[{"data":1,"prerenderedAt":975},["ShallowReactive",2],{"blog-index-nl":3},[4,203,345,509,605,808],{"id":5,"title":6,"author":7,"body":8,"dateModified":178,"datePublished":179,"description":180,"extension":181,"heading":182,"image":183,"imageAlt":17,"keywords":184,"locale":190,"meta":191,"navigation":192,"path":193,"reviewed":192,"seo":194,"sitemap":195,"slug":200,"stem":201,"translationKey":200,"__hash__":202},"blog\u002Fblog\u002Fnl\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Sprintafhankelijkheden en gekoppelde pull requests | AELBOX","AELBOX",{"type":9,"value":10,"toc":157},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,105,109,112,116,119,123,126,130,133,137,140,144,147,151,154],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Een metalen ketting, planning-pokerkaarten en een koffiekopje op een tafel",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Sprints bevatten vaak afhankelijke werkitems, binnen één team of tussen meerdere Scrum-teams. In een perfecte wereld zouden afhankelijkheden niet bestaan; in de praktijk wint de businessbehoefte en worden afhankelijkheden toegevoegd om de releasecyclus te verkorten. Dit artikel beschrijft één manier om afhankelijke taken in softwareteams te beheren.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Afhankelijkheden tussen taken",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"de-ouderwetse-aanpak","De ouderwetse aanpak",[12,46,47,48,53],{},"De rechttoe-rechtaan aanpak is een taak starten zodra de afhankelijkheid ervan in de hoofdbranch is gemerged. Bij die aanpak zitten sommige teamleden niets te doen tot een taak klaar is. Uiteindelijk blijft er weinig of geen tijd over voor de resterende afhankelijke taken. De laatste taken schuiven door, en ",[49,50,52],"a",{"href":51},"\u002Fnl\u002Fblog\u002Fcomparison-metrics-for-agile-teams","het team is ontevreden",".",[12,55,56],{},"Waarom gebeurt dit terwijl de capaciteit correct is geschat? Meestal door wachttijd terwijl collega's iets afronden. Zelfs kleine vertragingen lopen op, vooral in korte sprints.",[41,58,60],{"id":59},"gelijktijdig-aan-afhankelijke-taken-werken","Gelijktijdig aan afhankelijke taken werken",[12,62,63],{},"Er is een manier om dit te doen met een kleine extra inspanning. Als teamleden gelijktijdig aan taken werken, heeft dat verschillende voordelen.",[65,66,68],"h3",{"id":67},"betere-samenwerking","Betere samenwerking",[12,70,71],{},"Als teamleden gelijktijdig aan afhankelijke taken werken, lijkt het op pair programming. De één moet de bovenliggende taak begrijpen; de ander de afhankelijke taak. Het team krijgt bredere kennis van de problemen die worden opgelost.",[65,73,75],{"id":74},"wachten-voorkomen","Wachten voorkomen",[12,77,78],{},"Als taken gelijktijdig lopen, wacht niemand tot een oplossing landt. Iedereen kan meteen aan de slag, met meer ad-hoc overleg zodra er vragen opkomen.",[65,80,82],{"id":81},"pull-requests-eerder-klaar-voor-codereview","Pull requests eerder klaar voor codereview",[12,84,85],{},"Als je branch op de branch van een collega is gebaseerd, is het goedkeuren van de oorspronkelijke pull request makkelijker. Je begrijpt al hoe het bovenliggende werkitem is geïmplementeerd, en de oorspronkelijke branch is tijdens de implementatie getest en gereviewd. Het is geen onbekend terrein meer.",[41,87,89],{"id":88},"werken-met-gekoppelde-gestapelde-pull-requests","Werken met gekoppelde (gestapelde) pull requests",[12,91,92],{},"Deze mate van gelijktijdigheid vraagt om de juiste tooling. Met versiebeheer op basis van Git is het eenvoudig. De stappen hieronder beschrijven het proces.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Afhankelijkheidsboom (zes afhankelijke taken tegelijk aanpakken)",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,97],{},[65,106,108],{"id":107},"breng-de-afhankelijkheden-duidelijk-in-kaart","Breng de afhankelijkheden duidelijk in kaart",[12,110,111],{},"Bepaal de afhankelijkheidsketen tijdens de sprintplanning. De keten van pull requests volgt die definitie vervolgens precies. De keten halverwege de ontwikkeling wijzigen is duur vanwege rebasen.",[65,113,115],{"id":114},"begin-met-de-basistaken","Begin met de basistaken",[12,117,118],{},"Elke afhankelijkheidsketen heeft basistaken die van niets anders afhangen. Daar kun je op dag één mee beginnen.",[65,120,122],{"id":121},"begin-met-de-kern-van-de-implementatie","Begin met de kern van de implementatie",[12,124,125],{},"Dit kan botsen met test-driven development, waarbij tests eerst komen. Om de keten van pull requests behapbaar te houden, implementeer je eerst de kern. Zo krijgen afhankelijke teamleden eerder toegang.",[65,127,129],{"id":128},"orden-en-review-in-een-fifo-wachtrij","Orden en review in een FIFO-wachtrij",[12,131,132],{},"De eerst aangemaakte branch moet als eerste worden gereviewd en gemerged. Elke merge start CI; breekt daardoor de main-build, dan wordt het probleem opgelost terwijl het nog klein is.",[41,134,136],{"id":135},"de-extra-inspanning","De extra inspanning",[12,138,139],{},"Een keten van afhankelijke branches onderhouden heeft voordelen, maar ook nadelen.",[65,141,143],{"id":142},"rebasen-of-mergen","Rebasen of mergen",[12,145,146],{},"De keten moet synchroon blijven, en dat kost moeite. Moderne