[{"data":1,"prerenderedAt":977},["ShallowReactive",2],{"blog-index-et":3},[4,204,346,512,608,810],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fet\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Sprindi sõltuvused ja aheldatud pull request’id | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Metallkett, planning pokeri kaardid ja kohvitass laual",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Sprindid sisaldavad sageli sõltuvaid tööüksusi, kas ühe meeskonna sees või mitme Scrumi meeskonna vahel. Täiuslikus maailmas sõltuvusi ei oleks; praktikas jääb peale ärivajadus ja sõltuvusi lisatakse väljalasketsükli lühendamiseks. See artikkel kirjeldab üht viisi, kuidas tarkvarameeskondades sõltuvaid ülesandeid hallata.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Sõltuvused ülesannete vahel",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"vanamoodne-viis","Vanamoodne viis",[12,46,47,48,53],{},"Lihtne lähenemine on alustada ülesandega niipea, kui selle sõltuvus on põhiharusse ühendatud. Sellise lähenemisega istuvad mõned meeskonnaliikmed jõude, kuni ülesanne on valmis. Lõpuks jääb ülejäänud sõltuvatele ülesannetele vähe või üldse mitte aega. Viimased ülesanded kantakse üle ja ",[49,50,52],"a",{"href":51},"\u002Fet\u002Fblog\u002Fcomparison-metrics-for-agile-teams","meeskond on rahulolematu",".",[12,55,56],{},"Miks see juhtub, kuigi mahutavus on õigesti hinnatud? Peamiselt jõudeaja tõttu, mis tekib kolleegide valmimise ootamisel. Isegi väikesed hilinemised kuhjuvad, eriti lühikestes sprintides.",[41,58,60],{"id":59},"sõltuvate-ülesannete-samaaegne-tegemine","Sõltuvate ülesannete samaaegne tegemine",[12,62,63],{},"Seda saab teha väikese lisakuluga. Kui meeskonnaliikmed teevad ülesandeid samaaegselt, on sellel mitmeid eeliseid.",[65,66,68],"h3",{"id":67},"parem-koostöö","Parem koostöö",[12,70,71],{},"Kui meeskonnaliikmed teevad sõltuvaid ülesandeid samaaegselt, meenutab see paariprogrammeerimist. Üks inimene peab mõistma eelnevat ülesannet, teine järgnevat. Meeskond saab lahendatavatest probleemidest laiema ülevaate.",[65,73,75],{"id":74},"jõudeaja-vältimine","Jõudeaja vältimine",[12,77,78],{},"Kui ülesanded kulgevad samaaegselt, ei pea keegi ootama, millal parandus põhiharusse jõuab. Kõik saavad korraga töötada ja küsimuste tekkides toimub rohkem jooksvat arutelu.",[65,80,82],{"id":81},"pull-requestid-on-koodiülevaatuseks-varem-valmis","Pull request’id on koodiülevaatuseks varem valmis",[12,84,85],{},"Kui sinu haru põhineb kolleegi harul, on algse pull request’i kinnitamine lihtsam. Sa mõistad juba, kuidas eelnev tööüksus realiseeriti, ja algset haru on kogu realiseerimise jooksul testitud ja üle vaadatud. See ei ole enam tundmatu territoorium.",[41,87,89],{"id":88},"aheldatud-kuhjatud-pull-requestide-kasutamine","Aheldatud (kuhjatud) pull request’ide kasutamine",[12,91,92],{},"Selline samaaegsus nõuab õigeid tööriistu. Gitil põhineva versioonihaldusega on see lihtne. Alljärgnevad sammud kirjeldavad protsessi.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Sõltuvuspuu",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Sõltuvuspuu (kuue sõltuva ülesande samaaegne tegemine)",[65,107,109],{"id":108},"kirjelda-sõltuvused-selgelt","Kirjelda sõltuvused selgelt",[12,111,112],{},"Määratle sõltuvuste kett sprindi planeerimise ajal. Pull request’ide kett järgib seejärel seda määratlust täpselt. Keti muutmine keset arendust on rebasimise tõttu kulukas.",[65,114,116],{"id":115},"alusta-juurülesannetest","Alusta juurülesannetest",[12,118,119],{},"Igal sõltuvuste ketil on juurülesanded, mis ei sõltu millestki muust. Nendega saab alustada juba esimesel päeval.",[65,121,123],{"id":122},"tee-esmalt-põhiosa","Tee esmalt põhiosa",[12,125,126],{},"See võib olla vastuolus testipõhise arendusega, kus testid tulevad esimesena. Et hoida pull request’ide kett hallatavana, realiseeri esmalt põhiosa. Nii saavad sõltuvad meeskonnaliikmed sellele varem ligi.",[65,128,130],{"id":129},"korralda-ja-vaata-kood-üle-fifo-järjekorras","Korralda ja vaata kood üle FIFO-järjekorras",[12,132,133],{},"Esimene loodud haru tuleks esimesena üle vaadata ja ühendada. Iga ühendamine käivitab CI; kui see lõhub põhibuildi, parandatakse probleem kohe, kui see on veel väike.",[41,135,137],{"id":136},"lisakulu","Lisakulu",[12,139,140],{},"Sõltuvate harude keti hoidmisel on eeliseid, kuid ka mõningaid puudusi.",[65,142,144],{"id":143},"rebasimine-või-ühendamine","Rebasimine või ühendamine",[12,146,147],{},"Kett tuleb sünkroonis hoida, mis nõuab pingutust. Kaasaegsed tööriistad pakuvad ühe klõpsuga sünkroonimist baasharuga, kui konflikte ei ole. Kasuta seda vajaduse järgi, kui baasharu muudatuste sissetoomine on turvaline. Kui build on roheline ja funktsioon töötab, sünkrooni.",[65,149,151],{"id":150},"meeskonnatöö","Meeskonnatöö",[12,153,154],{},"Sõltuvuste kett vajab koostööalist meeskonda, mille liikmed on valmis omavahel rääkima. See ei saa toimida, kui inimesed töötavad isoleeritult.",[12,156,157],{},"Sõltuvaid tööüksusi on kõige parem praegusest sprindist väljas hoida. Kui ärivajadused nõuavad nende paralleelset kulgu, on tuletatud harude kett praktiline viis sõltuvusest tuleneva lisakulu haldamiseks.