[{"data":1,"prerenderedAt":975},["ShallowReactive",2],{"blog-index-da":3},[4,204,345,509,605,808],{"id":5,"title":6,"author":7,"body":8,"dateModified":179,"datePublished":180,"description":181,"extension":182,"heading":183,"image":184,"imageAlt":17,"keywords":185,"locale":191,"meta":192,"navigation":193,"path":194,"reviewed":193,"seo":195,"sitemap":196,"slug":201,"stem":202,"translationKey":201,"__hash__":203},"blog\u002Fblog\u002Fda\u002Fmanage-sprint-dependencies-with-chained-pull-requests.md","Sprintafhængigheder og kædede pull requests | AELBOX","AELBOX",{"type":9,"value":10,"toc":158},"minimark",[11,23,26,35,40,45,54,57,61,64,69,72,76,79,83,86,90,93,101,106,110,113,117,120,124,127,131,134,138,141,145,148,152,155],[12,13,14],"p",{},[15,16],"img",{"alt":17,"height":18,"loading":19,"src":20,"width":21,"fetchPriority":22},"En metalkæde, planning poker-kort og en kaffekop på et bord",960,"eager","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.webp",1600,"high",[12,24,25],{},"Sprints indeholder ofte afhængige emner, enten inden for ét team eller på tværs af flere Scrum-teams. I en perfekt verden ville afhængigheder ikke findes; i praksis vinder forretningsbehovene, og afhængigheder tilføjes for at forkorte releasecyklussen. Denne artikel beskriver én måde at håndtere afhængige opgaver i softwareteams.",[12,27,28],{},[15,29],{"alt":30,"height":31,"loading":32,"src":33,"width":31,"decoding":34},"Afhængigheder mellem opgaver",336,"lazy","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fblog-dep1.png","async",[12,36,37],{},[38,39,30],"em",{},[41,42,44],"h2",{"id":43},"den-gammeldags-måde","Den gammeldags måde",[12,46,47,48,53],{},"Den ligetil tilgang er at starte en opgave, så snart dens afhængighed er flettet ind i main-grenen. Med den tilgang sidder nogle teammedlemmer ledige, indtil en opgave er klar. Til sidst er der lidt eller ingen tid tilbage til de resterende afhængige opgaver. De sidste opgaver overføres, og ",[49,50,52],"a",{"href":51},"\u002Fda\u002Fblog\u002Fcomparison-metrics-for-agile-teams","teamet er utilfreds",".",[12,55,56],{},"Hvorfor sker det, selv om kapaciteten er estimeret korrekt? Det sker mest på grund af ledig tid, mens man venter på, at kollegerne bliver færdige. Selv små forsinkelser hober sig op, især i korte sprints.",[41,58,60],{"id":59},"arbejd-på-afhængige-opgaver-samtidig","Arbejd på afhængige opgaver samtidig",[12,62,63],{},"Der er en måde at gøre dette på med et lille overhead. Når teammedlemmer arbejder på opgaver samtidig, er der flere fordele.",[65,66,68],"h3",{"id":67},"bedre-samarbejde","Bedre samarbejde",[12,70,71],{},"Når teammedlemmer arbejder samtidig på afhængige opgaver, ligner det pair programming. Én person skal forstå den opstrøms opgave; den anden skal forstå den nedstrøms opgave. Teamet får bredere viden om de problemer, der løses.",[65,73,75],{"id":74},"undgå-den-ledige-tid","Undgå den ledige tid",[12,77,78],{},"Når opgaver kører samtidig, venter ingen på, at en rettelse lander. Alle kan arbejde på én gang med mere ad hoc-diskussion, efterhånden som spørgsmålene dukker op.",[65,80,82],{"id":81},"pull-requests-klar-til-code-review-tidligere","Pull requests klar til code review tidligere",[12,84,85],{},"Når din gren er baseret på en kollegas gren, er det lettere at godkende den oprindelige pull request. Du forstår allerede, hvordan det opstrøms emne blev implementeret, og den oprindelige gren er blevet testet og gennemgået gennem hele implementeringen. Det er ikke længere ukendt territorium.",[41,87,89],{"id":88},"brug-af-kædede-stablede-pull-requests","Brug af kædede (stablede) pull requests",[12,91,92],{},"Det her niveau af samtidighed kræver de rigtige værktøjer. Med Git-baseret versionskontrol er det ligetil. Trinene nedenfor beskriver processen.",[12,94,95],{},[15,96],{"alt":97,"height":98,"loading":32,"src":99,"width":100,"decoding":34},"Afhængighedstræ",438,"\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fdep-img2.png",800,[12,102,103],{},[38,104,105],{},"Afhængighedstræ (arbejde på 6 afhængige opgaver samtidig)",[65,107,109],{"id":108},"skitsér-afhængighederne-klart","Skitsér afhængighederne klart",[12,111,112],{},"Definér afhængighedskæden under sprintplanlægningen. Pull request-kæden følger derefter den definition præcist. Det er dyrt at ændre kæden midt i udviklingen på grund af rebasing.",[65,114,116],{"id":115},"start-med-rodopgaverne","Start med rodopgaverne",[12,118,119],{},"Hver afhængighedskæde har rodopgaver, der ikke afhænger af noget andet. Arbejdet med dem kan starte på dag ét.",[65,121,123],{"id":122},"lav-kerneimplementeringen-først","Lav kerneimplementeringen først",[12,125,126],{},"Det kan være i konflikt med testdrevet udvikling, hvor testene kommer først. For at holde pull request-kæden håndterbar skal du implementere kernen først. Det giver de afhængige teammedlemmer adgang tidligere.",[65,128,130],{"id":129},"organisér-og-gennemgå-kode-i-en-fifo-kø","Organisér og gennemgå kode i en FIFO-kø",[12,132,133],{},"Den første gren, der oprettes, bør gennemgås og flettes først. Hver fletning udløser CI; hvis den bryder main-builden, rettes problemet, mens det stadig er småt.",[41,135,137],{"id":136},"overheadet","Overheadet",[12,139,140],{},"At vedligeholde en kæde af afhængige grene har