tools bieden synchronisatie met de basisbranch met één klik wanneer er geen conflicten zijn. Gebruik dat op verzoek, wanneer het veilig is om wijzigingen stroomopwaarts binnen te halen. Is de build groen en werkt de feature, synchroniseer dan.",[65,148,150],{"id":149},"samenwerking","Samenwerking",[12,152,153],{},"Een afhankelijkheidsketen vraagt om een samenwerkend team waarvan de leden met elkaar willen praten. Het werkt niet als mensen geïsoleerd werken.",[12,155,156],{},"Afhankelijke werkitems kun je het beste buiten de huidige sprint houden. Als de businessbehoefte vereist dat ze parallel lopen, is een keten van afgeleide branches een praktische manier om de afhankelijkheidslast te beheren.",{"title":158,"searchDepth":159,"depth":159,"links":160},"",2,[161,162,168,174],{"id":43,"depth":159,"text":44},{"id":59,"depth":159,"text":60,"children":163},[164,166,167],{"id":67,"depth":165,"text":68},3,{"id":74,"depth":165,"text":75},{"id":81,"depth":165,"text":82},{"id":88,"depth":159,"text":89,"children":169},[170,171,172,173],{"id":107,"depth":165,"text":108},{"id":114,"depth":165,"text":115},{"id":121,"depth":165,"text":122},{"id":128,"depth":165,"text":129},{"id":135,"depth":159,"text":136,"children":175},[176,177],{"id":142,"depth":165,"text":143},{"id":149,"depth":165,"text":150},"2026-11-21","2018-05-27","Afhankelijke werkitems leggen een sprint stil terwijl mensen wachten. Zo houden gestapelde pull requests het werk in beweging en beperk je de wachttijd.","md","Sprintafhankelijkheden beheren met gekoppelde pull requests","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[185,186,187,188,189],"sprintafhankelijkheden","gestapelde pull requests","gekoppelde pull requests","codereview","agile oplevering","nl",{},true,"\u002Fblog\u002Fnl\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":180},{"loc":193,"images":196,"lastmod":178},[197,198,199],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fnl\u002Fmanage-sprint-dependencies-with-chained-pull-requests","KsurOL937k0MZ9u60AJ9i4z-r0CCI1rhjyHxmG8CGeQ",{"id":204,"title":205,"author":7,"body":206,"dateModified":178,"datePublished":324,"description":325,"extension":181,"heading":326,"image":327,"imageAlt":212,"keywords":328,"locale":190,"meta":334,"navigation":192,"path":335,"reviewed":192,"seo":336,"sitemap":337,"slug":342,"stem":343,"translationKey":342,"__hash__":344},"blog\u002Fblog\u002Fnl\u002Fcomparison-metrics-for-agile-teams.md","Vergelijkingsmaatstaven voor agile teams | AELBOX",{"type":9,"value":207,"toc":315},[208,215,218,222,225,233,237,241,244,248,251,259,263,271,275,278,281,288,292,295,302,305,309,312],[12,209,210],{},[15,211],{"alt":212,"height":213,"loading":19,"src":214,"width":21,"fetchPriority":22},"Een liniaal, planning-pokerkaarten en een koffiekopje op een tafel",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,216,217],{},"Agile teams vergelijken is lastig, en het is de moeite waard om je af te vragen waarom we dat eigenlijk doen. Hoe helpt het vergelijken van teams in verschillende domeinen echt?",[41,219,221],{"id":220},"een-gezonde-competitie-creëren","Een gezonde competitie creëren",[12,223,224],{},"Teams zouden niet op willekeurige maatstaven tegen elkaar gerangschikt moeten worden. Dat demotiveert alleen maar. In plaats daarvan moeten maatstaven elk team een gelijke kans geven om te concurreren. Prestaties verbeteren dan omdat teams het zelf willen, niet omdat iemand aandringt.",[12,226,227],{},[15,228],{"alt":229,"height":230,"loading":32,"src":231,"width":232,"decoding":34},"Creëer een competitie",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,234,235],{},[38,236,229],{},[41,238,240],{"id":239},"maatstaven-die-gelijke-kansen-creëren","Maatstaven die gelijke kansen creëren",[12,242,243],{},"Hier zijn vier basismaatstaven om teams te vergelijken. Ze meten hoe goed elk team kan concurreren op gelijke voet, niets meer. Vergelijkbare maatstaven creëren gelijke kansen.",[65,245,247],{"id":246},"geslaagde-sprints","Geslaagde sprints",[12,249,250],{},"Als een sprint alleen een tijdsperiode was, zou hij nergens toe dienen. Een sprint is een mijlpaal en heeft een doel nodig. Het sprintdoel (de belangrijkste set user stories) is de grotere mijlpaal; elke user story afronden is de kleinere. Houd aan het einde van elke sprint een demo over teamgrenzen heen, waar teams laten zien wat ze hebben opgeleverd. Die gezonde competitie moedigt teams aan hun sprintdoelen te halen. Mensen hebben een zichtbaar doel nodig om gemotiveerd te zijn.",[12,252,253],{},[15,254],{"alt":255,"height":256,"loading":32,"src":257,"width":258,"decoding":34},"Naar een doel sprinten",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,260,261],{},[38,262,255],{},[12,264,265,266,270],{},"Kan dit een spel van te veel en te weinig toezeggen worden? Zegt een team te weinig toe, dan maakt de demo dat duidelijk: er is minder te laten zien. Zegt het te veel toe, dan wordt de demo ",[267,268,269],"strong",{},"weer een mislukte sprint",". Opleveren wat het team heeft toegezegd, geeft de motivatie om meer te doen. Teams voelen voldoening over het werk.",[65,272,274],{"id":273},"stabiele-snelheid-en-eerlijk-schatten","Stabiele snelheid en eerlijk schatten",[12,276,277],{},"Dit is kenniswerk, geen lopende-bandwerk. Als