[{"data":1,"prerenderedAt":976},["ShallowReactive",2],{"blog-index-es":3},[4,204,345,509,605,808],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fes\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Dependencias de sprint y pull requests encadenados | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"Una cadena metálica, cartas de planning poker y una taza de café sobre una mesa",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Los sprints suelen contener actividades dependientes, ya sea dentro de un equipo o entre varios equipos Scrum. En un mundo perfecto no existirían dependencias; en la práctica, las necesidades del negocio mandan y se añaden dependencias para acortar el ciclo de entrega. Este artículo describe una forma de gestionar tareas dependientes en equipos de software.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Dependencias entre tareas",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"la-forma-anticuada","La forma anticuada",[12,46,47,48,53],{},"El enfoque directo es empezar una tarea en cuanto su dependencia se fusiona en la rama principal. Con ese enfoque, algunos miembros del equipo se quedan inactivos hasta que una tarea está lista. Al final queda poco o ningún tiempo para las actividades dependientes restantes. Las últimas tareas se arrastran y ",[49,50,52],"a",{"href":51},"\u002Fes\u002Fblog\u002Fcomparison-metrics-for-agile-teams","el equipo no está contento",".",[12,55,56],{},"¿Por qué ocurre si la capacidad está bien estimada? Sobre todo por el tiempo muerto mientras se espera a que los compañeros terminen. Incluso los retrasos pequeños se acumulan, sobre todo en sprints cortos.",[41,58,60],{"id":59},"trabajar-en-tareas-dependientes-al-mismo-tiempo","Trabajar en tareas dependientes al mismo tiempo",[12,62,63],{},"Hay una forma de hacerlo con una pequeña sobrecarga. Cuando los miembros del equipo trabajan en tareas al mismo tiempo, hay varias ventajas.",[65,66,68],"h3",{"id":67},"mejor-colaboración","Mejor colaboración",[12,70,71],{},"Cuando los miembros del equipo trabajan al mismo tiempo en tareas dependientes, se parece a la programación por parejas. Una persona debe entender la tarea de origen; la otra, la tarea dependiente. El equipo obtiene un conocimiento más amplio de los problemas que se están resolviendo.",[65,73,75],{"id":74},"evitar-los-tiempos-muertos","Evitar los tiempos muertos",[12,77,78],{},"Cuando las tareas avanzan en paralelo, nadie espera a que llegue una corrección. Todos pueden trabajar a la vez, con más conversación improvisada a medida que surgen preguntas.",[65,80,82],{"id":81},"pull-requests-listos-para-revisión-antes","Pull requests listos para revisión antes",[12,84,85],{},"Cuando tu rama se basa en la rama de un compañero, aprobar el pull request original es más fácil. Ya entiendes cómo se implementó la actividad de origen, y la rama original se ha probado y revisado durante la implementación. Ya no es territorio desconocido.",[41,87,89],{"id":88},"usar-pull-requests-encadenados-apilados","Usar pull requests encadenados (apilados)",[12,91,92],{},"Este nivel de concurrencia requiere las herramientas adecuadas. Con un sistema de control de versiones basado en Git, es sencillo. Los pasos siguientes describen el proceso.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Árbol de dependencias",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Árbol de dependencias (trabajar en 6 tareas dependientes al mismo tiempo)",[65,107,109],{"id":108},"delimitar-las-dependencias-con-claridad","Delimitar las dependencias con claridad",[12,111,112],{},"Define la cadena de dependencias durante la planificación del sprint. La cadena de pull requests seguirá exactamente esa definición. Cambiar la cadena a mitad del desarrollo es caro por el rebase.",[65,114,116],{"id":115},"empezar-por-las-tareas-raíz","Empezar por las tareas raíz",[12,118,119],{},"Toda cadena de dependencias tiene tareas raíz que no dependen de ninguna otra. Se puede empezar a trabajar en ellas desde el primer día.",[65,121,123],{"id":122},"implementar-primero-el-núcleo","Implementar primero el núcleo",[12,125,126],{},"Esto puede entrar en conflicto con el desarrollo guiado por pruebas, donde las pruebas van primero. Para mantener manejable la cadena de pull requests, implementa primero el núcleo. Así los miembros del equipo que dependen de esa funcionalidad obtienen acceso antes.",[65,128,130],{"id":129},"organizar-y-revisar-el-código-en-cola-fifo","Organizar y revisar el código en cola FIFO",[12,132,133],{},"La primera rama creada debe revisarse y fusionarse primero. Cada fusión activa la integración continua; si rompe la compilación principal, el problema se corrige mientras aún es pequeño.",[41,135,137],{"id":136},"la-sobrecarga","La sobrecarga",[12,139,140],{},"Mantener una cadena de ramas dependientes tiene ventajas, pero también algunos inconvenientes.",[65,142,144],{"id":143},"rebase-o-fusión","Rebase o fusión",[12,146,147],{},"La cadena debe mantenerse sincronizada, y eso requiere esfuerzo. Las herramientas modernas ofrecen sincronización con la rama base con un clic cuando no hay conflictos. Úsala cuando sea seguro incorporar los cambios de origen. Cuando la compilación esté en verde y la funcionalidad funcione, sincroniza.",[65,149,151],{"id":150},"trabajo-en-equipo","Trabajo en equipo",[12,153,154],{},"Una cadena de dependencias necesita un equipo colaborativo cuyos miembros estén dispuestos a hablar entre ellos. No funciona si cada persona trabaja aislada.",[12,156,157],{},"Las actividades dependientes es mejor mantenerlas fuera del sprint actual. Cuando las necesidades del negocio exigen que avancen en paralelo, una cadena de ramas derivadas es una forma práctica de gestionar la sobrecarga de dependencias.