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Sõltuvad tööüksused seiskavad sprindi, kuni inimesed ootavad. Vaata, kuidas kuhjatud pull request’id hoiavad töö liikumas ja vähendavad jõudeaega.","md","Sprindi sõltuvuste haldamine aheldatud pull request’idega","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"sprindi sõltuvused","kuhjatud pull requestid","aheldatud pull requestid","koodiülevaatus","agiilne tarnimine","et",{},true,"\u002Fblog\u002Fet\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fet\u002Fmanage-sprint-dependencies-with-chained-pull-requests","6lhVR5chmIMbcX9HGwifZoVomF0gwvRXekiYrqDaM2A",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":325,"description":326,"extension":182,"heading":327,"image":328,"imageAlt":213,"keywords":329,"locale":191,"meta":335,"navigation":193,"path":336,"reviewed":193,"seo":337,"sitemap":338,"slug":343,"stem":344,"translationKey":343,"__hash__":345},"blog\u002Fblog\u002Fet\u002Fcomparison-metrics-for-agile-teams.md","Võrdlusmõõdikud agiilsetele meeskondadele | AELBOX",{"type":9,"value":208,"toc":316},[209,216,219,223,226,234,238,242,245,249,252,260,264,272,276,279,282,289,293,296,303,306,310,313],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Joonlaud, planning pokeri kaardid ja kohvitass laual",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Agiilsete meeskondade võrdlemine on keeruline ja tasub küsida, miks me neid üldse võrdleme. Mida annab erinevates valdkondades töötavate meeskondade võrdlemine tegelikult juurde?",[41,220,222],{"id":221},"võistluse-loomine","Võistluse loomine",[12,224,225],{},"Meeskondi ei tohiks suvaliste mõõdikute põhjal ühte pingeritta asetada. See ainult demotiveerib inimesi. Selle asemel peaksid mõõdikud andma igale meeskonnale võrdsed võimalused võistelda. Siis paraneb tulemuslikkus seetõttu, et meeskonnad ise tahavad seda, mitte seetõttu, et keegi survestab.",[12,227,228],{},[15,229],{"alt":230,"height":231,"loading":32,"src":232,"width":233,"decoding":34},"Loo võistlus",487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,235,236],{},[38,237,230],{},[41,239,241],{"id":240},"mõõdikud-võrdsete-võimaluste-loomiseks","Mõõdikud võrdsete võimaluste loomiseks",[12,243,244],{},"Siin on neli põhilist mõõdikut meeskondade võrdlemiseks. Need mõõdavad iga meeskonna võimet võistelda võrdsetel alustel, ei midagi enamat. Võrreldavad mõõdikud loovad võrdsed võimalused.",[65,246,248],{"id":247},"õnnestunud-sprindid","Õnnestunud sprindid",[12,250,251],{},"Kui sprint oleks ainult ajavahemik, ei oleks sellest kasu. Sprint on vahe-eesmärk ja vajab eesmärki. Sprindi eesmärk (kõige olulisemate lugude kogum) on suurem vahe-eesmärk; kõigi lugude lõpetamine on väiksem. Korralda iga sprindi lõpus meeskondadevaheline demo, kus meeskonnad näitavad, mida nad tarnisid. Selline terve konkurents julgustab meeskondi oma sprindi eesmärke täitma. Inimestel on motivatsiooniks vaja nähtavat eesmärki.",[12,253,254],{},[15,255],{"alt":256,"height":257,"loading":32,"src":258,"width":259,"decoding":34},"Sprint eesmärgi poole",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,261,262],{},[38,263,256],{},[12,265,266,267,271],{},"Kas sellest võib saada üle- ja alakohustumise mäng? Kui meeskond võtab endale liiga vähe kohustusi, teeb demo selle ilmselgeks: näidata on vähem. Kui ta võtab liiga palju, muutub demo ",[268,269,270],"strong",{},"järjekordseks ebaõnnestunud sprindiks",". Lubatu tarnimine kasvatab motivatsiooni rohkem teha. Meeskonnad tunnevad oma tööst rahulolu.",[65,273,275],{"id":274},"kiiruse-stabiilsus-ja-aus-hindamine","Kiiruse stabiilsus ja aus hindamine",[12,277,278],{},"See on teadmistöö, mitte liinitöö. Kui keegi meeskonnas ei mõista probleemi piisavalt hästi, et selle lahendust hinnata, ei ole probleemi eelnevalt uuritud.",[12,280,281],{},"Ajaliselt piiratud uurimistöö eelmises sprindis ja sellele järgnev meeskonna ülevaade tulemustest teeb lihtsaks jagada realiseerimise väiksemateks lugudeks ja need korralikult hinnata. Keeruka töö puhul kirjuta põhjalikum tehnilise disaini dokument, mis loetleb realiseerimislood.",[12,283,284,285,53],{},"Uurimistöö ja disainitöö on ise lood, mida saab hinnata. Võti on määratleda keeruka lahenduse töö struktuur ja järjekord. Selle asemel et kohustuda looga, mida meeskond ei mõista, loo lünka täitev uurimisülesanne. Siis on hindamine ",[49,286,288],{"href":287},"\u002Fet\u002Fblog\u002Fsheepherding-story-points","tõenditel põhinev",[65,290,292],{"id":291},"mahutavuse-prognoositavus-ootamatu-töö-vältimine","Mahutavuse prognoositavus (ootamatu töö vältimine)",[12,294,295],{},"Uurimine tuleb enne, realiseerimine järgneb. Kui uurimine toob välja probleeme, luuakse ja hinnatakse uued tööüksused. Nii on järgmisest sprindist palju selgem pilt. Teadaolevat tööd saab hinnata ja planeerida; tundmatu töö saab enne hindamist ajaliselt piiratud uurimisülesande. Distsipliin seisneb suure töö jagamises väikesteks, hinnatavateks tükkideks.",[12,297,298,299,53],{},"Keeruka tööga saab alustada vara, kas või selleks, et avastada, et see vajab omaette lugude kogumit. See vähendab siiski ",[49,300,302],{"href":301},"\u002Fet\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","tundmatuse riski",[12,304,305],{},"Tugi ja tootmise tõrgete likvideerimine toimivad tavaliselt sprindivälises, ajaliselt piiratud Kanbani voos. Seal saavad võrdlusmõõdikuteks esmase vastuse aeg ja SLA rikkumised.",[65,307,309],{"id":308},"meeskonna-saadavus-ülesannetele-kulunud-aeg-jagatud-sprindi-koguajaga","Meeskonna saadavus (ülesannetele kulunud aeg jagatud sprindi koguajaga)",[12,311,312],{},"Saadavus on osa ajast, mille meeskonnaliikmed kulutavad hinnatud tööle. Kui üht meeskonda tõmmatakse koolitustele, teadmiste jagamisse või muusse sisemisse töösse teistest sagedamini, paranda tasakaalustamatus. Ainus viis hoida kiirus stabiilsena on hoida stabiilsena saadavus. Kui saadavus on meeskondade vahel võrdne, toimivad ka teised võrdlusmõõdikud.",[12,314,315],{},"Meeskondade võrdlemine ei ole mõeldud nõrga tulemuslikkuse karistamiseks, vaid motivatsiooni ja võistlusvaimu suurendamiseks, et tarnida rohkem. Seetõttu ei tohiks need mõõdikud olla nähtavad üksikutele meeskonnaliikmetele: need on juhendamise tööriist, mitte avalik edetabel. Neid mõõdikuid jälgides ja Scrum Mastereid kaudselt suunates annad meeskondadele võrdsed võimalused võistelda.",{"title":159,"searchDepth":160,"depth":160,"links":317},[318,319],{"id":221,"depth":160,"text":222},{"id":240,"depth":160,"text":241,"children":320},[321,322,323,324],{"id":247,"depth":166,"text":248},{"id":274,"depth":166,"text":275},{"id":291,"depth":166,"text":292},{"id":308,"depth":166,"text":309},"2018-05-04","Mõõdikud peaksid looma võrdsed võimalused, mitte edetabeli. Neli võrdlusmõõdikut, mis motiveerivad agiilseid meeskondi neid karistamata.","Võrdlusmõõdikud agiilsetele meeskondadele","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[330,331,332,333,334],"agiilsed mõõdikud","meeskonna kiirus","agiilsed meeskonnad","scrum","mahutavus",{},"\u002Fblog\u002Fet\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":326},{"loc":336,"images":339,"lastmod":179},[340,341,342],{"loc":215},{"loc":232},{"loc":258},"comparison-metrics-for-agile-teams","blog\u002Fet\u002Fcomparison-metrics-for-agile-teams","TjVuMlBjVNvBcJrDA3rabWT5fVPRoZ934JvmkYkfRLM",{"id":347,"title":348,"author":7,"body":349,"dateModified":179,"datePublished":488,"description":489,"extension":182,"heading":490,"image":491,"imageAlt":355,"keywords":492,"locale":191,"meta":498,"navigation":193,"path":499,"reviewed":193,"seo":500,"sitemap":501,"slug":509,"stem":510,"translationKey":509,"__hash__":511},"blog\u002Fblog\u002Fet\u002Fsheepherding-story-points.md","Lambaefekt story point’ides: ankur planning pokeris | AELBOX",{"type":9,"value":350,"toc":479},[351,357,360,364,371,379,383,387,390,393,400,404,407,411,414,419,423,427,430,437,441,445,448,453,457,461,473,476],[12,352,353],{},[15,354],{"alt":355,"height":18,"loading":19,"src":356,"width":21,"fetchPriority":22},"Lambakari ja planning pokeri kaardid kohvilaual","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,358,359],{},"Story point’ide hindamine jääb sageli hooletusse või toimub vestlusruumides ja avatud koosolekutel, kus kõik näevad või kuulevad iga häält. Teadmine, kuidas teised hääletasid, moonutab tulemust ja annab ebatäpseid hinnanguid. Korduvad ebatäpsed hinnangud viivad vigaste plaanide ning hilinenud või tühistatud tarneteni. Järgnev kirjeldab, mis avatud hääletusel juhtub.",[41,361,363],{"id":362},"hääletuse-tegelased","Hääletuse tegelased",[12,365,366,367,370],{},"Avatud hindamishääletusel astub lavale mitu tegelast. Hinnang sõltub sellest, kes alustab, ja on tavaliselt ausast hinnangust kaugel. Miks on järjekord avatud hääletusel nii tähtis? ",[268,368,369],{},"Lambaefekti"," tõttu: see on ankurdusefekt, mis paneb teised meeskonnaliikmed esimest hinnangut kopeerima.",[12,372,373],{},[15,374],{"alt":375,"height":376,"loading":32,"src":377,"width":378,"decoding":34},"Lambaefekt",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,380,381],{},[38,382,375],{},[65,384,386],{"id":385},"liigse-enesekindlusega-hääletaja","Liigse enesekindlusega hääletaja",[12,388,389],{},"Igas meeskonnas on vähemalt üks liige, kes arvab, et tunneb süsteemi kõige paremini. Tavaliselt hääletab ta esimesena, sest vastused tunduvad talle ilmsed. Sageli jätab ta detailid kahe silma