fordele, men også ulemper.",[65,142,144],{"id":143},"rebasing-eller-fletning","Rebasing eller fletning",[12,146,147],{},"Kæden skal holdes synkroniseret, hvilket kræver indsats. Moderne værktøjer tilbyder synkronisering med ét klik med basisgrenen, når der ikke er konflikter. Brug det efter behov, når det er sikkert at hente ændringer opstrøms. Når builden er grøn, og funktionen virker, synkroniserer du.",[65,149,151],{"id":150},"teamwork","Teamwork",[12,153,154],{},"En afhængighedskæde kræver et samarbejdende team, hvis medlemmer er villige til at tale sammen. Det kan ikke fungere, hvis folk arbejder isoleret.",[12,156,157],{},"Afhængige emner holdes bedst ude af den aktuelle sprint. Når forretningsbehov kræver, at de kører parallelt, er en kæde af afledte grene en praktisk måde at håndtere afhængigheds-overheadet på.",{"title":159,"searchDepth":160,"depth":160,"links":161},"",2,[162,163,169,175],{"id":43,"depth":160,"text":44},{"id":59,"depth":160,"text":60,"children":164},[165,167,168],{"id":67,"depth":166,"text":68},3,{"id":74,"depth":166,"text":75},{"id":81,"depth":166,"text":82},{"id":88,"depth":160,"text":89,"children":170},[171,172,173,174],{"id":108,"depth":166,"text":109},{"id":115,"depth":166,"text":116},{"id":122,"depth":166,"text":123},{"id":129,"depth":166,"text":130},{"id":136,"depth":160,"text":137,"children":176},[177,178],{"id":143,"depth":166,"text":144},{"id":150,"depth":166,"text":151},"2026-11-21","2018-05-27","Afhængige emner standser sprinten, mens folk venter. Se hvordan stablede pull requests holder arbejdet i gang og reducerer den ledige tid i sprinten.","md","Håndtering af sprintafhængigheder med kædede pull requests","\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests\u002Fcoffee-table-chain.jpg",[186,187,188,189,190],"sprintafhængigheder","stablede pull requests","kædede pull requests","code review","agil levering","da",{},true,"\u002Fblog\u002Fda\u002Fmanage-sprint-dependencies-with-chained-pull-requests",{"title":6,"description":181},{"loc":194,"images":197,"lastmod":179},[198,199,200],{"loc":20},{"loc":33},{"loc":99},"manage-sprint-dependencies-with-chained-pull-requests","blog\u002Fda\u002Fmanage-sprint-dependencies-with-chained-pull-requests","RpeACS19O1NaXDODCddgLGn_2jS4slXN__xOkravTws",{"id":205,"title":206,"author":7,"body":207,"dateModified":179,"datePublished":324,"description":325,"extension":182,"heading":326,"image":327,"imageAlt":213,"keywords":328,"locale":191,"meta":334,"navigation":193,"path":335,"reviewed":193,"seo":336,"sitemap":337,"slug":342,"stem":343,"translationKey":342,"__hash__":344},"blog\u002Fblog\u002Fda\u002Fcomparison-metrics-for-agile-teams.md","Metrikker til sammenligning af agile teams | AELBOX",{"type":9,"value":208,"toc":315},[209,216,219,223,226,233,237,241,244,248,251,259,263,271,275,278,281,288,292,295,302,305,309,312],[12,210,211],{},[15,212],{"alt":213,"height":214,"loading":19,"src":215,"width":21,"fetchPriority":22},"En lineal, planning poker-kort og en kaffekop på et bord",958,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.webp",[12,217,218],{},"At sammenligne agile teams er svært, og det er værd at spørge, hvorfor vi sammenligner dem overhovedet. Hvordan hjælper det egentlig at sammenligne teams i forskellige domæner?",[41,220,222],{"id":221},"skab-en-konkurrence","Skab en konkurrence",[12,224,225],{},"Teams bør ikke rangeres mod hinanden efter vilkårlige metrikker. Det demotiverer kun folk. I stedet bør metrikker give hvert team lige muligheder for at konkurrere. Præstationen bliver så bedre, fordi teamene vil det, ikke fordi nogen presser på.",[12,227,228],{},[15,229],{"alt":222,"height":230,"loading":32,"src":231,"width":232,"decoding":34},487,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun2.png",525,[12,234,235],{},[38,236,222],{},[41,238,240],{"id":239},"metrikkerne-der-skaber-lige-muligheder","Metrikkerne, der skaber lige muligheder",[12,242,243],{},"Her er fire grundlæggende metrikker til at sammenligne teams. De måler hvert teams evne til at konkurrere på lige vilkår, ikke andet. Sammenlignelige metrikker skaber lige muligheder.",[65,245,247],{"id":246},"vellykkede-sprints","Vellykkede sprints",[12,249,250],{},"Hvis en sprint kun var en tidsramme, ville den ikke tjene noget formål. En sprint er en milepæl og har brug for et mål. Sprintmålet (det vigtigste sæt historier) er den største milepæl; at færdiggøre hver historie er den mindste. Hold en demo på tværs af teams i slutningen af hver sprint, hvor teamene viser, hvad de leverede. Den sunde konkurrence tilskynder teams til at færdiggøre deres sprintmål. Folk har brug for et synligt mål for at blive motiverede.",[12,252,253],{},[15,254],{"alt":255,"height":256,"loading":32,"src":257,"width":258,"decoding":34},"Sprint mod et mål",680,"\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Frun1.png",874,[12,260,261],{},[38,262,255],{},[12,264,265,266,270],{},"Kan det udvikle sig til et spil med over- og underforpligtelse? Hvis et team forpligter sig til for lidt, gør demon det tydeligt: der er mindre at vise. Hvis det forpligter sig til for meget, bliver demon ",[267,268,269],"strong",{},"endnu en mislykket sprint",". At levere det, teamet forpligtede sig til, opbygger motivationen til at gøre mere. Teamene føler sig tilfredse