niemand in het team een probleem goed genoeg begrijpt om de oplossing te schatten, is het probleem niet vooraf onderzocht.",[12,279,280],{},"Een tijdgebonden spike in de vorige sprint, gevolgd door een teamreview van de bevindingen, maakt het makkelijk om de implementatie op te splitsen in kleinere user stories en die goed te schatten. Schrijf voor complex werk een uitgebreider technisch ontwerpdocument dat de user stories voor de implementatie opsomt.",[12,282,283,284,53],{},"De spike en het ontwerpwerk zijn zelf user stories die je kunt schatten. De sleutel is de structuur en volgorde van het werk voor een complexe oplossing te bepalen. In plaats van je vast te leggen op een user story die het team niet begrijpt, maak je een onderzoekstaak om de leemte te vullen. Dan is de schatting ",[49,285,287],{"href":286},"\u002Fnl\u002Fblog\u002Fsheepherding-story-points","gebaseerd op bewijs",[65,289,291],{"id":290},"voorspelbare-capaciteit-onverwacht-werk-voorkomen","Voorspelbare capaciteit (onverwacht werk voorkomen)",[12,293,294],{},"Onderzoek komt eerst, implementatie volgt. Terwijl onderzoek problemen blootlegt, worden nieuwe werkitems aangemaakt en geschat. Daarna heb je een veel duidelijker beeld van de volgende sprint. Bekend werk kun je schatten en plannen; onbekend werk krijgt eerst een tijdgebonden onderzoekstaak voordat het wordt geschat. De discipline is groot werk opsplitsen in kleine, schatbare stukken.",[12,296,297,298,53],{},"Complex werk kan vroeg beginnen, al is het maar om te ontdekken dat het zijn eigen set user stories nodig heeft. Dat verkleint nog steeds het ",[49,299,301],{"href":300},"\u002Fnl\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","risico van het onbekende",[12,303,304],{},"Support en brandjes blussen in productie lopen meestal in een tijdgebonden Kanban-flow buiten de sprint. Daar worden tijd tot eerste reactie en SLA-schendingen de vergelijkingsmaatstaven.",[65,306,308],{"id":307},"beschikbaarheid-van-het-team-tijd-aan-taken-gedeeld-door-de-totale-tijd-in-een-sprint","Beschikbaarheid van het team (tijd aan taken gedeeld door de totale tijd in een sprint)",[12,310,311],{},"Beschikbaarheid is het deel van de tijd dat teamleden aan geschat werk besteden. Wordt een team vaker dan andere in trainingen, kennisdeling of ander intern werk getrokken, herstel dan de balans. De enige manier om de snelheid stabiel te houden, is de beschikbaarheid stabiel houden. Als de beschikbaarheid tussen teams gelijk is, werken de andere vergelijkingsmaatstaven.",[12,313,314],{},"Teams vergelijken gaat niet om het afstraffen van zwakke prestaties, maar om het vergroten van de motivatie en de zin om te concurreren en meer op te leveren. Daarom moeten die maatstaven niet zichtbaar zijn voor individuele teamleden: het is een instrument voor coaching, geen openbare ranglijst. Door deze maatstaven te volgen en Scrum Masters indirect te sturen, geef je teams een gelijk speelveld om te concurreren.",{"title":158,"searchDepth":159,"depth":159,"links":316},[317,318],{"id":220,"depth":159,"text":221},{"id":239,"depth":159,"text":240,"children":319},[320,321,322,323],{"id":246,"depth":165,"text":247},{"id":273,"depth":165,"text":274},{"id":290,"depth":165,"text":291},{"id":307,"depth":165,"text":308},"2018-05-04","Maatstaven horen een gelijk speelveld te creëren, geen ranglijst. Vier vergelijkingsmaatstaven die agile teams motiveren in plaats van afstraffen.","Vergelijkingsmaatstaven voor agile teams","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[329,330,331,332,333],"agile maatstaven","teamsnelheid","agile teams","scrum","capaciteit",{},"\u002Fblog\u002Fnl\u002Fcomparison-metrics-for-agile-teams",{"title":205,"description":325},{"loc":335,"images":338,"lastmod":178},[339,340,341],{"loc":214},{"loc":231},{"loc":257},"comparison-metrics-for-agile-teams","blog\u002Fnl\u002Fcomparison-metrics-for-agile-teams","tZOi4sVDbISEBRgLDnWf0SPwSelq7sGz0hUbG21dlyA",{"id":346,"title":347,"author":7,"body":348,"dateModified":178,"datePublished":486,"description":487,"extension":181,"heading":488,"image":489,"imageAlt":354,"keywords":490,"locale":190,"meta":495,"navigation":192,"path":496,"reviewed":192,"seo":497,"sitemap":498,"slug":506,"stem":507,"translationKey":506,"__hash__":508},"blog\u002Fblog\u002Fnl\u002Fsheepherding-story-points.md","Schaapeffect bij storypoints: verankering | AELBOX",{"type":9,"value":349,"toc":477},[350,356,359,363,370,378,382,386,389,392,399,403,406,410,413,418,422,426,429,436,440,444,447,452,456,460,471,474],[12,351,352],{},[15,353],{"alt":354,"height":18,"loading":19,"src":355,"width":21,"fetchPriority":22},"Een kudde schapen en planning-pokerkaarten op een salontafel","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,357,358],{},"Storypoints schatten wordt vaak verwaarloosd of gedaan in chatrooms en open vergaderingen waar iedereen elke stem kan zien of horen. Weten hoe anderen hebben gestemd vertekent de uitkomst en levert onnauwkeurige schattingen op. Herhaalde onnauwkeurige schattingen leiden tot slechte plannen en vertraagde of geannuleerde opleveringen. Dit gebeurt er bij een open stemming.",[41,360,362],{"id":361},"de-karakters-in-een-stemronde","De karakters in een stemronde",[12,364,365,366,369],{},"In een open stemronde duiken