":527},"Å estimere oppgaver er vanligvis vanskelig",", særlig når du må forplikte deg til tidsbaserte estimater for hver oppgave. Psykologisk er det vanskelig å forplikte seg til et tidspunkt for ferdigstillelse, og slike forpliktelser feiler ofte.",[65,632,634],{"id":633},"problemet-med-tid","Problemet med tid",[12,636,637],{},"Å estimere tid er problematisk av en enkel grunn: jo mer kompleks oppgaven er, desto større er sjansen for å bomme på fristen. Det avhenger også av hvem som tar oppgaven. Teammedlemmer jobber i ulikt tempo og leverer ulike mengder arbeid. Fordi tilgjengeligheten endres med ferie og opplæring, kan en oppgave som ble estimert av det raskeste teammedlemmet, ende hos det tregeste. Det ryddige Gantt-diagrammet blir et kaos: oppgaver blir forsinket, og ledere bekymrer seg konstant for om prosjektet blir ferdig i tide.",[12,639,640],{},[15,641],{"alt":642,"height":643,"loading":32,"src":644,"width":645,"decoding":34},"Ødelagt Gantt-diagram",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,647,648],{},[38,649,642],{},[65,651,653],{"id":652},"motstanden-mot-tidsestimater","Motstanden mot tidsestimater",[12,655,656],{},"Når de som skal implementere, blir bedt om et estimat, motsetter de seg ofte: hvis estimatet ikke holder, hvem får skylden? Og hvis en oppgave som én person estimerte, ender hos noen andre, hvem får skylden når den faktiske tiden avviker?",[12,658,659],{},"Resultatet er motvilje mot å estimere i det hele tatt, noe som gjør det vanskelig for ledelsen å estimere leveringsdatoer på en god måte.",[41,661,663],{"id":662},"bruk-story-points","Bruk story points",[12,665,666],{},"Story points er et alternativ til tidsbaserte estimater. Et story point er ikke en fast enhet arbeid; det er et relativt estimat som vokser eksponentielt. Hele teamet estimerer sammen under raffineringen.",[12,668,669],{},[15,670],{"alt":671,"height":672,"loading":32,"src":673,"width":674,"decoding":34},"Eksempel på story points",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,676,677],{},[38,678,679],{},"Eksempel på estimater",[65,681,683],{"id":682},"dele-ansvaret","Dele ansvaret",[12,685,686],{},"Med story points estimerer hele teamet hver oppgave. Estimatet godtas når alle er enige. Det unngår senere diskusjoner om hvem som estimerte oppgaven, og hvor lang tid den egentlig tok. Teamet ble enige på forhånd, så ansvaret er delt.",[65,688,690],{"id":689},"estimere-kompleksitet","Estimere kompleksitet",[12,692,693],{},"Story points fanger opp kompleksiteten i en oppgave, inkludert eksterne avhengigheter og risikoen for at noe går galt. Fordi de ikke er en forpliktelse til en fysisk størrelse som tid, er de lettere for teamet å gi.",[65,695,697],{"id":696},"det-minste-estimatet","Det minste estimatet",[12,699,700],{},"Fordi story points er relative, trenger du et anker å starte fra. Ankeret er den minste arbeidsenheten som krever en viss implementeringsinnsats. Det er den minste mengden arbeid teamet kan estimere.",[12,702,703],{},[15,704],{"alt":697,"height":705,"loading":32,"src":706,"width":707,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,709,710],{},[38,711,712],{},"Det laveste estimatet",[65,714,716],{"id":715},"det-største-estimatet","Det største estimatet",[12,718,719],{},"Story points vokser eksponentielt for å vise at jo mer kompleks en oppgave er, desto vanskeligere er den å estimere. Skalaen kan strekkes til uendelig (∞), selv om det estimatet sjelden brukes. Det største estimatet bør tilsvare det meste én person i gjennomsnitt kan fullføre i en sprint. Selve sprintlengden bør tilsvare den største mengden arbeid én person kan håndtere uten å miste kontrollen over