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Las actividades dependientes bloquean el sprint mientras el equipo espera. Los pull requests apilados mantienen el trabajo en marcha y reducen los tiempos muertos.","md","Gestionar dependencias de sprint con pull requests encadenados","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"dependencias de sprint","pull requests apilados","pull requests encadenados","revisión de código","entrega ágil","es",{},true,"\u002Fblog\u002Fes\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fes\u002Fmanage-sprint-dependencies-with-chained-pull-requests","AqD8Asnr6AohNB5JIj-OSwQXeC-vPJwDOvH3fg6sVjc",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":324,"description":325,"extension":182,"heading":326,"image":327,"imageAlt":213,"keywords":328,"locale":191,"meta":334,"navigation":193,"path":335,"reviewed":193,"seo":336,"sitemap":337,"slug":342,"stem":343,"translationKey":342,"__hash__":344},"blog\u002Fblog\u002Fes\u002Fcomparison-metrics-for-agile-teams.md","Métricas de comparación para equipos ágiles | AELBOX",{"type":9,"value":208,"toc":315},[209,216,219,223,226,233,237,241,244,248,251,259,263,271,275,278,281,288,292,295,302,305,309,312],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"Una regla, cartas de planning poker y una taza de café sobre una mesa",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"Comparar equipos ágiles es difícil, y merece la pena preguntarse por qué los comparamos. ¿En qué ayuda realmente comparar equipos de dominios distintos?",[41,220,222],{"id":221},"crear-una-competición","Crear una competición",[12,224,225],{},"Los equipos no deberían clasificarse entre sí con métricas arbitrarias. Eso solo desmotiva. En su lugar, las métricas deben dar a cada equipo la misma oportunidad de competir. Así el rendimiento mejora porque los equipos quieren, no porque alguien presione.",[12,227,228],{},[15,229],{"alt":222,"height":230,"loading":32,"src":231,"width":232,"decoding":34},487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,234,235],{},[38,236,222],{},[41,238,240],{"id":239},"las-métricas-para-crear-igualdad-de-oportunidades","Las métricas para crear igualdad de oportunidades",[12,242,243],{},"Aquí tienes cuatro métricas básicas para comparar equipos. Solo miden la capacidad de cada equipo para competir en igualdad de condiciones, nada más. Las métricas comparables crean igualdad de oportunidades.",[65,245,247],{"id":246},"sprints-exitosos","Sprints exitosos",[12,249,250],{},"Si un sprint fuera solo un marco temporal, no tendría sentido. Un sprint es un hito y necesita un objetivo. El objetivo del sprint (el conjunto de historias más importante) es el hito mayor; completar todas las historias es el menor. Celebra una demo entre equipos al final de cada sprint para que presenten lo que han entregado. Esa competición sana anima a los equipos a cumplir sus objetivos de sprint. Las personas necesitan un objetivo visible para motivarse.",[12,252,253],{},[15,254],{"alt":255,"height":256,"loading":32,"src":257,"width":258,"decoding":34},"Sprint hacia un objetivo",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,260,261],{},[38,262,255],{},[12,264,265,266,270],{},"¿Podría convertirse en un juego de comprometerse de más o de menos? Si un equipo se compromete de menos, la demo lo deja claro: hay menos que mostrar. Si se compromete de más, la demo se convierte en ",[267,268,269],"strong",{},"otro sprint fallido",". Entregar lo que el equipo se comprometió a hacer genera motivación para hacer más. Los equipos se sienten satisfechos con su trabajo.",[65,272,274],{"id":273},"estabilidad-de-la-velocidad-y-estimación-honesta","Estabilidad de la velocidad y estimación honesta",[12,276,277],{},"Esto es trabajo de conocimiento, no trabajo en cadena de montaje. Si nadie del equipo entiende un problema lo bastante bien como para estimar su solución, es que el problema no se investigó con antelación.",[12,279,280],{},"Un spike con tiempo limitado en el sprint anterior, seguido de una revisión de los hallazgos por todo el equipo, facilita dividir la implementación en historias más pequeñas y estimarlas bien. Para el trabajo complejo, escribe un documento de diseño técnico más completo que enumere las historias de implementación.",[12,282,283,284,53],{},"El spike y el diseño son en sí mismos historias que se pueden estimar. La clave es definir la estructura y la secuencia del trabajo de una solución compleja. En lugar de comprometerte con una historia que el equipo no entiende, crea una tarea de investigación para cubrir ese hueco. Así la estimación se ",[49,285,287],{"href":286},"\u002Fes\u002Fblog\u002Fsheepherding-story-points","basa