verschillende karakters op. De schatting hangt af van wie eerst gaat, en die is meestal verre van eerlijk. Waarom maakt de volgorde zoveel uit bij een open stemming? Door het ",[267,367,368],{},"schaapeffect",": het verankeringseffect waardoor andere teamleden de eerste schatting kopiëren.",[12,371,372],{},[15,373],{"alt":374,"height":375,"loading":32,"src":376,"width":377,"decoding":34},"Het schaapeffect",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,379,380],{},[38,381,374],{},[65,383,385],{"id":384},"de-overmoedige-stemmer","De overmoedige stemmer",[12,387,388],{},"Elk team heeft minstens één lid dat denkt het systeem het beste te kennen. Diegene stemt meestal eerst, omdat de antwoorden vanzelfsprekend lijken. Daarbij worden vaak details over het hoofd gezien die de schatting kunnen ondermijnen. Die details kun je vooraf boven tafel krijgen, maar alleen als iemand een gesprek op gang brengt. Dat kan niet bij een open stemming.",[12,390,391],{},"Deze persoon stemt meestal lager dan de eerlijke schatting. Misschien kan alleen hij of zij de user story zo snel afronden, en dan nog met geluk.",[12,393,394],{},[15,395],{"alt":385,"height":396,"loading":32,"src":397,"width":398,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,400,401],{},[38,402,385],{},[12,404,405],{},"Alle anderen volgen, dus de taak lijkt makkelijk en door iedereen binnen de gestelde tijd te doen. In de praktijk doet meestal iemand anders hem.",[65,407,409],{"id":408},"de-stille-stemmer","De stille stemmer",[12,411,412],{},"Er is meestal meer dan één stille stemmer, en ze durven niet als eerste te stemmen. Ze wachten tot iemand anders stemt, zodat ze die kunnen kopiëren. Ze mengen zich zelden in de discussie en antwoorden alleen als het gevraagd wordt. Ze stemmen als tweede, net voor de onverschillige stemmers.",[12,414,415],{},[15,416],{"alt":409,"height":396,"loading":32,"src":417,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,419,420],{},[38,421,409],{},[65,423,425],{"id":424},"de-onverschillige-stemmer","De onverschillige stemmer",[12,427,428],{},"Ze zijn tijdens de implementatie moeilijk te peilen, maar hun gedrag is overduidelijk bij het stemmen. Ze stemmen altijd als laatste en kopiëren de schatting van iemand anders. Verschillen de schattingen, dan kiezen ze de meest voorkomende. Ze willen niet uitleggen waarom ze een lager of hoger getal kozen, dus ze vermijden samenwerking tijdens refinement en ontwijken vragen.",[12,430,431],{},[15,432],{"alt":425,"height":433,"loading":32,"src":434,"width":435,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,437,438],{},[38,439,425],{},[65,441,443],{"id":442},"de-vermoeide-stemmer","De vermoeide stemmer",[12,445,446],{},"Sommige teamleden kunnen zich niet lang concentreren en missen belangrijke delen van de discussie. Ze raken de context kwijt en gokken of zoeken de meest voorkomende stem om te kopiëren.",[12,448,449],{},[15,450],{"alt":443,"height":396,"loading":32,"src":451,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,453,454],{},[38,455,443],{},[41,457,459],{"id":458},"hoe-je-de-aandacht-vasthoudt-tijdens-het-schatten","Hoe je de aandacht vasthoudt tijdens het schatten",[12,461,462,463,467,468,470],{},"Schatten is belangrijk, want alleen eerlijke storypoints kunnen ",[49,464,466],{"href":465},"\u002Fnl\u002Fblog\u002Fcorrectly-estimating-release-deadline","een project op koers naar de releasedatum houden",". De sleutel tot eerlijk schatten is het ",[267,469,368],{}," tegengaan, of je nu papieren kaarten of software gebruikt.",[12,472,473],{},"Teamleden mogen elkaars schattingen nooit zien voordat de moderator ze onthult. Zo gaat de stille stemmer nadenken, raakt de onverschillige stemmer betrokken en wordt de vermoeide stemmer wakker. De beste vraag, vooral wanneer iemand het oneens is met de groep, is: \"Waarom heb je X storypoints gestemd?\" Dat start een gesprek over de echte implementatieproblemen. Gesloten vragen zoals \"Ben je het eens met X storypoints?\" lokken een betekenisloos \"ja\" uit.",[12,475,476],{},"Een goede schattingstool maakt refinement boeiender en houdt iedereen alert en klaar om te discussiëren, zodat zelfs complexe user stories betere schattingen krijgen.",{"title":158,"searchDepth":159,"depth":159,"links":478},[479,485],{"id":361,"depth":159,"text":362,"children":480},[481,482,483,484],{"id":384,"depth":165,"text":385},{"id":408,"depth":165,"text":409},{"id":424,"depth":165,"text":425},{"id":442,"depth":165,"text":443},{"id":458,"depth":159,"text":459},"2018-04-30","Open stemmen laten de eerste schatting de ruimte bepalen. Zo beïnvloedt het schaapeffect je storypoints en zo houd je planning poker eerlijk.","Het schaapeffect bij storypoints","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[491,492,493,368,494],"storypoints","planning poker","verankeringseffect","agile schatten",{},"\u002Fblog\u002Fnl\u002Fsheepherding-story-points",{"title":347,"description":487},{"loc":496,"images":499,"lastmod":178},[500,501,502,503,504,505],{"loc":355},{"loc":376},{"loc":397},{"loc":417},{"loc":434},{"loc":451},"sheepherding-story-points","blog\u002Fnl\u002Fsheepherding-story-points","x8b8VU6J7eNPo2xVJjZdSlQWQ-ax12yFCGFMEylLZ5Y",{"id":510,"title":511,"author":7,"body":512,"dateModified":178,"datePublished":585,"description":586,"extension":181,"heading":587,"image":588,"imageAlt":518,"keywords":589,"locale":190,"meta":594,"navigation":192,"path":595,"reviewed":192,"seo":596,"sitemap":597,"slug":602,"stem":603,"translationKey":602,"__hash__":604},"blog\u002Fblog\u002Fnl\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","De 