med arbejdet.",[65,272,274],{"id":273},"hastighedsstabilitet-og-ærlig-estimering","Hastighedsstabilitet og ærlig estimering",[12,276,277],{},"Det her er vidensarbejde, ikke samlebåndsarbejde. Hvis ingen i teamet forstår et problem godt nok til at estimere løsningen, er problemet ikke blevet undersøgt på forhånd.",[12,279,280],{},"En tidsafgrænset spike i den forrige sprint, efterfulgt af en gennemgang af resultaterne i teamet, gør det nemt at opdele implementeringen i mindre historier og estimere dem ordentligt. Til komplekst arbejde kan du skrive et fyldigere teknisk designdokument, der oplister implementeringshistorierne.",[12,282,283,284,53],{},"Spiken og designarbejdet er selv historier, der kan estimeres. Nøglen er at definere strukturen og rækkefølgen af arbejdet for en kompleks løsning. I stedet for at forpligte sig til en historie, teamet ikke forstår, kan du oprette en researchopgave, der dækker hullet. Så er estimeringen ",[49,285,287],{"href":286},"\u002Fda\u002Fblog\u002Fsheepherding-story-points","forankret i evidens",[65,289,291],{"id":290},"forudsigelig-kapacitet-undgå-uventet-arbejde","Forudsigelig kapacitet (undgå uventet arbejde)",[12,293,294],{},"Research kommer først; implementeringen følger. Når researchen afdækker problemer, oprettes og estimeres nye emner. Du har så et meget klarere billede af næste sprint. Kendt arbejde kan estimeres og planlægges; ukendt arbejde får et tidsafgrænset researchemne, før det estimeres. Disciplinen er at opdele stort arbejde i små, estimerbare stykker.",[12,296,297,298,53],{},"Komplekst arbejde kan starte tidligt, selv om det kun er for at opdage, at det har brug for sit eget sæt historier. Det reducerer stadig ",[49,299,301],{"href":300},"\u002Fda\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint","risikoen ved det ukendte",[12,303,304],{},"Support og brandslukning i produktionen kører som regel i et tidsafgrænset Kanban-flow uden for sprinten. Dér bliver metrikkerne tiden til første svar og brud på SLA.",[65,306,308],{"id":307},"teamets-tilgængelighed-tid-brugt-på-opgaver-divideret-med-den-samlede-tid-i-en-sprint","Teamets tilgængelighed (tid brugt på opgaver divideret med den samlede tid i en sprint)",[12,310,311],{},"Tilgængelighed er den andel af tiden, teammedlemmerne bruger på estimeret arbejde. Hvis et team oftere end andre bliver trukket ind i uddannelse, videndeling eller andet internt arbejde, skal ubalancen rettes. Den eneste måde at holde hastigheden stabil på er at holde tilgængeligheden stabil. Når tilgængeligheden er ens mellem teams, virker de andre sammenligningsmetrikker.",[12,313,314],{},"At sammenligne teams handler ikke om at straffe lav præstation, men om at øge motivationen og lysten til at konkurrere og levere mere. Derfor bør de metrikker ikke være synlige for de enkelte teammedlemmer: de er et værktøj til coaching, ikke til offentlige ranglister. Ved at følge disse metrikker og vejlede Scrum Masters indirekte giver du teams lige fod til at konkurrere.",{"title":159,"searchDepth":160,"depth":160,"links":316},[317,318],{"id":221,"depth":160,"text":222},{"id":239,"depth":160,"text":240,"children":319},[320,321,322,323],{"id":246,"depth":166,"text":247},{"id":273,"depth":166,"text":274},{"id":290,"depth":166,"text":291},{"id":307,"depth":166,"text":308},"2018-05-04","Metrikker skal skabe lige vilkår, ikke en rangliste. Fire sammenligningsmetrikker, der motiverer agile teams uden at straffe dem for lav præstation.","Metrikker til sammenligning af agile teams","\u002Fblog\u002Fcomparison-metrics-for-agile-teams\u002Fcoffee-table-ruler.jpg",[329,330,331,332,333],"agile metrikker","teamhastighed","agile teams","scrum","kapacitet",{},"\u002Fblog\u002Fda\u002Fcomparison-metrics-for-agile-teams",{"title":206,"description":325},{"loc":335,"images":338,"lastmod":179},[339,340,341],{"loc":215},{"loc":231},{"loc":257},"comparison-metrics-for-agile-teams","blog\u002Fda\u002Fcomparison-metrics-for-agile-teams","esfNthBGwhnMIprq6Sons270-reJfQ_WDcn4XLw-ARc",{"id":346,"title":347,"author":7,"body":348,"dateModified":179,"datePublished":486,"description":487,"extension":182,"heading":488,"image":489,"imageAlt":354,"keywords":490,"locale":191,"meta":495,"navigation":193,"path":496,"reviewed":193,"seo":497,"sitemap":498,"slug":506,"stem":507,"translationKey":506,"__hash__":508},"blog\u002Fblog\u002Fda\u002Fsheepherding-story-points.md","Fåreeffekten i story points: forankring i planning poker | AELBOX",{"type":9,"value":349,"toc":477},[350,356,359,363,370,378,382,386,389,392,399,403,406,410,413,418,422,426,429,436,440,444,447,452,456,460,471,474],[12,351,352],{},[15,353],{"alt":354,"height":18,"loading":19,"src":355,"width":21,"fetchPriority":22},"En flok får og planning poker-kort på et sofabord","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.webp",[12,357,358],{},"Story point-estimering bliver ofte forsømt eller foregår i chatrum og åbne møder, hvor alle kan se eller høre hver stemme. At vide, hvordan andre stemte, forvrænger resultatet og giver upræcise estimater. Gentagne upræcise estimater fører til fejlbehæftede planer og forsinkede eller aflyste leverancer. Her er, hvad der sker ved en åben afstemning.",[41,360,362],{"id":361},"personerne-i-afstemningen","Personerne i afstemningen",[12,364,365,366,369],{},"Der