vahele, mis võivad hinnangu rööbastelt välja lüüa. Need detailid saab eelnevalt välja selgitada, kuid ainult siis, kui keegi arutelu algatab. Avatud hääletusel see võimalik ei ole.",[12,391,392],{},"See inimene hääletab tavaliselt ausast hinnangust madalama numbri poolt. Võib-olla suudaks ainult tema loo nii kiiresti valmis teha, ja sedagi õnne korral.",[12,394,395],{},[15,396],{"alt":386,"height":397,"loading":32,"src":398,"width":399,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,401,402],{},[38,403,386],{},[12,405,406],{},"Kõik teised järgivad, nii et ülesanne tundub lihtne ja igaühe jaoks etteantud ajaga teostatav. Praktikas teeb selle tavaliselt keegi teine.",[65,408,410],{"id":409},"vaikne-hääletaja","Vaikne hääletaja",[12,412,413],{},"Vaikseid hääletajaid on tavaliselt rohkem kui üks ja nad kardavad esimesena hääletada. Nad ootavad, kuni keegi teine hääletab, et seda siis kopeerida. Nad liituvad aruteluga harva ja vastavad ainult siis, kui küsitakse. Nad hääletavad teisena, vahetult enne ükskõikseid hääletajaid.",[12,415,416],{},[15,417],{"alt":410,"height":397,"loading":32,"src":418,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,420,421],{},[38,422,410],{},[65,424,426],{"id":425},"ükskõikne-hääletaja","Ükskõikne hääletaja",[12,428,429],{},"Neid on realiseerimise ajal raske kätte saada, kuid hääletamisel on nende käitumine ilmne. Nad hääletavad alati viimasena ja kopeerivad kellegi teise hinnangut. Kui hinnangud erinevad, valivad nad kõige levinuma. Nad ei taha selgitada, miks valisid madalama või kõrgema numbri, seega väldivad täpsustamisel koostööd ja hiilivad küsimustest kõrvale.",[12,431,432],{},[15,433],{"alt":426,"height":434,"loading":32,"src":435,"width":436,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,438,439],{},[38,440,426],{},[65,442,444],{"id":443},"väsinud-hääletaja","Väsinud hääletaja",[12,446,447],{},"Mõned meeskonnaliikmed ei suuda kaua keskenduda ja jätavad arutelu võtmeosad märkamata. Nad kaotavad konteksti ning kas oletavad või otsivad kõige levinumat häält, mida kopeerida.",[12,449,450],{},[15,451],{"alt":444,"height":397,"loading":32,"src":452,"width":399,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,454,455],{},[38,456,444],{},[41,458,460],{"id":459},"kuidas-hoida-tähelepanu-hindamise-ajal","Kuidas hoida tähelepanu hindamise ajal",[12,462,463,464,468,469,472],{},"Hindamine on oluline, sest ainult ausad story point’id hoiavad ",[49,465,467],{"href":466},"\u002Fet\u002Fblog\u002Fcorrectly-estimating-release-deadline","projekti väljalaskekuupäeva kursil",". Ausa hindamise võti on ",[268,470,471],{},"lambaefektile"," vastu astuda, olenemata sellest, kas kasutad paberkarte või tarkvara.",[12,474,475],{},"Meeskonnaliikmed ei tohiks teiste hinnanguid näha enne, kui moderaator need avaldab. Nii hakkab vaikne hääletaja mõtlema, ükskõikne hääletaja huvituma ja väsinud hääletaja ärkab. Parim küsimus, eriti kui keegi on grupiga erineval meelel, on „miks hääletasid X story point’i?”. See käivitab vestluse tegelikest realiseerimisprobleemidest. Kinnised küsimused nagu „kas nõustuksid X story point’iga?” kutsuvad esile sisutu „jah”.",[12,477,478],{},"Hea hindamisvahend muudab täpsustamise kaasahaaravamaks ja hoiab kõik valvsad ning aruteluvalmis, nii et ka keerulised lood saavad paremad hinnangud.",{"title":159,"searchDepth":160,"depth":160,"links":480},[481,487],{"id":362,"depth":160,"text":363,"children":482},[483,484,485,486],{"id":385,"depth":166,"text":386},{"id":409,"depth":166,"text":410},{"id":425,"depth":166,"text":426},{"id":443,"depth":166,"text":444},{"id":459,"depth":160,"text":460},"2018-04-30","Avatud hääletusel seab esimene hinnang toa ankrusse. Vaata, kuidas lambaefekt story point’e moonutab ja kuidas planning pokkerit ausalt läbi viia.","Lambaefekt story point’ide hindamisel","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[493,494,495,496,497],"story pointid","planning poker","ankurdusefekt","lambaefekt","agiilne hindamine",{},"\u002Fblog\u002Fet\u002Fsheepherding-story-points",{"title":348,"description":489},{"loc":499,"images":502,"lastmod":179},[503,504,505,506,507,508],{"loc":356},{"loc":377},{"loc":398},{"loc":418},{"loc":435},{"loc":452},"sheepherding-story-points","blog\u002Fet\u002Fsheepherding-story-points","LHD5HE9dvYDOQ7WtiLJc3PO-xc6gcs5bOgJU3I_svKw",{"id":513,"title":514,"author":7,"body":515,"dateModified":179,"datePublished":588,"description":589,"extension":182,"heading":590,"image":591,"imageAlt":521,"keywords":592,"locale":191,"meta":597,"navigation":193,"path":598,"reviewed":193,"seo":599,"sitemap":600,"slug":605,"stem":606,"translationKey":605,"__hash__":607},"blog\u002Fblog\u002Fet\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","10% Scrumbani reegel igaks sprindiks | AELBOX",{"type":9,"value":516,"toc":583},[517,524,532,536,539,547,551,555,558,562,565,568,576,580],[12,518,519],{},[15,520],{"alt":521,"height":522,"loading":19,"src":523,"width":21,"fetchPriority":22},"Planning