en pruebas",[65,289,291],{"id":290},"previsibilidad-de-la-capacidad-evitar-trabajo-inesperado","Previsibilidad de la capacidad (evitar trabajo inesperado)",[12,293,294],{},"Primero viene la investigación; después, la implementación. A medida que la investigación descubre problemas, se crean y estiman nuevas actividades. Entonces tienes una imagen mucho más clara del siguiente sprint. El trabajo conocido se puede estimar y planificar; el desconocido recibe una actividad de investigación con tiempo limitado antes de estimarse. La disciplina consiste en dividir el trabajo grande en piezas pequeñas y estimables.",[12,296,297,298,53],{},"El trabajo complejo puede empezar antes, aunque solo sea para descubrir que necesita su propio conjunto de historias. Eso sigue reduciendo el ",[49,299,301],{"href":300},"\u002Fes\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","riesgo de lo desconocido",[12,303,304],{},"El soporte y la extinción de incendios en producción suelen gestionarse con un flujo Kanban con tiempo limitado fuera del sprint. Allí, el tiempo hasta la primera respuesta y los incumplimientos de SLA se convierten en las métricas de comparación.",[65,306,308],{"id":307},"disponibilidad-del-equipo-tiempo-dedicado-a-tareas-dividido-por-el-tiempo-total-del-sprint","Disponibilidad del equipo (tiempo dedicado a tareas dividido por el tiempo total del sprint)",[12,310,311],{},"La disponibilidad es la parte del tiempo que los miembros del equipo dedican al trabajo estimado. Si a un equipo lo apartan para formación, compartir conocimiento u otro trabajo interno con más frecuencia que a otros, corrige el desequilibrio. La única forma de mantener la velocidad estable es mantener la disponibilidad estable. Cuando la disponibilidad entre equipos es igual, las demás métricas de comparación funcionan.",[12,313,314],{},"Comparar equipos no consiste en castigar el bajo rendimiento, sino en aumentar la motivación y las ganas de competir y entregar más. Por eso esas métricas no deberían ser visibles para cada miembro del equipo: son una herramienta de acompañamiento, no una clasificación pública. Si haces seguimiento de estas métricas y guías a los Scrum Masters de forma indirecta, das a los equipos igualdad de condiciones para competir.",{"title":159,"searchDepth":160,"depth":160,"links":316},[317,318],{"id":221,"depth":160,"text":222},{"id":239,"depth":160,"text":240,"children":319},[320,321,322,323],{"id":246,"depth":166,"text":247},{"id":273,"depth":166,"text":274},{"id":290,"depth":166,"text":291},{"id":307,"depth":166,"text":308},"2018-05-04","Las métricas deben crear igualdad de condiciones, no una clasificación. Cuatro métricas que motivan a los equipos ágiles sin castigarlos.","Métricas de comparación para equipos ágiles","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[329,330,331,332,333],"métricas ágiles","velocidad del equipo","equipos ágiles","scrum","capacidad",{},"\u002Fblog\u002Fes\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":325},{"loc":335,"images":338,"lastmod":179},[339,340,341],{"loc":215},{"loc":231},{"loc":257},"comparison-metrics-for-agile-teams","blog\u002Fes\u002Fcomparison-metrics-for-agile-teams","WdHOYgMVSwRN8BtwXicIawSJ-onZIbX9gm0SVWOoCNQ",{"id":346,"title":347,"author":7,"body":348,"dateModified":179,"datePublished":486,"description":487,"extension":182,"heading":488,"image":489,"imageAlt":354,"keywords":490,"locale":191,"meta":495,"navigation":193,"path":496,"reviewed":193,"seo":497,"sitemap":498,"slug":506,"stem":507,"translationKey":506,"__hash__":508},"blog\u002Fblog\u002Fes\u002Fsheepherding-story-points.md","Efecto rebaño en planning poker: puntos de historia | AELBOX",{"type":9,"value":349,"toc":477},[350,356,359,363,370,378,382,386,389,392,399,403,406,410,413,418,422,426,429,436,440,444,447,452,456,460,471,474],[12,351,352],{},[15,353],{"alt":354,"height":18,"loading":19,"src":355,"width":21,"fetchPriority":22},"Un rebaño de ovejas y cartas de planning poker sobre una mesa de café","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,357,358],{},"La estimación con puntos de historia a menudo se descuida o se hace en chats y reuniones abiertas donde todos pueden ver u oír cada voto. Saber cómo votaron los demás distorsiona el resultado y produce estimaciones inexactas. Las estimaciones inexactas repetidas llevan a planes defectuosos y a entregas retrasadas o canceladas. Esto es lo que ocurre en una votación abierta.",[41,360,362],{"id":361},"los-personajes-de-la-votación","Los personajes de la votación",[12,364,365,366,369],{},"En una votación abierta aparecen varios personajes. La estimación depende de quién vota primero y suele estar lejos de ser honesta. ¿Por qué importa tanto el orden en una votación abierta? Por el ",[267,367,368],{},"efecto rebaño",": el sesgo de anclaje que hace que los demás copien la primera estimación.",[12,371,372],{},[15,373],{"alt":374,"height":375,"loading":32,"src":376,"width":377,"decoding":34},"El efecto rebaño",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,379,380],{},[38,381,374],{},[65,383,385],{"id":384},"la-persona-que-cree-saberlo-todo","La persona que cree saberlo todo",[12,387,388],{},"Todo equipo tiene al menos un miembro que cree