dukker flere personer op ved en åben estimeringsafstemning. Estimatet afhænger af, hvem der stemmer først, og det er sjældent ærligt. Hvorfor betyder rækkefølgen så meget ved en åben afstemning? På grund af ",[267,367,368],{},"fåreeffekten",": forankringsbias, der får de andre teammedlemmer til at kopiere det første estimat.",[12,371,372],{},[15,373],{"alt":374,"height":375,"loading":32,"src":376,"width":377,"decoding":34},"Fåreeffekten",746,"\u002Fblog\u002Fsheepherding-story-points\u002Fsheep-1.png",1779,[12,379,380],{},[38,381,374],{},[65,383,385],{"id":384},"den-selvsikre-stemmeberettigede","Den selvsikre stemmeberettigede",[12,387,388],{},"Hvert team har mindst ét medlem, som mener at kende systemet bedst. De stemmer som regel først, fordi svarene virker oplagte for dem. De overser ofte detaljer, der kan afspore estimatet. De detaljer kan afdækkes på forhånd, men kun hvis nogen sætter en diskussion i gang. Det kan ikke ske ved en åben afstemning.",[12,390,391],{},"Denne person stemmer som regel lavere end det ærlige estimat. Måske kunne kun de færdiggøre historien så hurtigt, og kun med held.",[12,393,394],{},[15,395],{"alt":385,"height":396,"loading":32,"src":397,"width":398,"decoding":34},290,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg7.png",600,[12,400,401],{},[38,402,385],{},[12,404,405],{},"Alle andre følger efter, så opgaven ser nem ud og mulig for enhver inden for den afsatte tid. I praksis ender en anden som regel med at udføre den.",[65,407,409],{"id":408},"den-stille-stemmeberettigede","Den stille stemmeberettigede",[12,411,412],{},"Der er som regel mere end én stille stemmeberettiget, og de er bange for at stemme først. De venter på, at en anden stemmer, så de kan kopiere det. De deltager sjældent i diskussionen og svarer kun, når de bliver spurgt. De stemmer som nummer to, lige før de uengagerede.",[12,414,415],{},[15,416],{"alt":409,"height":396,"loading":32,"src":417,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg5.png",[12,419,420],{},[38,421,409],{},[65,423,425],{"id":424},"den-uengagerede-stemmeberettigede","Den uengagerede stemmeberettigede",[12,427,428],{},"De er svære at få fat på under implementeringen, men deres adfærd er tydelig under afstemningen. De stemmer altid sidst og kopierer en andens estimat. Hvis estimaterne er forskellige, vælger de det mest almindelige. De vil ikke forklare, hvorfor de valgte et lavere eller højere tal, så de undgår at samarbejde i refinement og viger uden om spørgsmål.",[12,430,431],{},[15,432],{"alt":425,"height":433,"loading":32,"src":434,"width":435,"decoding":34},353,"\u002Fblog\u002Fsheepherding-story-points\u002Fimg4.png",758,[12,437,438],{},[38,439,425],{},[65,441,443],{"id":442},"den-trætte-stemmeberettigede","Den trætte stemmeberettigede",[12,445,446],{},"Nogle teammedlemmer kan ikke holde fokus længe og misser centrale dele af diskussionen. De mister konteksten og gætter eller leder efter den mest almindelige stemme at kopiere.",[12,448,449],{},[15,450],{"alt":443,"height":396,"loading":32,"src":451,"width":398,"decoding":34},"\u002Fblog\u002Fsheepherding-story-points\u002Fimg6.png",[12,453,454],{},[38,455,443],{},[41,457,459],{"id":458},"sådan-holder-du-opmærksomheden-under-estimeringen","Sådan holder du opmærksomheden under estimeringen",[12,461,462,463,467,468,470],{},"Estimering betyder noget, fordi kun ærlige story points kan ",[49,464,466],{"href":465},"\u002Fda\u002Fblog\u002Fcorrectly-estimating-release-deadline","holde et projekt på sporet mod sin releasedato",". Nøglen til ærlig estimering er at modvirke ",[267,469,368],{},", uanset om du bruger papirkort eller software.",[12,472,473],{},"Teammedlemmerne bør aldrig se hinandens estimater, før moderator afslører dem. På den måde begynder den stille stemmeberettigede at tænke, den uengagerede bliver interesseret, og den trætte vågner. Det bedste spørgsmål, især når nogen er uenig med gruppen, er “hvorfor stemte du X story points?” Det starter en samtale om de reelle implementeringsproblemer. Lukkede spørgsmål som “er du enig i X story points?” inviterer til et meningsløst “ja”.",[12,475,476],{},"Et godt estimeringsværktøj gør refinement mere engagerende og holder alle årvågne og klar til at diskutere, så selv komplekse historier får bedre estimater.",{"title":159,"searchDepth":160,"depth":160,"links":478},[479,485],{"id":361,"depth":160,"text":362,"children":480},[481,482,483,484],{"id":384,"depth":166,"text":385},{"id":408,"depth":166,"text":409},{"id":424,"depth":166,"text":425},{"id":442,"depth":166,"text":443},{"id":458,"depth":160,"text":459},"2018-04-30","Åbne afstemninger lader det første estimat forankre hele rummet. Se hvordan fåreeffekten fordrejer story points, og hvordan planning poker foregår ærligt.","Fåreeffekten og story points","\u002Fblog\u002Fsheepherding-story-points\u002Fcoffee-table-sheep.jpg",[491,492,493,368,494],"story points","planning poker","forankringsbias","agil