pokeri kaardid ja Kanbani tahvel kohvilaual",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,525,526,527,531],{},"Paljud meeskonnad planeerivad kasutada täpselt seda mahutavust, mida näitab nende Jira plaan. See on sageli viga ja viib ebaõnnestunud sprintideni. Miks see juhtub, kui ",[49,528,530],{"href":529},"\u002Fet\u002Fblog\u002Fthe-importance-of-predictable-velocity","mahutavuse arvutused"," tunduvad nii täpsed?",[41,533,535],{"id":534},"kiirustamine-rohkema-tarnimise-nimel","Kiirustamine rohkema tarnimise nimel",[12,537,538],{},"Tooteomanikud kipuvad pärast iga õnnestunud sprinti nõudma suuremat kiirust, mis on loomulik reaktsioon viimastele tulemustele. Kui meeskond tegi eelmises sprindis teatud arvu story point’e, oodatakse järgmises rohkem. See kordub, kuni mõni sprint ebaõnnestub. Surve on katse proovile panna meeskonna piire. Meie kogemuse järgi on see vastuproduktiivne. Lõpuks demotiveerib see meeskonda, kes hakkab iga tulevast sprinti hukule määratuna nägema.",[12,540,541],{},[15,542],{"alt":543,"height":544,"loading":32,"src":545,"width":546,"decoding":34},"Hukule määratud sprint",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,548,549],{},[38,550,543],{},[41,552,554],{"id":553},"palavikuline-sprindi-lõpp-tarnega-kiirustades","Palavikuline sprindi lõpp tarnega kiirustades",[12,556,557],{},"Kui mahutavus planeeritakse sprindi täpselt täitma, tekitab iga hilinemine või realiseerunud risk surve töötada sprindi lõpus meeletu tempoga. Seejärel tarnib meeskond vähem kui lubatud, sest stress võtab võimust. Selline sprindi lõpu tormamine tuleks kõrvaldada.",[41,559,561],{"id":560},"lase-meeskonnal-tarnida-rohkem-omal-tahtel","Lase meeskonnal tarnida rohkem omal tahtel",[12,563,564],{},"Planeeri ainult 90% meeskonna mahutavusest ja jäta ülejäänud 10% reservi planeerimata backlogitööde jaoks. Need ülesanded tõmmatakse sprindi jooksul backlogist Scrumbani kombel. Puhver neelab riski ja laseb meeskonnal sprindi (või vähemalt sprindi eesmärgi) paar päeva varem lõpetada. Kui väline sõltuvus ohustab sprinti, saab puhvris olev ülesanne probleemse asendada.",[12,566,567],{},"See 10% ei kuulu sprindi kohustuse hulka. Kui risk ei realiseeru, tarnib meeskond selle lisatööna; kui midagi läheb valesti, kulub puhver, kuid sprindi eesmärk ja kohustus on siiski täidetud. Jälgi, kui suur osa puhvrist kasutatakse: kui see jõuab regulaarselt näiteks 20%-ni, on aeg tõsta meeskonna kiirust 10% võrra, säilitades samal ajal 10% puhvri.",[12,569,570],{},[15,571],{"alt":572,"height":573,"loading":32,"src":574,"width":575,"decoding":34},"Tarni varem, tarni lisaks",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,577,578],{},[38,579,572],{},[12,581,582],{},"Meie kogemus näitab, et just siis töötavad inimesed ilma surveta ja annavad kõige suurema panuse. Kiirus saab kasvada meeskonna enda tempos, ilma välise surveta ja ilma suurema stressita. Kasv tundub loomulik ja jätkusuutlik.",{"title":159,"searchDepth":160,"depth":160,"links":584},[585,586,587],{"id":534,"depth":160,"text":535},{"id":553,"depth":160,"text":554},{"id":560,"depth":160,"text":561},"2018-04-28","Täisvõimsusega kohustumine muudab iga sprindi hapraks. 10% Scrumbani puhver neelab riski, kaitseb sprindi eesmärki ja laseb kiirusel loomulikult kasvada.","10% Scrumbani reegel igaks sprindiks","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[593,594,595,596,333],"scrumban","sprindi mahutavus","agiilne puhver","kiirus",{},"\u002Fblog\u002Fet\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":514,"description":589},{"loc":598,"images":601,"lastmod":179},[602,603,604],{"loc":523},{"loc":545},{"loc":574},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fet\u002Fthe-10-percent-scrumban-rule-for-every-sprint","kk1FIlNF_W-T76jbwhGAQtDe6krZdrZXHmFq_bzmPBw",{"id":609,"title":610,"author":7,"body":611,"dateModified":179,"datePublished":788,"description":789,"extension":182,"heading":790,"image":791,"imageAlt":617,"keywords":792,"locale":191,"meta":796,"navigation":193,"path":797,"reviewed":193,"seo":798,"sitemap":799,"slug":807,"stem":808,"translationKey":807,"__hash__":809},"blog\u002Fblog\u002Fet\u002Fcorrectly-estimating-release-deadline.md","Kuidas hinnata väljalaskekuupäeva story point’idega | AELBOX",{"type":9,"value":612,"toc":774},[613,619,622,626,633,637,640,648,652,656,659,662,666,669,677,682,686,689,693,696,700,703,710,714,718,721,725,728,736,740,744,747,752,759,767,771],[12,614,615],{},[15,616],{"alt":617,"height":18,"loading":19,"src":618,"width":21,"fetchPriority":22},"Planning pokeri kaardid, Gantti diagramm ja kohvitass laual","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,620,621],{},"Projektijuhtimise oluline osa on projekti väljalaskekuupäeva hindamine. Kuid kuidas ennustada, millal