conocer mejor el sistema. Suele votar primero, porque las respuestas le parecen obvias. A menudo pasa por alto detalles que pueden descarrilar la estimación. Esos detalles se pueden descubrir con antelación, pero solo si alguien provoca una conversación. Eso no ocurre en una votación abierta.",[12,390,391],{},"Esta persona suele votar por debajo de la estimación honesta. Quizá solo ella podría terminar la historia tan rápido, y solo con suerte.",[12,393,394],{},[15,395],{"alt":385,"height":396,"loading":32,"src":397,"width":398,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,400,401],{},[38,402,385],{},[12,404,405],{},"Los demás la siguen, así que la tarea parece fácil y factible para cualquiera en el tiempo asignado. En la práctica, suele acabarla otra persona.",[65,407,409],{"id":408},"la-persona-callada","La persona callada",[12,411,412],{},"Suele haber más de una y tienen miedo de votar primero. Esperan a que vote alguien más para copiar su voto. Rara vez participan en la conversación y responden solo cuando se les pregunta. Votan en segundo lugar, justo antes de las personas desganadas.",[12,414,415],{},[15,416],{"alt":409,"height":396,"loading":32,"src":417,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,419,420],{},[38,421,409],{},[65,423,425],{"id":424},"la-persona-desganada","La persona desganada",[12,427,428],{},"Son difíciles de localizar durante la implementación, pero su comportamiento es evidente al votar. Siempre votan al final y copian la estimación de otra persona. Si las estimaciones difieren, eligen la más común. No quieren explicar por qué eligieron un número más alto o más bajo, así que evitan colaborar en el refinamiento y esquivan las preguntas.",[12,430,431],{},[15,432],{"alt":425,"height":433,"loading":32,"src":434,"width":435,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,437,438],{},[38,439,425],{},[65,441,443],{"id":442},"la-persona-cansada","La persona cansada",[12,445,446],{},"Algunos miembros del equipo no pueden mantener la concentración durante mucho tiempo y se pierden partes clave de la conversación. Pierden el contexto y adivinan o buscan el voto más repetido para copiarlo.",[12,448,449],{},[15,450],{"alt":443,"height":396,"loading":32,"src":451,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,453,454],{},[38,455,443],{},[41,457,459],{"id":458},"cómo-mantener-la-atención-durante-la-estimación","Cómo mantener la atención durante la estimación",[12,461,462,463,467,468,470],{},"Estimar importa porque solo los puntos de historia honestos pueden ",[49,464,466],{"href":465},"\u002Fes\u002Fblog\u002Fcorrectly-estimating-release-deadline","mantener el proyecto en camino hacia su fecha de entrega",". La clave para estimar con honestidad es contrarrestar el ",[267,469,368],{},", tanto si usas cartas de papel como software.",[12,472,473],{},"Los miembros del equipo nunca deben ver las estimaciones de los demás hasta que el moderador las revele. Así la persona callada empieza a pensar, la desganada se interesa y la cansada se despierta. La mejor pregunta, sobre todo cuando alguien no coincide con el grupo, es «¿por qué votaste X puntos de historia?». Eso inicia una conversación sobre los problemas reales de implementación. Las preguntas cerradas del tipo «¿estarías de acuerdo con X puntos de historia?» invitan a un «sí» sin significado.",[12,475,476],{},"Una buena herramienta de estimación hace que el refinamiento sea más ameno y mantiene a todos alerta y dispuestos a hablar, de modo que incluso las historias complejas reciben mejores estimaciones.",{"title":159,"searchDepth":160,"depth":160,"links":478},[479,485],{"id":361,"depth":160,"text":362,"children":480},[481,482,483,484],{"id":384,"depth":166,"text":385},{"id":408,"depth":166,"text":409},{"id":424,"depth":166,"text":425},{"id":442,"depth":166,"text":443},{"id":458,"depth":160,"text":459},"2018-04-30","Las votaciones abiertas permiten que la primera estimación ancle al grupo. Descubre cómo el efecto rebaño distorsiona los puntos de historia y cómo estimar mejor.","Puntos de historia y efecto rebaño","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[491,492,493,368,494],"puntos de historia","planning poker","sesgo de anclaje","estimación ágil",{},"\u002Fblog\u002Fes\u002Fsheepherding-story-points",{"title":347,"description":487},{"loc":496,"images":499,"lastmod":179},[500,501,502,503,504,505],{"loc":355},{"loc":376},{"loc":397},{"loc":417},{"loc":434},{"loc":451},"sheepherding-story-points","blog\u002Fes\u002Fsheepherding-story-points","ZtlrrL6mbVt5yxvMqljvuiDgvZvJIJs_05FfzaAhn3I",{"id":510,"title":511,"author":7,"body":512,"dateModified":179,"datePublished":585,"description":586,"extension":182,"heading":587,"image":588,"imageAlt":518,"keywords":589,"locale":191,"meta":594,"navigation":193,"path":595,"reviewed":193,"seo":596,"sitemap":597,"slug":602,"stem":603,"translationKey":602,"__hash__":604},"blog\u002Fblog\u002Fes\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","La regla Scrumban del 10 % para cada sprint | AELBOX",{"type":9,"value":513,"toc":580},[514,521,529,533,536,544,548,552,555,559,562,565,573,577],[12,515,516],{},[15,517],{"alt":518,"height":519,"loading":19,"src":520,"width":21,"fetchPriority":22},"Cartas