estimering",{},"\u002Fblog\u002Fda\u002Fsheepherding-story-points",{"title":347,"description":487},{"loc":496,"images":499,"lastmod":179},[500,501,502,503,504,505],{"loc":355},{"loc":376},{"loc":397},{"loc":417},{"loc":434},{"loc":451},"sheepherding-story-points","blog\u002Fda\u002Fsheepherding-story-points","WVfGE7qeoBKtxCZATQcVqu-RGREY6tJgDhI01AjxUFA",{"id":510,"title":511,"author":7,"body":512,"dateModified":179,"datePublished":585,"description":586,"extension":182,"heading":587,"image":588,"imageAlt":518,"keywords":589,"locale":191,"meta":594,"navigation":193,"path":595,"reviewed":193,"seo":596,"sitemap":597,"slug":602,"stem":603,"translationKey":602,"__hash__":604},"blog\u002Fblog\u002Fda\u002Fthe-10-percent-scrumban-rule-for-every-sprint.md","Scrumban-reglen om 10 procent for hver sprint | AELBOX",{"type":9,"value":513,"toc":580},[514,521,529,533,536,544,548,552,555,559,562,565,573,577],[12,515,516],{},[15,517],{"alt":518,"height":519,"loading":19,"src":520,"width":21,"fetchPriority":22},"Planning poker-kort og et Kanban-board på et sofabord",959,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.webp",[12,522,523,524,528],{},"Mange teams planlægger med præcis den kapacitet, der står i deres Jira-plan. Det er ofte en fejl og fører til mislykkede sprints. Hvorfor sker det, når ",[49,525,527],{"href":526},"\u002Fda\u002Fblog\u002Fthe-importance-of-predictable-velocity","kapacitetsberegningerne"," ser så præcise ud?",[41,530,532],{"id":531},"trangen-til-at-levere-mere","Trangen til at levere mere",[12,534,535],{},"Product Owners presser ofte på for højere hastighed efter hver vellykket sprint, en naturlig reaktion på de seneste resultater. Hvis teamet færdiggjorde et bestemt antal story points i sidste sprint, forventes det at færdiggøre flere i næste sprint. Det gentages, indtil en sprint mislykkes. Presset er et forsøg på at teste teamets grænser. Efter vores erfaring er det kontraproduktivt. Det demotiverer i sidste ende teamet, som begynder at se hver kommende sprint som dømt til at mislykkes.",[12,537,538],{},[15,539],{"alt":540,"height":541,"loading":32,"src":542,"width":543,"decoding":34},"Den dømte sprint",349,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg1.png",400,[12,545,546],{},[38,547,540],{},[41,549,551],{"id":550},"den-hektiske-afslutning-på-en-sprint-under-leveringspres","Den hektiske afslutning på en sprint under leveringspres",[12,553,554],{},"Når kapaciteten planlægges til at fylde sprinten præcis, skaber enhver forsinkelse eller realiseret risiko pres for at arbejde i et hæsblæsende tempo til sidst. Teamet leverer så mindre end lovet, fordi stressen overtager. Det rush i slutningen af sprinten bør fjernes.",[41,556,558],{"id":557},"lad-teamet-levere-mere-af-egen-vilje","Lad teamet levere mere af egen vilje",[12,560,561],{},"Planlæg kun 90 procent af teamets kapacitet, og reserver de resterende 10 procent til uplanlagt backlog-arbejde. De opgaver trækkes fra backloggen på Scrumban-vis i løbet af sprinten. Bufferen absorberer risiko og lader teamet afslutte sprinten (eller i det mindste sprintmålet) et par dage før tid. Hvis en ekstern afhængighed truer sprinten, kan en bufferopgave erstatte den problematiske.",[12,563,564],{},"De 10 procent er ikke en del af sprintforpligtelsen. Hvis risikoen ikke materialiserer sig, leverer teamet det som ekstra arbejde; hvis noget går galt, bliver bufferen brugt, men sprintmålet og forpligtelsen holder stadig. Hold øje med, hvor meget af bufferen der bruges: hvis den regelmæssigt når 20 procent, er det for eksempel tid til at hæve teamets hastighed med 10 procent og beholde bufferen på 10 procent.",[12,566,567],{},[15,568],{"alt":569,"height":570,"loading":32,"src":571,"width":572,"decoding":34},"Lever tidligt, lever ekstra",320,"\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fimg3-1.png",296,[12,574,575],{},[38,576,569],{},[12,578,579],{},"Vores erfaring viser, at det er her, medarbejderne arbejder uden pres og bidrager mest. Hastigheden kan derefter stige i teamets eget tempo, uden pres udefra og med mindre stress. Stigningen føles naturlig og holdbar.",{"title":159,"searchDepth":160,"depth":160,"links":581},[582,583,584],{"id":531,"depth":160,"text":532},{"id":550,"depth":160,"text":551},{"id":557,"depth":160,"text":558},"2018-04-28","Fuld kapacitet gør hver sprint skrøbelig. En Scrumban-buffer på 10 procent absorberer risiko, beskytter sprintmålet og lader hastigheden vokse naturligt.","Scrumban-reglen om 10 procent for hver sprint","\u002Fblog\u002Fthe-10-percent-scrumban-rule-for-every-sprint\u002Fcoffee-table-scrumban.jpg",[590,591,592,593,332],"scrumban","sprintkapacitet","agil buffer","hastighed",{},"\u002Fblog\u002Fda\u002Fthe-10-percent-scrumban-rule-for-every-sprint",{"title":511,"description":586},{"loc":595,"images":598,"lastmod":179},[599,600,601],{"loc":520},{"loc":542},{"loc":571},"the-10-percent-scrumban-rule-for-every-sprint","blog\u002Fda\u002Fthe-10-percent-scrumban-rule-for-every-sprint","3Y4Mrq0lpTBUbnUmFzdWF03rBEaRKDcEI9c-A_aLRJk",{"id":606,"title":607,"author":7,"body":608,"dateModified":179,"datePublished":786,"description":787,"extension":182,"heading":788,"image":789,"imageAlt":614,"keywords":790,"locale":191,"meta":794,"navigation":193,"path":795,"reviewed":193,"seo":796,"sitemap":797,"slug":805,"stem":806,"translationKey":805,"__hash__":807},"blog\u002Fblog\u002Fda\u002Fcorrectly-estimating-release-deadline.md","Sådan estimerer du en releasedato med story points | AELBOX",{"type":9,"value":609,"toc":772},[610,616,619,623,630,634,637,645,649,653,656,659,663,666,674,679,683,686,690,693,697,700,707,712,716,719,723,726,734,738,742,745,750,757,765,769],[12,611,612],{},[15,613],{"alt":614,"height":18,"loading":19,"src":615,"width":21,"fetchPriority":22},"Planning poker-kort, et Gantt-diagram og en kaffekop på et bord","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.webp",[12,617,618],{},"En vigtig del af projektledelse er at estimere en releasedato for et projekt. Men hvordan forudsiger du, hvornår et stort og komplekst system bliver leveret?",[41,620,622],{"id":621},"estimeringsproblemerne","Estimeringsproblemerne",[12,624,625,626,629],{},"For at levere til tiden har du brug for et pålideligt estimat af arbejdet. ",[49,627,628],{"href":526},"At estimere opgaver er ofte svært",", især når du skal forpligte dig til tidsbaserede estimater for hver opgave. Psykologisk er det svært at forpligte sig til et færdiggørelsestidspunkt, og de forpligtelser holder ofte ikke.",[65,631,633],{"id":632},"problemet-med-tid","Problemet med tid",[12,635,636],{},"At estimere tid er problematisk af en enkel grund: jo mere kompleks opgaven er, jo større er chancen for at misse deadline. Det afhænger også af, hvem der tager opgaven. Teammedlemmer arbejder i forskelligt tempo og leverer forskellige mængder arbejde. Fordi tilgængeligheden ændrer sig med ferie og uddannelse, kan en opgave, der er estimeret af det hurtigste teammedlem, ende hos det langsomste. Det pæne Gantt-diagram bliver til et rod: opgaver bliver forsinkede, og ledere bekymrer sig konstant om, hvorvidt projektet bliver færdigt i tide.",[12,638,639],{},[15,640],{"alt":641,"height":642,"loading":32,"src":643,"width":644,"decoding":34},"Et brudt Gantt-diagram",351,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory1.png",510,[12,646,647],{},[38,648,641],{},[65,650,652],{"id":651},"modstanden-mod-tidsestimater","Modstanden mod tidsestimater",[12,654,655],{},"Når dem, der skal implementere, bliver bedt om et estimat, protesterer de ofte: hvis estimatet ikke holder, hvem har så skylden? Og hvis en opgave, som én person har estimeret, ender hos en anden, hvem får så skylden, når den faktiske tid afviger?",[12,657,658],{},"Resultatet er modvilje mod at estimere overhovedet, hvilket gør det svært for ledelsen at estimere leveringsdatoer ordentligt.",[41,660,662],{"id":661},"brug-af-story-points","Brug af story points",[12,664,665],{},"Story points er et alternativ til tidsbaserede estimater. Et story point er ikke en fast enhed af arbejde; det er et relativt estimat, der vokser eksponentielt. Hele teamet estimerer sammen under refinement.",[12,667,668],{},[15,669],{"alt":670,"height":671,"loading":32,"src":672,"width":673,"decoding":34},"Eksempel på story points",210,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory2.png",801,[12,675,676],{},[38,677,678],{},"Eksempel på estimater",[65,680,682],{"id":681},"fælles-ansvar","Fælles ansvar",[12,684,685],{},"Med story points estimerer hele teamet hver opgave. Estimatet accepteres, når alle er enige om det. Det undgår senere diskussioner om, hvem der estimerede opgaven, og hvor lang tid den reelt tog. Teamet blev enige på forhånd, så ansvaret er delt.",[65,687,689],{"id":688},"estimering-af-kompleksitet","Estimering af kompleksitet",[12,691,692],{},"Story points fanger kompleksiteten i en opgave, herunder eksterne afhængigheder og risikoen for, at noget går galt. Fordi de ikke er en forpligtelse til en fysisk størrelse som tid, er de lettere for teamet at give.",[65,694,696],{"id":695},"det-mindste-estimat","Det mindste estimat",[12,698,699],{},"Fordi story points er relative, har du brug for et anker at starte fra. Ankeret er den mindste arbejdsenhed, der kræver en vis implementeringsindsats. Det er den mindste mængde arbejde, teamet kan estimere.",[12,701,702],{},[15,703],{"alt":696,"height":704,"loading":32,"src":705,"width":706,"decoding":34},206,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory3.png",141,[12,708,709],{},[38,710,711],{},"Det laveste estimat",[65,713,715],{"id":714},"det-største-estimat","Det største estimat",[12,717,718],{},"Story points vokser eksponentielt for at vise, at jo mere kompleks en opgave er, jo sværere er den at estimere. Skalaen kan strække sig til uendelig (∞), selv om det estimat sjældent bruges. Det største estimat bør være det meste arbejde, én person kan færdiggøre i en sprint i gennemsnit. Selve sprintlængden bør matche den største mængde arbejde, én person kan håndtere uden at miste overblikket over opgaven.",[65,720,722],{"id":721},"historier-der-er-større-end-det-største-estimat","Historier, der er større end det største estimat",[12,724,725],{},"Nogle opgaver får flere story points, end én person kan færdiggøre i en sprint. Kommer de i en sprint, giver det overførsel. Overførsel får sprinten til at føles ufuldstændig og arbejdet til at føles uafsluttet. Opgaver, der estimeres over den grænse, skal opdeles i mindre enheder og estimeres igen.",[12,727,728],{},[15,729],{"alt":730,"height":731,"loading":32,"src":732,"width":733,"decoding":34},"Opdeling af 13 story points",201,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory4.png",272,[12,735,736],{},[38,737,730],{},[41,739,741],{"id":740},"hastigheden-i-story-points","Hastigheden i story points",[12,743,744],{},"Hastighed er det gennemsnitlige antal story points, et