suur ja keeruline süsteem valmis saab?",[41,623,625],{"id":624},"hindamise-probleemid","Hindamise probleemid",[12,627,628,629,632],{},"Õigeks ajaks tarnimiseks on vaja töö usaldusväärset hinnangut. ",[49,630,631],{"href":529},"Ülesannete hindamine on tavaliselt keeruline",", eriti kui pead iga ülesande puhul kohustuma ajahinnanguga. Psühholoogiliselt on valmimisajaga kohustumine raske ja need kohustused ebaõnnestuvad sageli.",[65,634,636],{"id":635},"aja-probleem","Aja probleem",[12,638,639],{},"Aja hindamine on problemaatiline lihtsal põhjusel: mida keerulisem ülesanne, seda suurem on tõenäosus tähtaega ületada. See sõltub ka sellest, kes ülesande enda peale võtab. Meeskonnaliikmed töötavad erineva kiirusega ja teevad valmis erineva koguse tööd. Kuna saadavus muutub puhkuste ja koolituste tõttu, võib kiireima meeskonnaliikme hinnatud ülesanne jõuda kõige aeglasema kätte. Viimistletud Gantti diagramm muutub segaduseks: ülesanded lähevad tähtajast üle ja juhid muretsevad pidevalt, kas projekt jõuab õigeks ajaks valmis.",[12,641,642],{},[15,643],{"alt":644,"height":645,"loading":32,"src":646,"width":647,"decoding":34},"Katkine Gantti diagramm",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,649,650],{},[38,651,644],{},[65,653,655],{"id":654},"vastuseis-ajahinnangutele","Vastuseis ajahinnangutele",[12,657,658],{},"Kui realiseerijatelt hinnangut küsitakse, on vastumeelsus tavaline: kui hinnangust mööda minnakse, kes on süüdi? Ja kui ühe inimese hinnatud ülesanne jõuab kellegi teiseni, keda süüdistatakse, kui tegelik aeg erineb?",[12,660,661],{},"Tulemuseks on soov mitte üldse hinnata, mis teeb juhtkonna jaoks tarnekuupäevade korrektse hindamise raskeks.",[41,663,665],{"id":664},"story-pointide-kasutamine","Story point’ide kasutamine",[12,667,668],{},"Story point’id pakuvad alternatiivi ajahinnangutele. Story point ei ole fikseeritud tööühik; see on suhteline hinnang, mis kasvab eksponentsiaalselt. Kogu meeskond hindab koos täpsustamise ajal.",[12,670,671],{},[15,672],{"alt":673,"height":674,"loading":32,"src":675,"width":676,"decoding":34},"Story point’ide näide",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,678,679],{},[38,680,681],{},"Näitehinnangud",[65,683,685],{"id":684},"vastutuse-jagamine","Vastutuse jagamine",[12,687,688],{},"Story point’idega hindab iga ülesannet kogu meeskond. Hinnang võetakse vastu, kui kõik sellega nõustuvad. Nii välditakse hilisemaid vaidlusi selle üle, kes ülesannet hindas ja kui kaua see tegelikult võttis. Meeskond leppis ette kokku, seega on vastutus jagatud.",[65,690,692],{"id":691},"keerukuse-hindamine","Keerukuse hindamine",[12,694,695],{},"Story point’id haaravad ülesande keerukust, sealhulgas väliseid sõltuvusi ja riski, et midagi võib valesti minna. Kuna need ei ole kohustus füüsilise mõõdiku, näiteks aja ees, on meeskonnal neid lihtsam anda.",[65,697,699],{"id":698},"väikseim-hinnang","Väikseim hinnang",[12,701,702],{},"Kuna story point’id on suhtelised, vajad ankrut, millest alustada. Ankur on väikseim tööühik, mis nõuab mingit realiseerimispingutust. See on väikseim töömaht, mida meeskond suudab hinnata.",[12,704,705],{},[15,706],{"alt":699,"height":707,"loading":32,"src":708,"width":709,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,711,712],{},[38,713,699],{},[65,715,717],{"id":716},"suurim-hinnang","Suurim hinnang",[12,719,720],{},"Story point’id kasvavad eksponentsiaalselt: mida keerulisem ülesanne, seda raskem on seda hinnata. Skaala võib ulatuda lõpmatuseni (∞), kuigi seda hinnangut kasutatakse harva. Suurim hinnang peaks olema suurim töömaht, mille üks inimene sprindis keskmiselt valmis teeb. Sprindi pikkus peaks vastama suurimale töömahule, mida üks inimene suudab käsitleda ilma ülesande üle kontrolli kaotamata.",[65,722,724],{"id":723},"lood-mis-on-suurimast-hinnangust-suuremad","Lood, mis on suurimast hinnangust suuremad",[12,726,727],{},"Mõned ülesanded saavad rohkem story point’e, kui üks inimene sprindis valmis teeb. Kui need sprinti panna, tekib üle kanduv töö. Üle kanduv töö jätab sprindist puuduliku ja tööst lõpetamata mulje. Üle selle piiri hinnatud ülesanded tuleb jagada väiksemateks ühikuteks ja uuesti hinnata.",[12,729,730],{},[15,731],{"alt":732,"height":733,"loading":32,"src":734,"width":735,"decoding":34},"13 story point’i jagamine",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,737,738],{},[38,739,732],{},[41,741,743],{"id":742},"kiirus-story-pointides","Kiirus story point’ides",[12,745,746],{},"Kiirus on keskmine story point’ide arv, mille meeskond täieliku saadavuse juures sprindis valmis teeb. Saadavus on osa sprindist, mille meeskond saab pärast puhkusi, koolitusi ja tugitööd tegelikult projektitööle pühendada. Mahutavus on kiirus korrutatud saadavusega.",[12,748,749],{},[38,750,751],{},"mahutavus = kiirus × saadavus",[12,753,754,755,758],{},"Kuna mahutavus on väljendatud