oppgaven.",[65,721,723],{"id":722},"historiene-som-er-større-enn-det-største-estimatet","Historiene som er større enn det største estimatet",[12,725,726],{},"Noen oppgaver får flere story points enn én person kan fullføre i en sprint. Legger du dem i en sprint, fører det til overføring. Overføring gjør at sprinten føles ufullstendig og arbeidet uferdig. Oppgaver som er estimert over den grensen, må deles i mindre enheter og estimeres på nytt.",[12,728,729],{},[15,730],{"alt":731,"height":732,"loading":32,"src":733,"width":734,"decoding":34},"Dele 13 story points",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,736,737],{},[38,738,731],{},[41,740,742],{"id":741},"hastigheten-målt-i-story-points","Hastigheten målt i story points",[12,744,745],{},"Hastighet er gjennomsnittlig antall story points et team fullfører i en sprint med full tilgjengelighet. Tilgjengelighet er andelen av sprinten teamet faktisk kan bruke på prosjektarbeid etter ferie, opplæring og support. Kapasitet er hastighet multiplisert med tilgjengelighet.",[12,747,748],{},[38,749,750],{},"kapasitet = hastighet × tilgjengelighet",[12,752,753,754,757],{},"Fordi kapasiteten uttrykkes i story points, kan den regnes om til tid ved hjelp av teamets forhold mellom story points og tid. Når ",[49,755,756],{"href":527},"hastigheten er forutsigbar",", kan utgivelsesdatoen estimeres presist. Basert på story points og sprinter blir det resulterende Gantt-diagrammet stabilt og forutsigbart:",[12,759,760],{},[15,761],{"alt":762,"height":763,"loading":32,"src":764,"width":765,"decoding":34},"Rettet Gantt-diagram",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,767,768],{},[38,769,762],{},[12,771,772],{},"Det er skiftet: når hastigheten først er stabil, blir utgivelsesdatoen en beregning i stedet for en gjetning.",{"title":159,"searchDepth":160,"depth":160,"links":774},[775,779,786],{"id":622,"depth":160,"text":623,"children":776},[777,778],{"id":633,"depth":166,"text":634},{"id":652,"depth":166,"text":653},{"id":662,"depth":160,"text":663,"children":780},[781,782,783,784,785],{"id":682,"depth":166,"text":683},{"id":689,"depth":166,"text":690},{"id":696,"depth":166,"text":697},{"id":715,"depth":166,"text":716},{"id":722,"depth":166,"text":723},{"id":741,"depth":160,"text":742},"2018-04-14","Tidsestimater svikter når kompleksitet og tilgjengelighet endrer seg. Slik gjør story points, felles estimater og hastighet utgivelsesdatoer forutsigbare.","Hvordan estimere en utgivelsesdato","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[792,492,495,793,794],"utgivelsesdato","sprinthastighet","kapasitetsplanlegging",{},"\u002Fblog\u002Fno\u002Fcorrectly-estimating-release-deadline",{"title":608,"description":788},{"loc":796,"images":799,"lastmod":179},[800,801,802,803,804,805],{"loc":616},{"loc":644},{"loc":673},{"loc":706},{"loc":733},{"loc":764},"correctly-estimating-release-deadline","blog\u002Fno\u002Fcorrectly-estimating-release-deadline","Y2wJeJQ5o77Q-zZAHYn0I8xY9P0MKkfrmPc1BvX9ZmU",{"id":810,"title":811,"author":7,"body":812,"dateModified":179,"datePublished":787,"description":958,"extension":182,"heading":959,"image":960,"imageAlt":818,"keywords":961,"locale":191,"meta":964,"navigation":193,"path":965,"reviewed":193,"seo":966,"sitemap":967,"slug":973,"stem":974,"translationKey":973,"__hash__":975},"blog\u002Fblog\u002Fno\u002Fthe-importance-of-predictable-velocity.md","Forutsigbar hastighet: pålitelige sprintforpliktelser | AELBOX",{"type":9,"value":813,"toc":948},[814,820,823,827,830,833,836,844,848,852,855,859,862,865,872,879,883,887,890,893,896,899,903,906,909,916,920,924,932,935,939,945],[12,815,816],{},[15,817],{"alt":818,"height":18,"loading":19,"src":819,"width":21,"fetchPriority":22},"Planning