team færdiggør i en sprint ved fuld tilgængelighed. Tilgængelighed er den andel af sprinten, teamet reelt kan bruge på projektarbejde efter ferie, uddannelse og support. Kapacitet er hastighed ganget med tilgængelighed.",[12,746,747],{},[38,748,749],{},"kapacitet = hastighed × tilgængelighed",[12,751,752,753,756],{},"Fordi kapaciteten udtrykkes i story points, kan den omregnes til tid ved hjælp af teamets forhold mellem story points og tid. Når ",[49,754,755],{"href":526},"hastigheden er forudsigelig",", kan releasedatoen estimeres præcist. Ud fra story points og sprints bliver det resulterende Gantt-diagram stabilt og forudsigeligt:",[12,758,759],{},[15,760],{"alt":761,"height":762,"loading":32,"src":763,"width":764,"decoding":34},"Et rettet Gantt-diagram",362,"\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fstory5.png",519,[12,766,767],{},[38,768,761],{},[12,770,771],{},"Det er skiftet: når først hastigheden er stabil, bliver releasedatoen en beregning i stedet for et gæt.",{"title":159,"searchDepth":160,"depth":160,"links":773},[774,778,785],{"id":621,"depth":160,"text":622,"children":775},[776,777],{"id":632,"depth":166,"text":633},{"id":651,"depth":166,"text":652},{"id":661,"depth":160,"text":662,"children":779},[780,781,782,783,784],{"id":681,"depth":166,"text":682},{"id":688,"depth":166,"text":689},{"id":695,"depth":166,"text":696},{"id":714,"depth":166,"text":715},{"id":721,"depth":166,"text":722},{"id":740,"depth":160,"text":741},"2018-04-14","Tidsestimater fejler, når kompleksitet og tilgængelighed ændrer sig. Se hvordan story points, fælles estimater og hastighed gør releasedatoer forudsigelige.","Sådan estimerer du en releasedato","\u002Fblog\u002Fcorrectly-estimating-release-deadline\u002Fcoffee-table-gantt-cards.jpg",[791,491,494,792,793],"releasedato","sprint-hastighed","kapacitetsplanlægning",{},"\u002Fblog\u002Fda\u002Fcorrectly-estimating-release-deadline",{"title":607,"description":787},{"loc":795,"images":798,"lastmod":179},[799,800,801,802,803,804],{"loc":615},{"loc":643},{"loc":672},{"loc":705},{"loc":732},{"loc":763},"correctly-estimating-release-deadline","blog\u002Fda\u002Fcorrectly-estimating-release-deadline","etCk9riSWnRXXhi9LHu33e1MWvEJ-QUO_nXkdejW6Jg",{"id":809,"title":810,"author":7,"body":811,"dateModified":179,"datePublished":786,"description":957,"extension":182,"heading":958,"image":959,"imageAlt":817,"keywords":960,"locale":191,"meta":963,"navigation":193,"path":964,"reviewed":193,"seo":965,"sitemap":966,"slug":972,"stem":973,"translationKey":972,"__hash__":974},"blog\u002Fblog\u002Fda\u002Fthe-importance-of-predictable-velocity.md","Forudsigelig hastighed: pålidelige sprintforpligtelser | AELBOX",{"type":9,"value":812,"toc":947},[813,819,822,826,829,832,835,843,847,851,854,858,861,864,871,878,882,886,889,892,895,898,902,905,908,915,919,923,931,934,938,944],[12,814,815],{},[15,816],{"alt":817,"height":18,"loading":19,"src":818,"width":21,"fetchPriority":22},"Planning poker-kort og et stopur på et sofabord","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.webp",[12,820,821],{},"Forudsigelig hastighed er evnen til på forhånd at vide, hvor meget arbejde et team færdiggør i en given periode, ud fra dets tilgængelighed.",[41,823,825],{"id":824},"problemet-med-svingende-hastighed","Problemet med svingende hastighed",[12,827,828],{},"Når hastigheden svinger mellem sprints, bliver det svært at planlægge en release. Ingen ved, hvornår arbejdet bliver leveret, og hele Scrum-processen bryder sammen. Kaos overtager, og det gør ikke noget godt for teamets moral.",[12,830,831],{},"Svingende hastighed opstår som regel, fordi teammedlemmerne prøver at gøre deres bedste og forpligter sig til mere, end de kan levere. I et samarbejdsmiljø med en velfungerende udviklingsproces er en opgave mere end lige ud implementering. Nogle teammedlemmer er heldige og får opgaver, der er forholdsvis enkle at implementere, mens andre støder på et problem, som ingen havde forudset. I én sprint ser hastigheden høj ud, fordi teamet afslutter overførte opgaver; i den næste falder den, fordi der opstår nye overførsler.",[12,833,834],{},"Overførsler skaber indtryk af, at teamet præsterer for lidt: det kunne gøre mere, men noget uforudsigeligt kommer altid i vejen. Ledelsen bemærker problemet, ser de overskredne deadlines, og spændingen mellem teammedlemmerne vokser.",[12,836,837],{},[15,838],{"alt":839,"height":840,"loading":32,"src":841,"width":842,"decoding":34},"Almindelig sprint med overførte opgaver",198,"\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory6.png",461,[12,844,845],{},[38,846,839],{},[41,848,850],{"id":849},"de-typiske-problemer-med-at-bevare-forudsigeligheden","De typiske problemer med at bevare forudsigeligheden",[12,852,853],{},"Problemerne varierer fra projekt til projekt, men mange er fælles for alle typer projekter. Her er de sædvanlige, med praktiske løsninger.",[65,855,857],{"id":856},"forvent-det-uventede","Forvent det uventede",[12,859,860],{},"Nogle opgaver kræver research, før de kan starte. Forestil dig en funktion, der afhænger af en tredjepartsvirksomhed, som måske ikke svarer, når du har brug for det. Eller en funktion, der ikke kan implementeres som planlagt, fordi teamet misforstod den underliggende teknologi, da opgaven