story point’ides, saab selle meeskonna story point’i ja aja suhte abil ajaks teisendada. Kui ",[49,756,757],{"href":529},"kiirus on prognoositav",", saab väljalaskekuupäeva täpselt hinnata. Story point’idel ja sprintidel põhinev Gantti diagramm on stabiilne ja prognoositav:",[12,760,761],{},[15,762],{"alt":763,"height":764,"loading":32,"src":765,"width":766,"decoding":34},"Parandatud Gantti diagramm",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,768,769],{},[38,770,763],{},[12,772,773],{},"Selles ongi muutus: kui kiirus on stabiilne, muutub väljalaskekuupäev oletuse asemel arvutuseks.",{"title":159,"searchDepth":160,"depth":160,"links":775},[776,780,787],{"id":624,"depth":160,"text":625,"children":777},[778,779],{"id":635,"depth":166,"text":636},{"id":654,"depth":166,"text":655},{"id":664,"depth":160,"text":665,"children":781},[782,783,784,785,786],{"id":684,"depth":166,"text":685},{"id":691,"depth":166,"text":692},{"id":698,"depth":166,"text":699},{"id":716,"depth":166,"text":717},{"id":723,"depth":166,"text":724},{"id":742,"depth":160,"text":743},"2018-04-14","Ajahinnangud ebaõnnestuvad, kui keerukus ja saadavus muutuvad. Vaata, kuidas story point’id, ühine hindamine ja kiirus teevad väljalaskekuupäevad prognoositavaks.","Kuidas hinnata väljalaskekuupäeva","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[793,493,497,794,795],"väljalaskekuupäev","sprindi kiirus","mahutavuse planeerimine",{},"\u002Fblog\u002Fet\u002Fcorrectly-estimating-release-deadline",{"title":610,"description":789},{"loc":797,"images":800,"lastmod":179},[801,802,803,804,805,806],{"loc":618},{"loc":646},{"loc":675},{"loc":708},{"loc":734},{"loc":765},"correctly-estimating-release-deadline","blog\u002Fet\u002Fcorrectly-estimating-release-deadline","XqpgxKPMDUU_bA3NLpmfHoM6cIYP1jwN15ohGpYr_iQ",{"id":811,"title":812,"author":7,"body":813,"dateModified":179,"datePublished":788,"description":959,"extension":182,"heading":960,"image":961,"imageAlt":819,"keywords":962,"locale":191,"meta":965,"navigation":193,"path":966,"reviewed":193,"seo":967,"sitemap":968,"slug":974,"stem":975,"translationKey":974,"__hash__":976},"blog\u002Fblog\u002Fet\u002Fthe-importance-of-predictable-velocity.md","Prognoositav kiirus: usaldusväärsed sprindikohustused | AELBOX",{"type":9,"value":814,"toc":949},[815,821,824,828,831,834,837,845,849,853,856,860,863,866,873,880,884,888,891,894,897,900,904,907,910,917,921,925,933,936,940,946],[12,816,817],{},[15,818],{"alt":819,"height":18,"loading":19,"src":820,"width":21,"fetchPriority":22},"Planning pokeri kaardid ja stopper kohvilaual","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,822,823],{},"Prognoositav kiirus tähendab seda, et tead ette, kui palju tööd meeskond antud perioodil oma saadavuse põhjal valmis teeb.",[41,825,827],{"id":826},"kõikuva-kiiruse-probleem","Kõikuva kiiruse probleem",[12,829,830],{},"Kui kiirus sprintide vahel kõigub, muutub väljalaske planeerimine keeruliseks. Keegi ei tea, millal töö valmis saab, ja kogu Scrumi protsess laguneb. Võimust võtab kaos, mis meeskonna moraalile sugugi kasuks ei tule.",[12,832,833],{},"Kiiruse kõikumine tuleb tavaliselt sellest, et meeskonnaliikmed püüavad anda endast parima ja võtavad kohustusi rohkem, kui suudavad täita. Hästi üles seatud arendusprotsessiga koostöökeskkonnas ei piirdu ülesanne otsese realiseerimisega. Mõnel meeskonnaliikmel veab ja ta saab suhteliselt lihtsa ülesande, teine aga põrkab probleemi otsa, mida keegi ei osanud oodata. Ühes sprindis tundub kiirus suur, sest meeskond lõpetab üle kandunud töid, järgmises langeb, sest tekivad uued üle kanduvad tööd.",[12,835,836],{},"Üle kanduvad tööd jätavad mulje, et meeskond ei anna endast parimat: ta võiks rohkem, aga alati tuleb ette midagi ettearvamatut. Juhtkond märkab probleemi, näeb mööda lastud tähtaegu ja meeskonnaliikmete vahel kasvab pinge.",[12,838,839],{},[15,840],{"alt":841,"height":842,"loading":32,"src":843,"width":844,"decoding":34},"Tavaline sprint üle kanduvate töödega",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,846,847],{},[38,848,841],{},[41,850,852],{"id":851},"levinud-probleemid-prognoositavuse-hoidmisel","Levinud probleemid prognoositavuse hoidmisel",[12,854,855],{},"Probleemid erinevad projektiti, kuid paljud on ühised igale projektitüübile. Siin on tavalised probleemid ja praktilised lahendused nende jaoks.",[65,857,859],{"id":858},"oota-ootamatut","Oota ootamatut",[12,861,862],{},"Mõned ülesanded vajavad enne alustamist uurimist. Kujuta ette funktsiooni, mis sõltub kolmandast osapoolest, kes ei pruugi sulle vajalikul hetkel vastata. Või funktsiooni, mida ei saa plaanipäraselt realiseerida, sest meeskond mõistis ülesannet luues alustehnoloogiat valesti.",[12,864,865],{},"Kui selline ülesanne lisatakse sprinti ilma vajaliku uurimistööta, võtab see tõenäoliselt oodatust kauem ja süü langeb hinnangule. Mõni ütleks, et