poker-kort og en stoppeklokke på et salongbord","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,821,822],{},"Forutsigbar hastighet betyr å vite på forhånd hvor mye arbeid et team fullfører i en gitt periode, basert på tilgjengeligheten.",[41,824,826],{"id":825},"problemet-med-svingende-hastighet","Problemet med svingende hastighet",[12,828,829],{},"Når hastigheten varierer mellom sprinter, blir det vanskelig å planlegge en utgivelse. Ingen vet når arbeidet blir levert, og hele Scrum-prosessen bryter sammen. Kaos overtar, og det gjør lite for motivasjonen i teamet.",[12,831,832],{},"Svingende hastighet skjer vanligvis fordi teammedlemmer prøver å gjøre sitt beste og forplikter seg til mer enn de kan levere. I et samarbeidsmiljø med en godt satt opp utviklingsprosess er det mer ved en oppgave enn selve implementeringen. Noen teammedlemmer er heldige og får oppgaver som er relativt enkle å implementere, mens andre støter på et problem ingen hadde forutsett. I én sprint ser hastigheten høy ut fordi teamet fullfører overføringer; i den neste faller den fordi nye overføringer dukker opp.",[12,834,835],{},"Overføringer gir inntrykk av at teamet presterer for dårlig: det kunne gjort mer, men noe uforutsigbart kommer alltid i veien. Ledelsen oppdager problemet, ser de tapte fristene, og spenningen mellom teammedlemmene vokser.",[12,837,838],{},[15,839],{"alt":840,"height":841,"loading":32,"src":842,"width":843,"decoding":34},"Vanlig sprint med overføringer",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,845,846],{},[38,847,840],{},[41,849,851],{"id":850},"de-vanlige-problemene-med-å-holde-hastigheten-forutsigbar","De vanlige problemene med å holde hastigheten forutsigbar",[12,853,854],{},"Problemene varierer fra prosjekt til prosjekt, men mange er felles for alle typer prosjekter. Her er de vanligste, med praktiske løsninger.",[65,856,858],{"id":857},"forvent-det-uventede","Forvent det uventede",[12,860,861],{},"Noen oppgaver krever research før de kan starte. Tenk deg en funksjon som avhenger av et tredjepartsselskap som kanskje ikke svarer når du trenger det. Eller en funksjon som ikke kan implementeres som planlagt fordi teamet misforsto teknologien da oppgaven ble laget.",[12,863,864],{},"Hvis en slik oppgave legges i en sprint uten den nødvendige researchen, tar den sannsynligvis lengre tid enn forventet, og estimatet får skylden. Noen vil hevde at du trenger en spike for å undersøke saken først. Men hvordan vet du hvilke oppgaver som trenger det?",[12,866,867,868,871],{},"Den eneste måten er å ",[49,869,870],{"href":301},"begynne å jobbe med en oppgave på forhånd",". Når du starter før oppgaven er planlagt, er det mulig å finne problemer før de oppstår. Med den tilnærmingen kommer en oppgave først inn i sprinten når den er tydelig og en del av arbeidet allerede er gjort.",[12,873,874],{},[15,875],{"alt":876,"height":841,"loading":32,"src":877,"width":878,"decoding":34},"Sprinter med oppgaver som er startet på forhånd","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,880,881],{},[38,882,876],{},[65,884,886],{"id":885},"unngå-uklare-oppgavebeskrivelser","Unngå uklare oppgavebeskrivelser",[12,888,889],{},"Noen oppgaver ser greie ut for den som laget dem, men utelater viktige detaljer. Enkelte implementeringsdetaljer kan påvirke leveringen alvorlig.",[12,891,892],{},"Forretningsinteressenter kan hevde at oppgavebeskrivelser ikke skal inneholde tekniske detaljer, men de som implementerer, synes ofte at forretningskravene er for vage til å handle på.",[12,894,895],{},"Løsningen er et teknisk designdokument som implementeringsoppgaven viser til. Det gjør det klart nøyaktig hva som skal bygges.",[12,897,898],{},"Det