blev oprettet.",[12,862,863],{},"Hvis en sådan opgave kommer i en sprint uden den nødvendige research, tager den sandsynligvis længere tid end forventet, og estimatet får skylden. Nogle vil hævde, at man har brug for en spike for at undersøge emnet først. Men hvordan ved du, hvilke opgaver der har brug for en?",[12,865,866,867,870],{},"Den eneste vej er at ",[49,868,869],{"href":300},"begynde på en opgave i god tid",". Når du starter, før opgaven er planlagt, kan du finde problemerne, før de opstår. Med den tilgang kommer en opgave først i en sprint, når den er klar, og en del af arbejdet allerede er gjort.",[12,872,873],{},[15,874],{"alt":875,"height":840,"loading":32,"src":876,"width":877,"decoding":34},"Sprints med opgaver, der er startet i god tid","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory7.png",721,[12,879,880],{},[38,881,875],{},[65,883,885],{"id":884},"undgå-upræcise-opgavebeskrivelser","Undgå upræcise opgavebeskrivelser",[12,887,888],{},"Nogle opgaver ser fine ud for dem, der har oprettet dem, men udelader vigtige detaljer. Nogle implementeringsdetaljer kan påvirke leverancen alvorligt.",[12,890,891],{},"Forretningsinteressenter vil måske hævde, at opgavebeskrivelser ikke bør indeholde tekniske detaljer, men dem, der skal implementere, synes ofte, at forretningskravene er for vage at arbejde ud fra.",[12,893,894],{},"Løsningen er et teknisk designdokument, som implementeringsopgaven henviser til. Det gør det klart, præcis hvad der skal bygges.",[12,896,897],{},"Det hjælper også at have tekniske detaljer med i opgavebeskrivelsen, så dem, der implementerer, ved hvad der skal gøres, og kan spotte potentielle problemer tidligt.",[65,899,901],{"id":900},"reducer-kapaciteten-med-fibonacci-rækken","Reducer kapaciteten med Fibonacci-rækken",[12,903,904],{},"Nogle gange holder teammedlemmer ferie, eller en helligdag falder i en sprint. Uddannelse og interne arrangementer reducerer også tilgængeligheden: den tid, teamet kan bruge på projektarbejde. I så fald skal kapaciteten reduceres, så den afspejler de manglende personer.",[12,906,907],{},"Hastigheden antages at være konstant, men den beregnes ud fra gennemsnitshastigheden for alle i teamet. Antag for nemheds skyld, at én person færdiggør ét story point om dagen. Hvis én person mangler én dag, reduceres sprintens kapacitet med ét story point. Hvis to personer mangler i to dage (fire story points), reduceres kapaciteten med fem story points (det næste Fibonacci-tal) i stedet for fire. Hvis to personer mangler i tre dage, reduceres kapaciteten med otte point i stedet for seks for at tage højde for afhængighedsrisiko.",[12,909,910],{},[15,911],{"alt":912,"height":840,"loading":32,"src":913,"width":914,"decoding":34},"At forpligte sig til mindre kapacitet end beregnet","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fstory8.png",392,[12,916,917],{},[38,918,912],{},[65,920,922],{"id":921},"undgå-afhængige-opgaver","Undgå afhængige opgaver",[12,924,925,926,930],{},"Ofte færdiggør én person en opgave, som en anden teammedlems opgave afhænger af. Det skaber ",[49,927,929],{"href":928},"\u002Fda\u002Fblog\u002Fmanage-sprint-dependencies-with-chained-pull-requests","afhængigheder i teamet eller mellem teams",". Hvis den første opgave er forsinket, rykker alle afhængige opgaver. Teammedlemmerne går ledige og skynder sig derefter, når afhængigheden er løst, hvilket spilder værdifuld tid.",[12,932,933],{},"Afhængige opgaver kan starte tidligere, så de kritiske opstrøms opgaver næsten er færdige ved næste sprint. Det reducerer afhængighedens betydning for hastigheden i den aktuelle sprint.",[65,935,937],{"id":936},"estimér-ærligt","Estimér ærligt",[12,939,940,943],{},[49,941,942],{"href":286},"At estimere opgaver ærligt"," er svært og kræver hele teamets opmærksomhed. Alle bør estimere uden at blive påvirket af de andres estimater. Kun ærlige estimater viser, hvor lang tid et epic reelt tager, og holder releasedatoerne realistiske.",[12,945,946],{},"Forudsigelig hastighed er ikke et værktøj eller en metrik, du pålægger et team; det er resultatet af at fjerne overraskelser én ad gangen. Start med de fem tiltag ovenfor, og releasedatoen holder op med at være et gæt.",{"title":159,"searchDepth":160,"depth":160,"links":948},[949,950],{"id":824,"depth":160,"text":825},{"id":849,"depth":160,"text":850,"children":951},[952,953,954,955,956],{"id":856,"depth":166,"text":857},{"id":884,"depth":166,"text":885},{"id":900,"depth":166,"text":901},{"id":921,"depth":166,"text":922},{"id":936,"depth":166,"text":937},"Hvorfor hastigheden svinger mellem sprints, og hvordan forpligtelser bliver forudsigelige: fem praktiske tiltag til planlægning, kapacitet og afhængigheder.","Hvorfor forudsigelig hastighed er vigtig","\u002Fblog\u002Fthe-importance-of-predictable-velocity\u002Fcoffee-table-chronometer.jpg",[961,792,494,491,962],"forudsigelig hastighed","release-planlægning",{},"\u002Fblog\u002Fda\u002Fthe-importance-of-predictable-velocity",{"title":810,"description":957},{"loc":964,"images":967,"lastmod":179},[968,969,970,971],{"loc":818},{"loc":841},{"loc":876},{"loc":913},"the-importance-of-predictable-velocity","blog\u002Fda\u002Fthe-importance-of-predictable-velocity","-M4DoY0aV3Vjxarkj6dynJNn7EonSV_kpsdyuz0SGYM",1795345547763]