10%-Scrumbanregel voor elke sprint | AELBOX",{"type":9,"value":513,"toc":580},[514,521,529,533,536,544,548,552,555,559,562,565,573,577],[12,515,516],{},[15,517],{"alt":518,"height":519,"loading":19,"src":520,"width":21,"fetchPriority":22},"Planning-pokerkaarten en een Kanban-bord op een salontafel",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,522,523,524,528],{},"Veel teams plannen precies de capaciteit die in hun Jira-plan staat. Dat is vaak een fout en leidt tot mislukte sprints. Waarom gebeurt dat terwijl de ",[49,525,527],{"href":526},"\u002Fnl\u002Fblog\u002Fthe-importance-of-predictable-velocity","capaciteitsberekeningen"," zo precies lijken?",[41,530,532],{"id":531},"de-drang-om-meer-op-te-leveren","De drang om meer op te leveren",[12,534,535],{},"Product Owners dringen na elke geslaagde sprint aan op een hogere snelheid, een natuurlijke reactie op de laatste resultaten. Heeft het team vorige sprint een bepaald aantal storypoints afgerond, dan wordt verwacht dat het er volgende sprint meer doet. Dat herhaalt zich tot een sprint mislukt. De druk is een poging om de grenzen van het team te testen. In onze ervaring werkt het averechts. Het demotiveert het team uiteindelijk, dat elke volgende sprint als gedoemd gaat zien.",[12,537,538],{},[15,539],{"alt":540,"height":541,"loading":32,"src":542,"width":543,"decoding":34},"De gedoemde sprint",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,545,546],{},[38,547,540],{},[41,549,551],{"id":550},"de-hectiek-aan-het-einde-van-een-sprint-onder-leveringsdruk","De hectiek aan het einde van een sprint onder leveringsdruk",[12,553,554],{},"Als de capaciteit precies de sprint vult, zorgt elke vertraging of elk werkelijk geworden risico voor druk om aan het einde in hoog tempo te werken. Het team levert dan minder op dan beloofd, omdat stress de overhand neemt. Die eindspurt moet je wegnemen.",[41,556,558],{"id":557},"laat-het-team-uit-eigen-beweging-meer-opleveren","Laat het team uit eigen beweging meer opleveren",[12,560,561],{},"Plan slechts 90% van de capaciteit van het team en houd de resterende 10% vrij voor onvoorzien backlogwerk. Die taken worden tijdens de sprint op Scrumban-manier uit de backlog gehaald. De buffer vangt risico op en laat het team de sprint (of in ieder geval het sprintdoel) een paar dagen eerder afronden. Bedreigt een externe afhankelijkheid de sprint, dan kan een taak uit de buffer de problematische taak vervangen.",[12,563,564],{},"Die 10% hoort niet bij de sprintafspraak. Doet het risico zich niet voor, dan levert het team het als extra werk op; gaat er iets mis, dan wordt de buffer gebruikt, maar het sprintdoel en de afspraak blijven staan. Houd bij hoeveel van de buffer wordt gebruikt: komt die regelmatig op 20% uit, dan is het tijd om de snelheid van het team met 10% te verhogen en de buffer van 10% te behouden.",[12,566,567],{},[15,568],{"alt":569,"height":570,"loading":32,"src":571,"width":572,"decoding":34},"Lever eerder op, lever extra op",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,574,575],{},[38,576,569],{},[12,578,579],{},"Onze ervaring leert dat medewerkers juist dan zonder druk werken en het meest bijdragen. De snelheid kan dan in het tempo van het team zelf stijgen, zonder druk van buiten en met minder stress. Die stijging voelt natuurlijk en houdbaar.",{"title":158,"searchDepth":159,"depth":159,"links":581},[582,583,584],{"id":531,"depth":159,"text":532},{"id":550,"depth":159,"text":551},{"id":557,"depth":159,"text":558},"2018-04-28","Volle capaciteit inplannen maakt elke sprint kwetsbaar. Een Scrumban-buffer van 10% vangt risico op, beschermt het sprintdoel en laat de snelheid natuurlijk groeien.","De 10%-Scrumbanregel voor elke sprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[590,591,592,593,332],"scrumban","sprintcapaciteit","agile buffer","snelheid",{},"\u002Fblog\u002Fnl\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":511,"description":586},{"loc":595,"images":598,"lastmod":178},[599,600,601],{"loc":520},{"loc":542},{"loc":571},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fnl\u002Fthe-10-percent-scrumban-rule-for-every-sprint","jPBbKYH2P_a_ILIxFVxsxx_xTRxFW4OKeIljEI3liUk",{"id":606,"title":607,"author":7,"body":608,"dateModified":178,"datePublished":786,"description":787,"extension":181,"heading":788,"image":789,"imageAlt":614,"keywords":790,"locale":190,"meta":794,"navigation":192,"path":795,"reviewed":192,"seo":796,"sitemap":797,"slug":805,"stem":806,"translationKey":805,"__hash__":807},"blog\u002Fblog\u002Fnl\u002Fcorrectly-estimating-release-deadline.md","Hoe je een releasedatum schat met storypoints | AELBOX",{"type":9,"value":609,"toc":772},[610,616,619,623,630,634,637,645,649,653,656,659,663,666,674,679,683,686,690,693,697,700,707,712,716,719,723,726,734,738,742,745,750,757,765,769],[12,611,612],{},[15,613],{"alt":614,"height":18,"loading":19,"src":615,"width":21,"fetchPriority":22},"Planning-pokerkaarten, een