hjelper også å ta med tekniske detaljer i oppgavebeskrivelsen, slik at de som implementerer, vet hva som må gjøres og kan oppdage potensielle problemer tidlig.",[65,900,902],{"id":901},"reduser-kapasiteten-med-fibonacci-sekvensen","Reduser kapasiteten med Fibonacci-sekvensen",[12,904,905],{},"Noen ganger tar teammedlemmer ferie, eller en helligdag faller i sprinten. Opplæring og interne arrangementer reduserer også tilgjengeligheten: tiden teamet kan bruke på prosjektarbeid. Da må kapasiteten reduseres for å gjenspeile de som mangler.",[12,907,908],{},"Hastigheten antas å være konstant, men den beregnes ut fra gjennomsnittshastigheten til alle i teamet. For enkelhets skyld kan du anta at én person fullfører ett story point per dag. Hvis én person mangler én dag, reduserer du sprintens kapasitet med ett story point. Hvis to personer mangler to dager (fire story points), reduserer du kapasiteten med fem story points (neste Fibonacci-tall) i stedet for fire. Hvis to personer mangler tre dager, reduserer du kapasiteten med åtte story points i stedet for seks, for å ta høyde for avhengighetsrisiko.",[12,910,911],{},[15,912],{"alt":913,"height":841,"loading":32,"src":914,"width":915,"decoding":34},"Forplikte seg til mindre kapasitet enn beregnet","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,917,918],{},[38,919,913],{},[65,921,923],{"id":922},"unngå-avhengige-oppgaver","Unngå avhengige oppgaver",[12,925,926,927,931],{},"Ofte fullfører én person en oppgave som en annen teammedlems oppgave avhenger av. Det skaper ",[49,928,930],{"href":929},"\u002Fno\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","avhengigheter i teamet eller mellom team",". Hvis den første oppgaven er forsinket, forskyves alle avhengige oppgaver. Teammedlemmer blir sittende ledige, og så haster de når avhengigheten er løst, og kaster bort verdifull tid.",[12,933,934],{},"Avhengige oppgaver kan starte tidligere, slik at de kritiske oppgavene oppstrøms nesten er ferdige til neste sprint. Det reduserer avhengighetens innvirkning på hastigheten i inneværende sprint.",[65,936,938],{"id":937},"estimer-ærlig","Estimer ærlig",[12,940,941,944],{},[49,942,943],{"href":287},"Å estimere oppgaver ærlig"," er vanskelig og krever hele teamets oppmerksomhet. Alle bør estimere uten å bli påvirket av andres estimater. Bare ærlige estimater viser hvor lang tid et epos virkelig tar, og holder utgivelsesdatoene realistiske.",[12,946,947],{},"Forutsigbar hastighet er ikke et verktøy eller et måltall du påtvinger et team; det er resultatet av å fjerne overraskelser én etter én. Start med de fem grepene over, og utgivelsesdatoen slutter å være en gjetning.",{"title":159,"searchDepth":160,"depth":160,"links":949},[950,951],{"id":825,"depth":160,"text":826},{"id":850,"depth":160,"text":851,"children":952},[953,954,955,956,957],{"id":857,"depth":166,"text":858},{"id":885,"depth":166,"text":886},{"id":901,"depth":166,"text":902},{"id":922,"depth":166,"text":923},{"id":937,"depth":166,"text":938},"Hvorfor hastigheten svinger mellom sprinter, og hvordan forpliktelsene kan bli forutsigbare: fem praktiske grep for planlegging, kapasitet og avhengigheter.","Hvorfor forutsigbar hastighet er viktig","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[962,793,495,492,963],"forutsigbar hastighet","utgivelsesplanlegging",{},"\u002Fblog\u002Fno\u002Fthe-importance-of-predictable-velocity",{"title":811,"description":958},{"loc":965,"images":968,"lastmod":179},[969,970,971,972],{"loc":819},{"loc":842},{"loc":877},{"loc":914},"the-importance-of-predictable-velocity","blog\u002Fno\u002Fthe-importance-of-predictable-velocity","HMJdc2cGKL_o_fpTKtkmgzRZWhoutU0aGoiXbELpMjI",1795345550679]