teemat tuleb kõigepealt uurida eraldi uurimistööga (spike). Aga kuidas teada, millised ülesanded seda vajavad?",[12,867,868,869,872],{},"Ainus viis on ",[49,870,871],{"href":301},"ülesandega varem alustada",". Enne planeerimist alustamine võimaldab probleemid avastada enne, kui need tekivad. Sellise lähenemisega jõuab ülesanne sprinti alles siis, kui see on selge ja osa tööst on juba tehtud.",[12,874,875],{},[15,876],{"alt":877,"height":842,"loading":32,"src":878,"width":879,"decoding":34},"Sprindid, kus töödega on varem alustatud","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,881,882],{},[38,883,877],{},[65,885,887],{"id":886},"väldi-häguseid-ülesandekirjeldusi","Väldi häguseid ülesandekirjeldusi",[12,889,890],{},"Mõni ülesanne tundub oma loojale korras, kuid jätab välja olulised detailid. Mõned realiseerimise detailid võivad tarnet tõsiselt mõjutada.",[12,892,893],{},"Äripoole sidusrühmad võivad väita, et ülesandekirjeldus ei peaks sisaldama tehnilisi detaile, kuid realiseerijate jaoks on ärinõuded sageli liiga ebamäärased, et nende põhjal tegutseda.",[12,895,896],{},"Lahendus on tehnilise disaini dokument, millele realiseerimisülesanne viitab. Nii on selge, mida täpselt tuleb ehitada.",[12,898,899],{},"Kasuks tuleb ka tehniliste detailide lisamine ülesande kirjeldusse, et realiseerijad teaksid, mida tuleb teha, ja märkaksid võimalikud probleemid varakult.",[65,901,903],{"id":902},"vähenda-mahutavust-fibonacci-jada-abil","Vähenda mahutavust Fibonacci jada abil",[12,905,906],{},"Mõnikord jäävad meeskonnaliikmed puhkusele või langeb sprindi sisse riigipüha. Ka koolitused ja sisemised üritused vähendavad saadavust, see tähendab aega, mille meeskond saab projektitööle pühendada. Sellisel juhul tuleb mahutavust vähendada puuduvate inimeste arvelt.",[12,908,909],{},"Eeldatakse, et kiirus on konstantne, kuid see arvutatakse kogu meeskonna keskmisest kiirusest. Lihtsuse huvides eeldame, et üks inimene teeb päevas valmis ühe story point’i. Kui üks inimene puudub ühe päeva, vähenda sprindi mahutavust ühe story point’i võrra. Kui kaks inimest puuduvad kaks päeva (neli story point’i), vähenda mahutavust nelja asemel viie story point’i võrra (järgmine Fibonacci arv). Kui kaks inimest puuduvad kolm päeva, vähenda kuue asemel kaheksa punkti võrra, et arvestada sõltuvusriskiga.",[12,911,912],{},[15,913],{"alt":914,"height":842,"loading":32,"src":915,"width":916,"decoding":34},"Plaanitakse vähem kui arvutus lubab","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,918,919],{},[38,920,914],{},[65,922,924],{"id":923},"väldi-sõltuvaid-ülesandeid","Väldi sõltuvaid ülesandeid",[12,926,927,928,932],{},"Sageli teeb üks inimene ülesande, millest sõltub teise meeskonnaliikme ülesanne. Nii tekivad ",[49,929,931],{"href":930},"\u002Fet\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","meeskonnasisessed või meeskondadevahelised sõltuvused",". Kui esimene ülesanne hilineb, lükkub edasi iga sõltuv ülesanne. Meeskonnaliikmed passivad ja tormavad siis, kui sõltuvus on lahendatud, raisates väärtuslikku aega.",[12,934,935],{},"Sõltuvaid ülesandeid saab alustada varem, nii et järgmiseks sprindiks on kriitilised eelnevad ülesanded peaaegu valmis. See vähendab sõltuvuse mõju kiirusele praeguses sprindis.",[65,937,939],{"id":938},"hinda-ausalt","Hinda ausalt",[12,941,942,945],{},[49,943,944],{"href":287},"Ülesannete aus hindamine"," on keeruline ja nõuab kogu meeskonna tähelepanu. Igaüks peaks hindama nii, et teda ei mõjuta teiste hinnangud. Ainult ausad hinnangud näitavad, kui kaua eepos tegelikult võtab, ja hoiavad väljalaskekuupäevad realistlikuna.",[12,947,948],{},"Prognoositav kiirus ei ole tööriist ega mõõdik, mille meeskonnale peale surud; see on tulemus, mis saabub, kui ootamatused ükshaaval kõrvaldada. Alusta viie ülaltoodud parandusega ja väljalaskekuupäev lakkab olemast oletus.",{"title":159,"searchDepth":160,"depth":160,"links":950},[951,952],{"id":826,"depth":160,"text":827},{"id":851,"depth":160,"text":852,"children":953},[954,955,956,957,958],{"id":858,"depth":166,"text":859},{"id":886,"depth":166,"text":887},{"id":902,"depth":166,"text":903},{"id":923,"depth":166,"text":924},{"id":938,"depth":166,"text":939},"Miks kiirus sprintide vahel kõigub ja kuidas muuta kohustused prognoositavaks: viis praktilist parandust planeerimises, mahutavuses ja sõltuvustes.","Prognoositava kiiruse tähtsus","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[963,794,497,493,964],"prognoositav kiirus","väljalaske planeerimine",{},"\u002Fblog\u002Fet\u002Fthe-importance-of-predictable-velocity",{"title":812,"description":959},{"loc":966,"images":969,"lastmod":179},[970,971,972,973],{"loc":820},{"loc":843},{"loc":878},{"loc":915},"the-importance-of-predictable-velocity","blog\u002Fet\u002Fthe-importance-of-predictable-velocity","J-x3oCGqYgTiWnQa93dl6WIboNtbY2zadQ2cBSbtojs",1795345548033]