de planning poker y un tablero Kanban sobre una mesa de café",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,522,523,524,528],{},"Muchos equipos planifican usando exactamente la capacidad que muestra su plan de Jira. A menudo es un error y lleva a sprints fallidos. ¿Por qué ocurre si los ",[49,525,527],{"href":526},"\u002Fes\u002Fblog\u002Fthe-importance-of-predictable-velocity","cálculos de capacidad"," parecen tan precisos?",[41,530,532],{"id":531},"la-prisa-por-entregar-más","La prisa por entregar más",[12,534,535],{},"Los Product Owners tienden a presionar para aumentar la velocidad después de cada sprint exitoso, una reacción natural a los últimos resultados. Si el equipo completó cierta cantidad de puntos de historia el sprint pasado, se espera que complete más en el siguiente. Esto se repite hasta que un sprint falla. La presión es un intento de probar los límites del equipo. En nuestra experiencia, es contraproducente. Al final desmotiva al equipo, que llega a ver cada sprint futuro como abocado al fracaso.",[12,537,538],{},[15,539],{"alt":540,"height":541,"loading":32,"src":542,"width":543,"decoding":34},"El sprint condenado",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,545,546],{},[38,547,540],{},[41,549,551],{"id":550},"el-final-caótico-de-un-sprint-durante-una-entrega-urgente","El final caótico de un sprint durante una entrega urgente",[12,553,554],{},"Cuando la capacidad se planifica para llenar el sprint exactamente, cualquier retraso o riesgo materializado genera presión para trabajar a un ritmo frenético al final. El equipo entrega menos de lo prometido porque el estrés se apodera de él. Esa prisa de final de sprint debe eliminarse.",[41,556,558],{"id":557},"deja-que-el-equipo-entregue-más-por-voluntad-propia","Deja que el equipo entregue más por voluntad propia",[12,560,561],{},"Planifica solo el 90 % de la capacidad del equipo y reserva el 10 % restante para trabajo no planificado del backlog. Esas tareas se extraen del backlog al estilo Scrumban durante el sprint. El colchón absorbe riesgo y permite al equipo terminar el sprint, o al menos el objetivo del sprint, unos días antes. Si una dependencia externa amenaza el sprint, una tarea del colchón puede sustituir a la problemática.",[12,563,564],{},"Ese 10 % no forma parte del compromiso del sprint. Si el riesgo no se materializa, el equipo lo entrega como trabajo extra; si algo va mal, se consume el colchón, pero el objetivo y el compromiso del sprint se siguen cumpliendo. Vigila cuánto colchón se usa: si llega habitualmente al 20 %, por ejemplo, es momento de aumentar la velocidad del equipo un 10 % manteniendo el colchón del 10 %.",[12,566,567],{},[15,568],{"alt":569,"height":570,"loading":32,"src":571,"width":572,"decoding":34},"Entregar antes, entregar extra",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,574,575],{},[38,576,569],{},[12,578,579],{},"Nuestra experiencia muestra que es cuando los empleados trabajan sin presión y más aportan. La velocidad puede aumentar entonces al ritmo del equipo, sin presión externa y con menos estrés. El aumento resulta natural y sostenible.",{"title":159,"searchDepth":160,"depth":160,"links":581},[582,583,584],{"id":531,"depth":160,"text":532},{"id":550,"depth":160,"text":551},{"id":557,"depth":160,"text":558},"2018-04-28","Comprometer toda la capacidad hace frágil cada sprint. Un colchón Scrumban del 10 % absorbe riesgo, protege el objetivo del sprint y deja crecer la velocidad.","La regla Scrumban del 10 % para cada sprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[590,591,592,593,332],"scrumban","capacidad del sprint","colchón ágil","velocidad",{},"\u002Fblog\u002Fes\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":511,"description":586},{"loc":595,"images":598,"lastmod":179},[599,600,601],{"loc":520},{"loc":542},{"loc":571},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fes\u002Fthe-10-percent-scrumban-rule-for-every-sprint","tcXkBSEA-vIlxuY0VDC4qzovw2LrbiQLmFmR_gnZEjc",{"id":606,"title":607,"author":7,"body":608,"dateModified":179,"datePublished":786,"description":787,"extension":182,"heading":788,"image":789,"imageAlt":614,"keywords":790,"locale":191,"meta":794,"navigation":193,"path":795,"reviewed":193,"seo":796,"sitemap":797,"slug":805,"stem":806,"translationKey":805,"__hash__":807},"blog\u002Fblog\u002Fes\u002Fcorrectly-estimating-release-deadline.md","Cómo estimar la fecha de entrega con puntos de historia | AELBOX",{"type":9,"value":609,"toc":772},[610,616,619,623,630,634,637,645,649,653,656,659,663,666,674,679,683,686,690,693,697,700,707,712,716,719,723,726,734,738,742,745,750,757,765,769],[12,611,612],{},[15,613],{"alt":614,"height":18,"loading":19,"src":615,"width":21,"fetchPriority":22},"Cartas de planning poker, un diagrama de Gantt y una taza de café sobre una mesa","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,617,618],{},"Una parte importante de la gestión de proyectos es estimar la fecha de entrega. Pero ¿cómo predecir cuándo se entregará un sistema grande y complejo?",[41,620,622],{"id":621},"los-problemas-de-la-estimación","Los problemas de la estimación",[12,624,625,626,629],{},"Para entregar a tiempo, necesitas una estimación fiable del