Gantt-diagram en een koffiekopje op een tafel","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,617,618],{},"Een belangrijk onderdeel van projectmanagement is het schatten van de releasedatum van een project. Maar hoe voorspel je wanneer een groot, complex systeem wordt opgeleverd?",[41,620,622],{"id":621},"de-problemen-bij-het-schatten","De problemen bij het schatten",[12,624,625,626,629],{},"Om op tijd op te leveren heb je een betrouwbare schatting van het werk nodig. ",[49,627,628],{"href":526},"Taken schatten is meestal moeilijk",", vooral wanneer je je voor elke taak moet vastleggen op een schatting in tijd. Psychologisch is het lastig om je aan een oplevertijd te binden, en die toezeggingen gaan vaak mis.",[65,631,633],{"id":632},"het-probleem-met-tijd","Het probleem met tijd",[12,635,636],{},"Tijd schatten is om een simpele reden problematisch: hoe complexer de taak, hoe groter de kans dat de deadline wordt gemist. Het hangt er ook van af wie de taak oppakt. Teamleden werken in verschillend tempo en leveren verschillende hoeveelheden werk op. Omdat de beschikbaarheid verandert door vakanties en trainingen, kan een taak die door het snelste teamlid is geschat bij het langzaamste terechtkomen. Het nette Gantt-diagram verandert in een rommel: taken raken achterstallig en managers maken zich voortdurend zorgen of het project op tijd klaar is.",[12,638,639],{},[15,640],{"alt":641,"height":642,"loading":32,"src":643,"width":644,"decoding":34},"Een Gantt-diagram dat in de soep loopt",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,646,647],{},[38,648,641],{},[65,650,652],{"id":651},"de-weerstand-tegen-tijdschattingen","De weerstand tegen tijdschattingen",[12,654,655],{},"Wanneer je wie bouwt om een schatting vraagt, is er vaak weerstand: als de schatting niet klopt, wie krijgt dan de schuld? En als een taak die door de ene persoon is geschat bij iemand anders terechtkomt, wie krijgt dan de schuld als de werkelijke tijd anders uitvalt?",[12,657,658],{},"Het resultaat is terughoudendheid om überhaupt te schatten, waardoor het voor het management moeilijk wordt om opleverdata goed te bepalen.",[41,660,662],{"id":661},"werken-met-storypoints","Werken met storypoints",[12,664,665],{},"Storypoints zijn een alternatief voor schattingen in tijd. Een storypoint is geen vaste eenheid van werk; het is een relatieve schatting die exponentieel groeit. Het hele team schat samen tijdens refinement.",[12,667,668],{},[15,669],{"alt":670,"height":671,"loading":32,"src":672,"width":673,"decoding":34},"Voorbeeld van storypoints",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,675,676],{},[38,677,678],{},"Voorbeeldschattingen",[65,680,682],{"id":681},"verantwoordelijkheid-delen","Verantwoordelijkheid delen",[12,684,685],{},"Met storypoints schat het hele team elke taak. De schatting wordt geaccepteerd als iedereen het erover eens is. Dat voorkomt discussies achteraf over wie de taak heeft geschat en hoe lang die echt duurde. Het team was het vooraf eens, dus de verantwoordelijkheid is gedeeld.",[65,687,689],{"id":688},"complexiteit-schatten","Complexiteit schatten",[12,691,692],{},"Storypoints vangen de complexiteit van een taak, inclusief externe afhankelijkheden en het risico dat er iets misgaat. Omdat ze geen toezegging zijn op een fysieke maatstaf als tijd, zijn ze makkelijker te geven voor het team.",[65,694,696],{"id":695},"de-kleinste-schatting","De kleinste schatting",[12,698,699],{},"Omdat storypoints relatief zijn, heb je een anker nodig als startpunt. Het anker is de kleinste eenheid van werk waarvoor enige implementatie-inspanning nodig is. Het is de kleinste hoeveelheid werk die het team kan schatten.",[12,701,702],{},[15,703],{"alt":696,"height":704,"loading":32,"src":705,"width":706,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,708,709],{},[38,710,711],{},"De laagste schatting",[65,713,715],{"id":714},"de-grootste-schatting","De grootste schatting",[12,717,718],{},"Storypoints groeien exponentieel om te laten zien dat een complexere taak moeilijker te schatten is. De schaal kan tot oneindig (∞) doorlopen, al wordt die schatting zelden gebruikt. De grootste schatting moet het meeste werk zijn dat één persoon gemiddeld in een sprint kan afronden. De lengte van de sprint moet zelf passen bij de grootste hoeveelheid werk die één persoon aankan zonder de controle over de taak te verliezen.",[65,720,722],{"id":721},"user-stories-die-groter-zijn-dan-de-grootste-schatting","User stories die groter zijn dan de grootste schatting",[12,724,725],{},"Sommige taken krijgen meer storypoints dan één persoon in een sprint kan afronden. Ze in een sprint stoppen leidt tot doorgeschoven werk. Daardoor voelt de sprint onvolledig en het werk onaf. Taken die boven die grens zijn geschat, moeten worden opgesplitst in kleinere eenheden en opnieuw worden geschat.",[12,727,728],{},[15,729],{"alt":730,"height":731,"loading":32,"src":732,"width":733,"decoding":34},"13 storypoints opsplitsen",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,735,736],{},[38,737,730],{},[41,739,741],{"id":740},"snelheid-in-storypoints","Snelheid in storypoints",[12,743,744],{},"Snelheid is het gemiddelde aantal storypoints dat een team in een sprint afrondt bij volledige