trabajo. ",[49,627,628],{"href":526},"Estimar tareas suele ser difícil",", sobre todo cuando debes comprometerte con estimaciones de tiempo para cada tarea. Psicológicamente, comprometerse con una fecha de finalización es duro, y esos compromisos a menudo fallan.",[65,631,633],{"id":632},"el-problema-del-tiempo","El problema del tiempo",[12,635,636],{},"Estimar tiempo es problemático por una razón sencilla: cuanto más compleja es la tarea, mayor es la probabilidad de incumplir el plazo. También depende de quién recoja la tarea. Los miembros del equipo trabajan a ritmos distintos y entregan cantidades distintas de trabajo. Como la disponibilidad cambia con las vacaciones y la formación, una tarea estimada por la persona más rápida puede acabar en manos de la más lenta. El ordenado diagrama de Gantt se convierte en un desastre: las tareas se retrasan y la dirección se preocupa constantemente por si el proyecto terminará a tiempo.",[12,638,639],{},[15,640],{"alt":641,"height":642,"loading":32,"src":643,"width":644,"decoding":34},"Diagrama de Gantt roto",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,646,647],{},[38,648,641],{},[65,650,652],{"id":651},"la-resistencia-a-las-estimaciones-de-tiempo","La resistencia a las estimaciones de tiempo",[12,654,655],{},"Cuando se pide una estimación a quienes implementan, a menudo se resisten: si no se cumple, ¿de quién es la culpa? Y si una tarea estimada por una persona acaba en manos de otra, ¿a quién se culpa cuando el tiempo real no coincide?",[12,657,658],{},"El resultado es la reticencia a estimar, lo que dificulta que la dirección estime bien las fechas de entrega.",[41,660,662],{"id":661},"usar-puntos-de-historia","Usar puntos de historia",[12,664,665],{},"Los puntos de historia son una alternativa a las estimaciones por tiempo. Un punto de historia no es una unidad fija de trabajo; es una estimación relativa que crece de forma exponencial. Todo el equipo estima junto durante el refinamiento.",[12,667,668],{},[15,669],{"alt":670,"height":671,"loading":32,"src":672,"width":673,"decoding":34},"Ejemplo de puntos de historia",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,675,676],{},[38,677,678],{},"Ejemplo de estimaciones",[65,680,682],{"id":681},"compartir-la-responsabilidad","Compartir la responsabilidad",[12,684,685],{},"Con puntos de historia, todo el equipo estima cada tarea. La estimación se acepta cuando todos están de acuerdo. Eso evita discusiones posteriores sobre quién la estimó y cuánto tardó realmente. El equipo acordó desde el principio, así que la responsabilidad es compartida.",[65,687,689],{"id":688},"estimar-la-complejidad","Estimar la complejidad",[12,691,692],{},"Los puntos de historia capturan la complejidad de una tarea, incluidas sus dependencias externas y el riesgo de que algo salga mal. Como no son un compromiso con una métrica física como el tiempo, al equipo le resulta más fácil darlos.",[65,694,696],{"id":695},"la-estimación-más-pequeña","La estimación más pequeña",[12,698,699],{},"Como los puntos de historia son relativos, necesitas un ancla para empezar. El ancla es la unidad de trabajo más pequeña que requiere algo de esfuerzo de implementación. Es la menor cantidad de trabajo que el equipo puede estimar.",[12,701,702],{},[15,703],{"alt":696,"height":704,"loading":32,"src":705,"width":706,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,708,709],{},[38,710,711],{},"La estimación más baja",[65,713,715],{"id":714},"la-estimación-más-grande","La estimación más grande",[12,717,718],{},"Los puntos de historia crecen de forma exponencial para mostrar que cuanto más compleja es una tarea, más difícil es estimarla. La escala puede llegar hasta el infinito (∞), aunque esa estimación rara vez se usa. La estimación más grande debería ser la mayor cantidad de trabajo que una persona puede completar en un sprint de media. La duración del sprint debe coincidir con la mayor cantidad de trabajo que una persona puede asumir sin perder el control de la tarea.",[65,720,722],{"id":721},"las-historias-más-grandes-que-la-estimación-más-grande","Las historias más grandes que la estimación más grande",[12,724,725],{},"Algunas tareas reciben más puntos de historia de los que una persona puede completar en un sprint. Incluirlas en un sprint provoca arrastre. El trabajo arrastrado hace que el sprint parezca incompleto y el trabajo, inacabado. Las tareas estimadas por encima de ese límite deben dividirse en unidades más pequeñas y volver a estimarse.",[12,727,728],{},[15,729],{"alt":730,"height":731,"loading":32,"src":732,"width":733,"decoding":34},"Dividir 13 puntos de historia",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,735,736],{},[38,737,730],{},[41,739,741],{"id":740},"la-velocidad-en-puntos-de-historia","La velocidad en puntos de historia",[12,743,744],{},"La velocidad es el número medio de puntos de historia que un equipo completa en un sprint con disponibilidad plena. La disponibilidad es la parte del sprint que el equipo puede dedicar realmente al trabajo del proyecto después de vacaciones, formación y soporte. La capacidad es la velocidad multiplicada por la disponibilidad.",[12,746,747],{},[38,748,749],{},"capacidad = velocidad × disponibilidad",[12,751,752,753,756],{},"Como la capacidad se expresa en puntos de historia, se puede convertir en tiempo usando la ratio entre puntos de historia y tiempo del equipo. Cuando ",[49,754,755],{"href":526},"la velocidad es predecible",", la fecha de entrega se puede estimar con precisión. A partir de los puntos de historia y los sprints, el diagrama de Gantt resultante es estable y predecible:",[12,758,759],{},[15,760],{"alt":761,"height":762,"loading":32,"src":763,"width":764,"decoding":34},"Diagrama de Gantt corregido",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,766,767],{},[38,768,761],{},[12,770,771],{},"Ese es el cambio: cuando la velocidad es estable, la fecha de entrega pasa a ser un cálculo y no una incógnita.",{"title":159,"searchDepth":160,"depth":160,"links":773},[774,778,785],{"id":621,"depth":160,"text":622,"children":775},[776,777],{"id":632,"depth":166,"text":633},{"id":651,"depth":166,"text":652},{"id":661,"depth":160,"text":662,"children":779},[780,781,782,783,784],{"id":681,"depth":166,"text":682},{"id":688,"depth":166,"text":689},{"id":695,"depth":166,"text":696},{"id":714,"depth":166,"text":715},{"id":721,"depth":166,"text":722},{"id":740,"depth":160,"text":741},"2018-04-14","Las estimaciones por tiempo fallan cuando cambian la complejidad y la disponibilidad. Los puntos de historia y la velocidad hacen predecibles las fechas.","Cómo estimar la fecha de entrega","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[791,491,494,792,793],"fecha de entrega","velocidad del sprint","planificación de capacidad",{},"\u002Fblog\u002Fes\u002Fcorrectly-estimating-release-deadline",{"title":607,"description":787},{"loc":795,"images":798,"lastmod":179},[799,800,801,802,803,804],{"loc":615},{"loc":643},{"loc":672},{"loc":705},{"loc":732},{"loc":763},"correctly-estimating-release-deadline","blog\u002Fes\u002Fcorrectly-estimating-release-deadline","S78rksJKgz2yzGChyE21L9D7yZV7XtgKuxeuruG36ZI",{"id":809,"title":810,"author":7,"body":811,"dateModified":179,"datePublished":786,"description":957,"extension":182,"heading":958,"image":959,"imageAlt":817,"keywords":960,"locale":191,"meta":964,"navigation":193,"path":965,"reviewed":193,"seo":966,"sitemap":967,"slug":973,"stem":974,"translationKey":973,"__hash__":975},"blog\u002Fblog\u002Fes\u002Fthe-importance-of-predictable-velocity.md","Velocidad predecible: compromisos de sprint fiables | AELBOX",{"type":9,"value":812,"toc":947},[813,819,822,826,829,832,835,843,847,851,854,858,861,864,871,878,882,886,889,892,895,898,902,905,908,915,919,923,931,934,938,944],[12,814,815],{},[15,816],{"alt":817,"height":18,"loading":19,"src":818,"width":21,"fetchPriority":22},"Cartas de planning poker y un cronómetro sobre una mesa de café","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,820,821],{},"La velocidad predecible es la capacidad de saber de antemano cuánto trabajo completará un equipo en un periodo determinado, según su disponibilidad.",[41,823,825],{"id":824},"el-problema-de-una-velocidad-variable","El problema de una velocidad variable",[12,827,828],{},"Cuando la velocidad varía entre sprints, planificar una entrega se vuelve difícil. Nadie sabe cuándo se entregará el trabajo y todo el proceso Scrum se rompe. El caos se apodera del equipo, y eso no ayuda a la moral.",[12,830,831],{},"La velocidad variable suele ocurrir porque los miembros del equipo intentan dar lo mejor de sí y se comprometen a más de lo que pueden entregar. En un entorno colaborativo con un proceso de desarrollo bien definido, una tarea es más que una implementación directa. Algunos tienen suerte y reciben tareas relativamente sencillas, mientras que otros se topan con un problema que nadie había previsto. En un sprint la velocidad parece alta porque el equipo está terminando trabajo arrastrado; en el siguiente baja porque aparecen nuevos arrastres.",[12,833,834],{},"El trabajo arrastrado da la impresión de que el equipo rinde por debajo de lo esperado: podría hacer más, pero siempre surge algo imprevisible. La dirección nota el problema, ve los plazos incumplidos y la tensión crece entre los miembros del equipo.",[12,836,837],{},[15,838],{"alt":839,"height":840,"loading":32,"src":841,"width":842,"decoding":34},"Sprint normal con trabajo arrastrado",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,844,845],{},[38,846,839],{},[41,848,850],{"id":849},"los-problemas-habituales-para-mantener-la-previsibilidad","Los problemas habituales para mantener la previsibilidad",[12,852,853],{},"Los problemas varían según el proyecto, pero muchos son comunes a todos los tipos de proyecto. Estos son los habituales, con soluciones prácticas.",[65,855,857],{"id":856},"espera-lo-inesperado","Espera lo inesperado",[12,859,860],{},"Algunas tareas necesitan investigación antes de empezar. Imagina una funcionalidad que depende de una empresa externa que puede no responder cuando la necesitas. O una funcionalidad que no se puede implementar según lo previsto porque el equipo malinterpretó la tecnología subyacente al crear la tarea.",[12,862,863],{},"Si esa tarea se añade a un sprint sin la investigación necesaria, es probable que tarde más de lo esperado y que la culpa recaiga en la estimación. Algunos dirán que hace falta un spike para investigar el tema primero. Pero ¿cómo saber qué tareas necesitan uno?",[12,865,866,867,870],{},"La única forma es empezar a ",[49,868,869],{"href":300},"trabajar en la tarea con antelación",". Empezar antes de que la tarea esté planificada permite encontrar problemas antes de que ocurran. Con ese enfoque, una tarea entra en un sprint solo cuando está clara y parte del trabajo ya está hecho.",[12,872,873],{},[15,874],{"alt":875,"height":840,"loading":32,"src":876,"width":877,"decoding":34},"Sprints con tareas empezadas con antelación","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,879,880],{},[38,881,875],{},[65,883,885],{"id":884},"evita-definiciones-imprecisas","Evita definiciones imprecisas",[12,887,888],{},"Algunas tareas parecen aceptables para quien las crea, pero omiten detalles importantes. Hay detalles de implementación que pueden afectar seriamente a la entrega.",[12,890,891],{},"Las partes interesadas del negocio pueden defender que una definición de tarea no incluya detalles técnicos, pero quienes implementan suelen encontrar los requisitos demasiado vagos para actuar.",[12,893,894],{},"La solución es un documento de diseño técnico al que haga referencia la tarea de implementación. Así queda claro qué hay que construir exactamente.",[12,896,897],{},"También ayuda incluir detalles técnicos en la descripción de la tarea, para que quienes implementan sepan qué hacer y detecten posibles problemas a tiempo.",[65,899,901],{"id":900},"reduce-la-capacidad-con-la-secuencia-de-fibonacci","Reduce la capacidad con la secuencia de Fibonacci",[12,903,904],{},"A veces los miembros del equipo se van de vacaciones o cae un día festivo dentro del sprint. La formación y los eventos internos también reducen la disponibilidad: el tiempo que el equipo puede dedicar al trabajo del proyecto. En ese caso, hay que reducir la capacidad para reflejar las personas ausentes.",[12,906,907],{},"La velocidad se considera constante, pero se calcula a partir de la velocidad media de todo el equipo. Para simplificar, supón que una persona completa un punto de historia al día. Si falta una persona un día, reduce la capacidad del sprint en un punto de historia. Si faltan dos personas dos días (cuatro puntos de historia), reduce la capacidad en cinco puntos de historia (el siguiente número de Fibonacci) en lugar de cuatro. Si faltan dos personas tres días, reduce la capacidad en ocho puntos en lugar de seis, para tener en cuenta el riesgo de dependencias.",[12,909,910],{},[15,911],{"alt":912,"height":840,"loading":32,"src":913,"width":914,"decoding":34},"Comprometer menos capacidad de la calculada","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,916,917],{},[38,918,912],{},[65,920,922],{"id":921},"evita-las-tareas-dependientes","Evita las tareas dependientes",[12,924,925,926,930],{},"A menudo, una persona completa una tarea de la que depende la tarea de otro miembro del equipo. Esto crea ",[49,927,929],{"href":928},"\u002Fes\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","dependencias dentro del equipo o entre equipos",". Si la primera tarea se retrasa, todas las tareas dependientes se retrasan. El equipo queda inactivo y luego corre cuando la dependencia se desbloquea, desperdiciando tiempo valioso.",[12,932,933],{},"Las tareas dependientes pueden empezar antes, de modo que para el siguiente sprint las tareas críticas de origen estén casi terminadas. Eso reduce el impacto de la dependencia en la velocidad del sprint actual.",[65,935,937],{"id":936},"estima-con-honestidad","Estima con honestidad",[12,939,940,943],{},[49,941,942],{"href":286},"Estimar las tareas con honestidad"," es difícil y requiere la atención de todo el equipo. Cada persona debe estimar sin dejarse influir por las estimaciones de los demás. Solo las estimaciones honestas muestran cuánto tardará realmente una épica y mantienen las fechas de entrega realistas.",[12,945,946],{},"La velocidad predecible no es una herramienta ni una métrica que se impone a un equipo; es el resultado de eliminar sorpresas una a una. Empieza con los cinco ajustes anteriores y la fecha de entrega dejará de ser una incógnita.",{"title":159,"searchDepth":160,"depth":160,"links":948},[949,950],{"id":824,"depth":160,"text":825},{"id":849,"depth":160,"text":850,"children":951},[952,953,954,955,956],{"id":856,"depth":166,"text":857},{"id":884,"depth":166,"text":885},{"id":900,"depth":166,"text":901},{"id":921,"depth":166,"text":922},{"id":936,"depth":166,"text":937},"Por qué la velocidad cambia entre sprints y cómo hacer que los compromisos sean predecibles: cinco ajustes para planificación, capacidad y dependencias.","La importancia de una velocidad predecible","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[961,962,494,491,963],"velocidad predecible","velocidad de sprint","planificación de entregas",{},"\u002Fblog\u002Fes\u002Fthe-importance-of-predictable-velocity",{"title":810,"description":957},{"loc":965,"images":968,"lastmod":179},[969,970,971,972],{"loc":818},{"loc":841},{"loc":876},{"loc":913},"the-importance-of-predictable-velocity","blog\u002Fes\u002Fthe-importance-of-predictable-velocity","1MOn8oT1sRvmf7N0kPLDXhLdzeul9HUxbkM4NsBaJt4",1795345545810]