beschikbaarheid. Beschikbaarheid is het deel van de sprint dat het team echt aan projectwerk kan besteden, na vakanties, trainingen en support. Capaciteit is snelheid maal beschikbaarheid.",[12,746,747],{},[38,748,749],{},"capaciteit = snelheid × beschikbaarheid",[12,751,752,753,756],{},"Omdat capaciteit in storypoints wordt uitgedrukt, kun je die omrekenen naar tijd met de verhouding tussen storypoints en tijd van het team. Als ",[49,754,755],{"href":526},"de snelheid voorspelbaar is",", is de releasedatum precies te schatten. Op basis van storypoints en sprints is het resulterende Gantt-diagram stabiel en voorspelbaar:",[12,758,759],{},[15,760],{"alt":761,"height":762,"loading":32,"src":763,"width":764,"decoding":34},"Een stabiel Gantt-diagram",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,766,767],{},[38,768,761],{},[12,770,771],{},"Dat is de omslag: zodra de snelheid stabiel is, wordt de releasedatum een berekening in plaats van een gok.",{"title":158,"searchDepth":159,"depth":159,"links":773},[774,778,785],{"id":621,"depth":159,"text":622,"children":775},[776,777],{"id":632,"depth":165,"text":633},{"id":651,"depth":165,"text":652},{"id":661,"depth":159,"text":662,"children":779},[780,781,782,783,784],{"id":681,"depth":165,"text":682},{"id":688,"depth":165,"text":689},{"id":695,"depth":165,"text":696},{"id":714,"depth":165,"text":715},{"id":721,"depth":165,"text":722},{"id":740,"depth":159,"text":741},"2018-04-14","Tijdschattingen lopen mis zodra complexiteit en beschikbaarheid verschuiven. Zo maken storypoints, gedeelde schattingen en snelheid releasedata voorspelbaar.","Hoe je een releasedatum schat","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[791,491,494,792,793],"releasedatum","sprintsnelheid","capaciteitsplanning",{},"\u002Fblog\u002Fnl\u002Fcorrectly-estimating-release-deadline",{"title":607,"description":787},{"loc":795,"images":798,"lastmod":178},[799,800,801,802,803,804],{"loc":615},{"loc":643},{"loc":672},{"loc":705},{"loc":732},{"loc":763},"correctly-estimating-release-deadline","blog\u002Fnl\u002Fcorrectly-estimating-release-deadline","j5yXgangwe9Lznejpu8cLjTBbQa7QRYbLOlQE4uWUt0",{"id":809,"title":810,"author":7,"body":811,"dateModified":178,"datePublished":786,"description":957,"extension":181,"heading":958,"image":959,"imageAlt":817,"keywords":960,"locale":190,"meta":963,"navigation":192,"path":964,"reviewed":192,"seo":965,"sitemap":966,"slug":972,"stem":973,"translationKey":972,"__hash__":974},"blog\u002Fblog\u002Fnl\u002Fthe-importance-of-predictable-velocity.md","Voorspelbare snelheid: betrouwbare sprintafspraken | AELBOX",{"type":9,"value":812,"toc":947},[813,819,822,826,829,832,835,843,847,851,854,858,861,864,871,878,882,886,889,892,895,898,902,905,908,915,919,923,931,934,938,944],[12,814,815],{},[15,816],{"alt":817,"height":18,"loading":19,"src":818,"width":21,"fetchPriority":22},"Planning-pokerkaarten en een stopwatch op een salontafel","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,820,821],{},"Voorspelbare snelheid is het vermogen om vooraf te weten hoeveel werk een team in een bepaalde periode afrondt, op basis van zijn beschikbaarheid.",[41,823,825],{"id":824},"het-probleem-van-wisselende-snelheid","Het probleem van wisselende snelheid",[12,827,828],{},"Als de snelheid tussen sprints schommelt, wordt het plannen van een release lastig. Niemand weet wanneer het werk wordt opgeleverd, en het hele Scrum-proces loopt vast. Chaos neemt het over, wat de moraal in het team niet ten goede komt.",[12,830,831],{},"Wisselende snelheid ontstaat meestal doordat teamleden hun best willen doen en meer toezeggen dan ze kunnen opleveren. In een omgeving waar wordt samengewerkt en het ontwikkelproces goed is ingericht, hoort er bij een taak meer dan alleen de implementatie. Sommige teamleden hebben geluk en krijgen taken die relatief eenvoudig te bouwen zijn, terwijl anderen op een probleem stuiten dat niemand had voorzien. In de ene sprint lijkt de snelheid hoog omdat het team doorgeschoven werk afrondt; in de volgende zakt hij weg omdat er nieuw werk doorschuift.",[12,833,834],{},"Doorgeschoven werk wekt de indruk dat het team ondermaats presteert: het zou meer kunnen, maar er komt altijd iets onvoorspelbaars tussen. Het management merkt het probleem op, ziet de gemiste deadlines en de spanning in het team loopt op.",[12,836,837],{},[15,838],{"alt":839,"height":840,"loading":32,"src":841,"width":842,"decoding":34},"Een gewone sprint met doorgeschoven werk",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,844,845],{},[38,846,839],{},[41,848,850],{"id":849},"de-bekende-problemen-bij-het-vasthouden-van-voorspelbaarheid","De bekende problemen bij het vasthouden van voorspelbaarheid",[12,852,853],{},"De problemen verschillen per project, maar veel komen in alle soorten projecten voor. Dit zijn de gebruikelijke, met praktische oplossingen.",[65,855,857],{"id":856},"reken-op-het-onverwachte","Reken op het onverwachte",[12,859,860],{},"Sommige taken hebben onderzoek nodig voordat ze kunnen starten. Stel je een feature voor die afhangt van een externe partij die misschien niet reageert op het moment dat je hem nodig hebt. Of een feature die niet kan worden gebouwd zoals gepland, omdat het team de onderliggende technologie verkeerd begreep toen de taak werd aangemaakt.",[12,862,863],{},"Als zo'n taak zonder het nodige onderzoek in een sprint belandt, duurt hij waarschijnlijk langer dan verwacht, en krijgt de schatting de schuld. Sommigen zullen zeggen dat je eerst een spike nodig hebt om het onderwerp te onderzoeken. Maar hoe weet je welke taken er een nodig hebben?",[12,865,866,867,870],{},"De enige manier is om ",[49,868,869],{"href":300},"alvast aan een taak te beginnen",". Door te starten voordat een taak is gepland, ontdek je problemen voordat ze optreden. Zo komt een taak pas in een sprint als hij duidelijk is en een deel van het werk al is gedaan.",[12,872,873],{},[15,874],{"alt":875,"height":840,"loading":32,"src":876,"width":877,"decoding":34},"Sprints met taken die alvast zijn begonnen","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,879,880],{},[38,881,875],{},[65,883,885],{"id":884},"vermijd-vage-taakomschrijvingen","Vermijd vage taakomschrijvingen",[12,887,888],{},"Sommige taken lijken voor de maker acceptabel, maar laten belangrijke details weg. Bepaalde implementatiedetails kunnen de oplevering flink beïnvloeden.",[12,890,891],{},"Belanghebbenden uit het bedrijf vinden misschien dat taakomschrijvingen geen technische details horen te bevatten, maar wie bouwt vindt de zakelijke eisen vaak te vaag om er iets mee te doen.",[12,893,894],{},"De oplossing is een technisch ontwerpdocument waarnaar de implementatietaak verwijst. Zo is duidelijk wat er precies gebouwd moet worden.",[12,896,897],{},"Het helpt ook om technische details in de taakbeschrijving op te nemen, zodat wie bouwt weet wat er moet gebeuren en potentiële problemen vroeg ziet.",[65,899,901],{"id":900},"capaciteit-verlagen-met-de-reeks-van-fibonacci","Capaciteit verlagen met de reeks van Fibonacci",[12,903,904],{},"Soms gaan teamleden met vakantie, of valt er een feestdag binnen de sprint. Trainingen en interne evenementen verkleinen de beschikbaarheid ook: de tijd die het team aan projectwerk kan besteden. In dat geval moet de capaciteit omlaag om de ontbrekende mensen te weerspiegelen.",[12,906,907],{},"De snelheid wordt als constant beschouwd, maar wordt berekend uit de gemiddelde snelheid van iedereen in het team. Neem voor het gemak aan dat één persoon één storypoint per dag afrondt. Is één persoon één dag afwezig, verlaag dan de capaciteit van de sprint met één storypoint. Zijn twee personen twee dagen afwezig (vier storypoints), verlaag de capaciteit dan met vijf storypoints (het volgende Fibonacci-getal) in plaats van vier. Zijn twee personen drie dagen afwezig, verlaag de capaciteit dan met acht punten in plaats van zes, om het risico van afhankelijkheden op te vangen.",[12,909,910],{},[15,911],{"alt":912,"height":840,"loading":32,"src":913,"width":914,"decoding":34},"Minder capaciteit toezeggen dan berekend","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,916,917],{},[38,918,912],{},[65,920,922],{"id":921},"vermijd-afhankelijke-taken","Vermijd afhankelijke taken",[12,924,925,926,930],{},"Vaak rondt de ene persoon een taak af waar de taak van een ander teamlid van afhangt. Zo ontstaan ",[49,927,929],{"href":928},"\u002Fnl\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","afhankelijkheden binnen het team of tussen teams",". Loopt de eerste taak uit, dan schuift elke afhankelijke taak op. Teamleden wachten, haasten zich zodra de afhankelijkheid is opgelost en verspillen kostbare tijd.",[12,932,933],{},"Afhankelijke taken kunnen eerder beginnen, zodat tegen de volgende sprint de kritieke taken stroomopwaarts bijna klaar zijn. Dat verkleint de impact van de afhankelijkheid op de snelheid in de huidige sprint.",[65,935,937],{"id":936},"schat-eerlijk","Schat eerlijk",[12,939,940,943],{},[49,941,942],{"href":286},"Taken eerlijk schatten"," is moeilijk en vraagt de aandacht van het hele team. Iedereen moet schatten zonder beïnvloed te worden door de schattingen van anderen. Alleen eerlijke schattingen laten zien hoe lang een epic echt duurt en houden releasedata realistisch.",[12,945,946],{},"Voorspelbare snelheid is geen tool en geen maatstaf die je een team oplegt; het is het resultaat van het één voor één wegnemen van verrassingen. Begin met de vijf oplossingen hierboven, en de releasedatum is geen gok meer.",{"title":158,"searchDepth":159,"depth":159,"links":948},[949,950],{"id":824,"depth":159,"text":825},{"id":849,"depth":159,"text":850,"children":951},[952,953,954,955,956],{"id":856,"depth":165,"text":857},{"id":884,"depth":165,"text":885},{"id":900,"depth":165,"text":901},{"id":921,"depth":165,"text":922},{"id":936,"depth":165,"text":937},"Waarom de snelheid per sprint schommelt en hoe je afspraken voorspelbaar maakt: vijf praktische oplossingen voor planning, capaciteit en afhankelijkheden.","Het belang van voorspelbare snelheid","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[961,792,494,491,962],"voorspelbare snelheid","releaseplanning",{},"\u002Fblog\u002Fnl\u002Fthe-importance-of-predictable-velocity",{"title":810,"description":957},{"loc":964,"images":967,"lastmod":178},[968,969,970,971],{"loc":818},{"loc":841},{"loc":876},{"loc":913},"the-importance-of-predictable-velocity","blog\u002Fnl\u002Fthe-importance-of-predictable-velocity","SOL5q_aQv4Ib5ZHk3ATjEPA3w67eEybhWBWt1tkDajs",1795345547047]